2 resultados para product modelling

em WestminsterResearch - UK


Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper aims to present a state-of-the-art review of the scope and practical implications of the Building Information Modelling (BIM) platform in the UK construction practice. Theoretical developments suggest that BIM is an integration of both product and process innovation, not just a disparate set of software tools. BIM provides effective collaboration, visual representation and data management, which enable the smooth flow of information throughout the project’s lifecycle. The most frequently reported benefits are related to Capital Cost (capex) and Operational costs (opex) and time savings. Key challenges, however, focus on the interoperability of software, capital installation costs, in-house experience, client preference and cultural issues within design teams and within the organisation. The paper concludes with a critical commentary on the changing roles and a process required to implement BIM in UK construction projects, and suggests areas for further research.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

As identified by Griffin (1997) and Kahn (2012), manufacturing organisations typically improve their market position by accelerating their product development (PD) cycles. One method for achieving this is to reduce the time taken to design, test and validate new products, so that they can reach the end customer before competition. This paper adds to existing research on PD testing procedures by reporting on an exploratory investigation carried out in a UK-based manufacturing plant. We explore the organisational and managerial factors that contribute to the time spent on testing of new products during development. The investigation consisted of three sections, viz. observations and process modelling, utilisation metrics and a questionnaire-based investigation, from which a proposed framework to improve and reduce the PD time cycle is presented. This research focuses specifically on the improvement of the utilisation of product testing facilities and the links to its main internal stakeholders - PD engineers.