4 resultados para cost benefit analysis

em WestminsterResearch - UK


Relevância:

80.00% 80.00%

Publicador:

Resumo:

Estimates of airline delay costs as a function of delay magnitude are combined with fuel and (future) emissions charges to make cost-benefit trade-offs in the pre-departure and airborne phases. Hypothetical scenarios for the distribution of flow management slots are explored in terms of their cost and target-setting implications. The general superiority of passenger-centric metrics is of significance for delay measurement, although flight delays are still the only commonly-reported type of metric in both the US and Europe. There is a particular need for further research into reactionary (network) effects, especially with regard to passenger metrics and flow management delay.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Existing Workflow Management Systems (WFMSs) follow a pragmatic approach. They often use a proprietary modelling language with an intuitive graphical layout. However the underlying semantics lack a formal foundation. As a consequence, analysis issues, such as proving correctness i.e. soundness and completeness, and reliable execution are not supported at design level. This project will be using an applied ontology approach by formally defining key terms such as process, sub-process, action/task based on formal temporal theory. Current business process modelling (BPM) standards such as Business Process Modelling Notation (BPMN) and Unified Modelling Language (UML) Activity Diagram (AD) model their constructs with no logical basis. This investigation will contribute to the research and industry by providing a framework that will provide grounding for BPM to reason and represent a correct business process (BP). This is missing in the current BPM domain, and may result in reduction of the design costs and avert the burden of redundant terms used by the current standards. A graphical tool will be introduced which will implement the formal ontology defined in the framework. This new tool can be used both as a modelling tool and at the same time will serve the purpose of validating the model. This research will also fill the existing gap by providing a unified graphical representation to represent a BP in a logically consistent manner for the mainstream modelling standards in the fields of business and IT. A case study will be conducted to analyse a catalogue of existing ‘patient pathways’ i.e. processes, of King’s College Hospital NHS Trust including current performance statistics. Following the application of the framework, a mapping will be conducted, and new performance statistics will be collected. A cost/benefits analysis report will be produced comparing the results of the two approaches.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Existing Workflow Management Systems (WFMSs) follow a pragmatic approach. They often use a proprietary modelling language with an intuitive graphical layout. However the underlying semantics lack a formal foundation. As a consequence, analysis issues, such as proving correctness i.e. soundness and completeness, and reliable execution are not supported at design level. This project will be using an applied ontology approach by formally defining key terms such as process, sub-process, action/task based on formal temporal theory. Current business process modelling (BPM) standards such as Business Process Modelling Notation (BPMN) and Unified Modelling Language (UML) Activity Diagram (AD) model their constructs with no logical basis. This investigation will contribute to the research and industry by providing a framework that will provide grounding for BPM to reason and represent a correct business process (BP). This is missing in the current BPM domain, and may result in reduction of the design costs and avert the burden of redundant terms used by the current standards. A graphical tool will be introduced which will implement the formal ontology defined in the framework. This new tool can be used both as a modelling tool and at the same time will serve the purpose of validating the model. This research will also fill the existing gap by providing a unified graphical representation to represent a BP in a logically consistent manner for the mainstream modelling standards in the fields of business and IT. A case study will be conducted to analyse a catalogue of existing ‘patient pathways’ i.e. processes, of King’s College Hospital NHS Trust including current performance statistics. Following the application of the framework, a mapping will be conducted, and new performance statistics will be collected. A cost/benefits analysis report will be produced comparing the results of the two approaches.

Relevância:

50.00% 50.00%

Publicador:

Resumo:

Waterways have many more ties with society than as a medium for the transportation of goods alone. Waterway systems offer society many kinds of socio-economic value. Waterway authorities responsible for management and (re)development need to optimize the public benefits for the investments made. However, due to the many trade-offs in the system these agencies have multiple options for achieving this goal. Because they can invest resources in a great many different ways, they need a way to calculate the efficiency of the decisions they make. Transaction cost theory, and the analysis that goes with it, has emerged as an important means of justifying efficiency decisions in the economic arena. To improve our understanding of the value-creating and coordination problems for waterway authorities, such a framework is applied to this sector. This paper describes the findings for two cases, which reflect two common multi trade-off situations for waterway (re)development. Our first case study focuses on the Miami River, an urban revitalized waterway. The second case describes the Inner Harbour Navigation Canal in New Orleans, a canal and lock in an industrialized zone, in need of an upgrade to keep pace with market developments. The transaction cost framework appears to be useful in exposing a wide variety of value-creating opportunities and the resistances that come with it. These insights can offer infrastructure managers guidance on how to seize these opportunities.