11 resultados para cash flows
em WestminsterResearch - UK
Resumo:
The paper addresses road freight transport operations during the London Olympic and Paralympic Games in 2012. It presents work carried out prior to the Games to understand pre-Games patterns of freight deliveries in London (for both light and heavy goods vehicles) and the results of modelling work carried out to assess the likely impacts of the Games road restrictions on freight operations. The modelling results indicated that increases in total hours travelled carrying out collection and delivery work would range from 1.4% to 11.4% in the six sectors considered. The results suggested increases in hours travelled in excess of 3.5% in four of the six sectors modelled. The possible actions that could be taken by organizations to reduce these negative impacts were also modelled and the results indicated that such actions would help to mitigate the impact of the road restrictions imposed on operators during the Games. The actual impacts of the 2012 Games on transport both in general terms and specifically in terms of freight transport are also discussed, together with the success of the actions taken by Transport for London (TfL) to help the road freight industry. The potential freight transport legacy of the London 2012 Games in terms of achieving more sustainable urban freight transport is considered and the steps being taken by TfL to help ensure that such a legacy can be realized are discussed. Such steps include policy-makers continuing to collaborate closely with the freight industry through the ‘London Freight Forum’, and TfL's efforts to encourage and support companies revising their delivery and collection times to the off-peak; improving freight planning in the design and management of TfL-funded road schemes; electronic provision of traffic information by TfL to the freight industry, and the further development of freight journey planning tools.
Resumo:
We study a Conditional Cash Transfer program in which the cash transfers to the mother only depends on the fulfillment of the national preventive visit schedule by her children born before she registered in the program. We estimate that preventive visits of children born after the mother registered in the program are 50% lower because they are excluded from the conditionality requirement. Using the same variation, we also show that attendance to preventive care improves children's health.
Resumo:
Existing Workflow Management Systems (WFMSs) follow a pragmatic approach. They often use a proprietary modelling language with an intuitive graphical layout. However the underlying semantics lack a formal foundation. As a consequence, analysis issues, such as proving correctness i.e. soundness and completeness, and reliable execution are not supported at design level. This project will be using an applied ontology approach by formally defining key terms such as process, sub-process, action/task based on formal temporal theory. Current business process modelling (BPM) standards such as Business Process Modelling Notation (BPMN) and Unified Modelling Language (UML) Activity Diagram (AD) model their constructs with no logical basis. This investigation will contribute to the research and industry by providing a framework that will provide grounding for BPM to reason and represent a correct business process (BP). This is missing in the current BPM domain, and may result in reduction of the design costs and avert the burden of redundant terms used by the current standards. A graphical tool will be introduced which will implement the formal ontology defined in the framework. This new tool can be used both as a modelling tool and at the same time will serve the purpose of validating the model. This research will also fill the existing gap by providing a unified graphical representation to represent a BP in a logically consistent manner for the mainstream modelling standards in the fields of business and IT. A case study will be conducted to analyse a catalogue of existing ‘patient pathways’ i.e. processes, of King’s College Hospital NHS Trust including current performance statistics. Following the application of the framework, a mapping will be conducted, and new performance statistics will be collected. A cost/benefits analysis report will be produced comparing the results of the two approaches.
Resumo:
Existing Workflow Management Systems (WFMSs) follow a pragmatic approach. They often use a proprietary modelling language with an intuitive graphical layout. However the underlying semantics lack a formal foundation. As a consequence, analysis issues, such as proving correctness i.e. soundness and completeness, and reliable execution are not supported at design level. This project will be using an applied ontology approach by formally defining key terms such as process, sub-process, action/task based on formal temporal theory. Current business process modelling (BPM) standards such as Business Process Modelling Notation (BPMN) and Unified Modelling Language (UML) Activity Diagram (AD) model their constructs with no logical basis. This investigation will contribute to the research and industry by providing a framework that will provide grounding for BPM to reason and represent a correct business process (BP). This is missing in the current BPM domain, and may result in reduction of the design costs and avert the burden of redundant terms used by the current standards. A graphical tool will be introduced which will implement the formal ontology defined in the framework. This new tool can be used both as a modelling tool and at the same time will serve the purpose of validating the model. This research will also fill the existing gap by providing a unified graphical representation to represent a BP in a logically consistent manner for the mainstream modelling standards in the fields of business and IT. A case study will be conducted to analyse a catalogue of existing ‘patient pathways’ i.e. processes, of King’s College Hospital NHS Trust including current performance statistics. Following the application of the framework, a mapping will be conducted, and new performance statistics will be collected. A cost/benefits analysis report will be produced comparing the results of the two approaches.