2 resultados para Three Pillar Framework
em WestminsterResearch - UK
Resumo:
Climate change and continuous urbanization contribute to an increased urban vulnerability towards flooding. Only relying on traditional flood control measures is recognized as inadequate, since the damage can be catastrophic if flood controls fail. The idea of a flood-resilient city – one which can withstand or adapt to a flood event without being harmed in its functionality – seems promising. But what does resilience actually mean when it is applied to urban environments exposed to flood risk, and how can resilience be achieved? This paper presents a heuristic framework for assessing the flood resilience of cities, for scientists and policy-makers alike. It enriches the current literature on flood resilience by clarifying the meaning of its three key characteristics – robustness, adaptability and transformability – and identifying important components to implement resilience strategies. The resilience discussion moves a step forward, from predominantly defining resilience to generating insight into “doing” resilience in practice. The framework is illustrated with two case studies from Hamburg, showing that resilience, and particularly the underlying notions of adaptability and transformability, first and foremost require further capacity-building among public as well as private stakeholders. The case studies suggest that flood resilience is currently not enough motivation to move from traditional to more resilient flood protection schemes in practice; rather, it needs to be integrated into a bigger urban agenda.
Resumo:
As identified by Griffin (1997) and Kahn (2012), manufacturing organisations typically improve their market position by accelerating their product development (PD) cycles. One method for achieving this is to reduce the time taken to design, test and validate new products, so that they can reach the end customer before competition. This paper adds to existing research on PD testing procedures by reporting on an exploratory investigation carried out in a UK-based manufacturing plant. We explore the organisational and managerial factors that contribute to the time spent on testing of new products during development. The investigation consisted of three sections, viz. observations and process modelling, utilisation metrics and a questionnaire-based investigation, from which a proposed framework to improve and reduce the PD time cycle is presented. This research focuses specifically on the improvement of the utilisation of product testing facilities and the links to its main internal stakeholders - PD engineers.