5 resultados para Short take-off and landing aircraft.
em WestminsterResearch - UK
Resumo:
Ground Delay Programs (GDP) are sometimes cancelled before their initial planned duration and for this reason aircraft are delayed when it is no longer needed. Recovering this delay usually leads to extra fuel consumption, since the aircraft will typically depart after having absorbed on ground their assigned delay and, therefore, they will need to cruise at more fuel consuming speeds. Past research has proposed speed reduction strategy aiming at splitting the GDP-assigned delay between ground and airborne delay, while using the same fuel as in nominal conditions. Being airborne earlier, an aircraft can speed up to nominal cruise speed and recover part of the GDP delay without incurring extra fuel consumption if the GDP is cancelled earlier than planned. In this paper, all GDP initiatives that occurred in San Francisco International Airport during 2006 are studied and characterised by a K-means algorithm into three different clusters. The centroids for these three clusters have been used to simulate three different GDPs at the airport by using a realistic set of inbound traffic and the Future Air Traffic Management Concepts Evaluation Tool (FACET). The amount of delay that can be recovered using this cruise speed reduction technique, as a function of the GDP cancellation time, has been computed and compared with the delay recovered with the current concept of operations. Simulations have been conducted in calm wind situation and without considering a radius of exemption. Results indicate that when aircraft depart early and fly at the slower speed they can recover additional delays, compared to current operations where all delays are absorbed prior to take-off, in the event the GDP cancels early. There is a variability of extra delay recovered, being more significant, in relative terms, for those GDPs with a relatively low amount of demand exceeding the airport capacity.
Resumo:
Discusses part of a project conducted by the authors into the logistics planning and management and costs of supplying biomass fuels to biomass-fired power stations in the UK. Defines biomass fuels and the reasons for the growth in interest in their use for electricity generation. The activities and parties involved in the biomass fuel supply chain are discussed together with the management of the chain in order to achieve smooth and consistent flow of biomass fuel to power stations. Explains the approach used to modelling the delivered costs of biomass fuels for four types of biomass fuel included in the project: forest fuel, short rotation coppice, straw and miscanthus. Comments are given on the environmental impacts of the fuel supply chains. The results indicate that straw supply systems are capable of producing the lowest delivered costs of the four fuels studied. Short rotation coppice and miscanthus, two new energy crops, are likely to have the highest delivered costs at present. This is due to the cost of growing these fuels and the financial incentives required by farmers to persuade them to grow these crops. Logistics costs (i.e. transport, storage and handling) are shown to represent a significant proportion of total delivered cost in biomass supply. Careful supply chain planning and logistics management will be of central importance to the success of the biomass industry.
Resumo:
Reactionary delays constitute nearly half of all delay minutes in Europe. A capped, multi-component model is presented for estimating reactionary delay costs, as a non-linear function of primary delay duration. Maximum Take-Off Weights, historically established as a charging mechanism, may be used to model delay costs. Current industry reporting on delay is flight-centric. Passenger-centric metrics are needed to better understand delay propagation. In ATM, it is important to take account of contrasting flight- and passenger-centric effects, caused by cancellations, for example. Costs to airlines and passenger disutility will both continue to be driven by delay relative to the original schedule.
Resumo:
In recent years, airlines have been servicing a greater variety, and increasing numbers, of disabled persons and persons with reduced mobility (PRMs), particularly associated with ageing, obesity and medical needs. With the quantity of PRMs likely to increase in the future, there will be a growing impact on the airlines' associated actual and opportunity costs, about which there is minimal literature and data. Therefore the aim of this paper is to identify standard functional key factors (FKFs) with which airlines could audit their PRMs costs, and which could be used by other interested bodies, such as governments, when considering relevant aviation policy. These FKFs are related to nine areas, namely PRMs’ transfers; mobility aids; aircraft delays/diversions costs; staff training costs; staff health, safety and welfare; aircraft fixtures and equipment costs; airport costs; transaction costs; and opportunity costs. Further research is needed to obtain the data for these FKFs.
Resumo:
People with foot problems need special healthcare: foot care. Customized insoles can provide this care. They are inserts that are placed in the shoes. They correct biomechanical and postural inaccuracies in foot. Insole production contains four phases: foot image scanning, image validation, insole design and insole manufacturing. Currently, image scanning and validation is separated in location and time, i.e. podiatrists take images and insole designers validate them at different location and at different time. A cloud-based solution, the CloudSME one-stop shop simulation platform, enables remote access to image validation and insole design service deployed and running on the Cloud. The remote access allows podiatrists validating scanned image while the patient is in their offices. The simulation platform also supports remote design of customized insoles.