2 resultados para River Plate area
em WestminsterResearch - UK
Resumo:
Sediment is a major sink for heavy metals in river, and poses significant risks not only to river quality but also to aquatic and benthic organisms. At present in the UK, there are no mandatory sediment quality standards. This is partly due to insufficient toxicity data but also due to problems with identification of appropriate sediment monitoring and analytical techniques. The aim of this research was to examine the sampling different river sediment compartments in order to monitor compliance with any future UK sediment environmental quality standards (EQS). The significance of sediment physical and chemical characteristics on sampling and analysis was also determined. The Ravensbourne River, a tributary of the River Thames located in the highly urbanised South Eastern area of London was used for this study. Sediment was collected from the bed using the Van Veer grab, the bank using hand trowel, and from the water column (suspended sediment) using the time integrated suspended tube sampler between the period of July 2010 and December, 2011. The result for the total metal extraction carried out using aqua regia found that there were no significant differences in the metal concentrations retained in the different compartments by the <63μm sediment fraction but there were differences between the 63μm-2mm fractions of the bed and bank. The metal concentration in the bed, bank and suspended sediment exceeded the draft UK sediment quality guidelines. Sequential extraction was also carried out to determine metal speciation in each sediment compartment using the Maiz et al. (1997) and Tessier et al. (1979) methods. The Maiz et al. (1997) found over 80% of the metals in each sediment compartment were not bioavailable, while Tessier et al. (1979) method found most of the metals to be associated with the Fe/Mn and the residual phase. The bed sediment compartment and the <2mm (<63μm + 63μm-2mm) fraction appears to be the most suitable sediment sample for sediment monitoring from this study.
Resumo:
The article presents the “LungoSolofrana” project, carried out during the course “Urban and Mobility” in the academic year 2009/2010, held during the bachelor in Environmental Engineering at the University of Naples “Federico II”. The work has also been chosen as a finalist at the “UrbanPromo 2010” contest, the urban and territorial marketing event sponsored by the National Institute of Urban Planning and Urbit which was held in Venice in 2010. The project consists in a green mobility proposal, developed with an approach based on the integration of the environmental redevelopment of a portion of river Solofrana, located in the Salerno Province, and of the renewal of seven local stations of the railway line Mercato San Severino – Nocera Inferiore, including the realization of a cycle-path network for the natural environment fruition. Furthermore the work drew attention to the local and regional administration. The main intent of the project is to integrate sustainable mobility themes with the environment recovery in a territory affected by high environmental troubles. The area includes the municipalities of Nocera Inferiore, Nocera Superiore, Mercato San Severino, Castel San Giorgio and Roccapiemonte, situated in Salerno’s province, with a total population about 114.000 (font Demo ISTAT 2010). The area extension is about 84,30 sqkm and it is crossed by river Solofrana that is the central point of the project idea. The intervention strategy is defined in two kinds of actions: internal and external rail station interventions. The external rail station interventions regard the construction of pedestrian-cycle paths with the scope of increasing the spaces dedicated to cyclists and to pedestrians along the river Solofrana sides and to connect the urban areas with the railway station. In this way, it’s also possible to achieve an urban requalification of the interested area. On the other side, the interventions inside the station , according to Transit Oriented Development principles, aim at redeveloping common spaces with the insertion of new activities and at realizing new automatic cycle parks covered by photovoltaic panels. The project proposal consists of the urban regeneration of small railway stations along the route-Nocera-Codola Mercato San Severino in the province of Salerno, through interventions aimed at improving pedestrian accessibility. The project involves in particular the construction of pedestrian paths protected access to the station and connecting with neighboring towns and installation of innovative bike parking stations in elevation, covering surfaces coated with solar panels and spaces information. The project is aimed to propose a new model of sustainable transport for small and medium shifts as an alternative to private transportation