5 resultados para Resource-based theory

em WestminsterResearch - UK


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Marxian thinking following the TSSI (Temporal Single System Interpretation) of Marx is applied to refute the allegation of a tautology in the resource-based view of the firm--paired with providing an explanation of how and why resources create value--, where resources are synonymous with Marx's categories of constant and variable capital. Refuting the allegation naturally leads to the holy grail of resource-based thinking, i.e. the question of what, conceptually, constitutes a firm's competitive advantage within the industry context. The article achieves its objectives by tying the resource-based view into Marx's theory value.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This paper extends original insights of resource-advantage theory (Hunt & Morgan, 1995) to a specific analysis of the moderators of the capabilities-performance relationship such as market orientation, marketing strategy and organizational power. Using established measures and a representative sample of UK firms drawn from Verhoef and Leeflang’s data (2009), our study tests new hypotheses to explain how different types of marketing capabilities contribute to firm performance. The application of resource-advantage theory advances theorising on both marketing and organisational antecedents of firm performance and the causal mechanisms by which competitive advantage is generated.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Existing Workflow Management Systems (WFMSs) follow a pragmatic approach. They often use a proprietary modelling language with an intuitive graphical layout. However the underlying semantics lack a formal foundation. As a consequence, analysis issues, such as proving correctness i.e. soundness and completeness, and reliable execution are not supported at design level. This project will be using an applied ontology approach by formally defining key terms such as process, sub-process, action/task based on formal temporal theory. Current business process modelling (BPM) standards such as Business Process Modelling Notation (BPMN) and Unified Modelling Language (UML) Activity Diagram (AD) model their constructs with no logical basis. This investigation will contribute to the research and industry by providing a framework that will provide grounding for BPM to reason and represent a correct business process (BP). This is missing in the current BPM domain, and may result in reduction of the design costs and avert the burden of redundant terms used by the current standards. A graphical tool will be introduced which will implement the formal ontology defined in the framework. This new tool can be used both as a modelling tool and at the same time will serve the purpose of validating the model. This research will also fill the existing gap by providing a unified graphical representation to represent a BP in a logically consistent manner for the mainstream modelling standards in the fields of business and IT. A case study will be conducted to analyse a catalogue of existing ‘patient pathways’ i.e. processes, of King’s College Hospital NHS Trust including current performance statistics. Following the application of the framework, a mapping will be conducted, and new performance statistics will be collected. A cost/benefits analysis report will be produced comparing the results of the two approaches.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Existing Workflow Management Systems (WFMSs) follow a pragmatic approach. They often use a proprietary modelling language with an intuitive graphical layout. However the underlying semantics lack a formal foundation. As a consequence, analysis issues, such as proving correctness i.e. soundness and completeness, and reliable execution are not supported at design level. This project will be using an applied ontology approach by formally defining key terms such as process, sub-process, action/task based on formal temporal theory. Current business process modelling (BPM) standards such as Business Process Modelling Notation (BPMN) and Unified Modelling Language (UML) Activity Diagram (AD) model their constructs with no logical basis. This investigation will contribute to the research and industry by providing a framework that will provide grounding for BPM to reason and represent a correct business process (BP). This is missing in the current BPM domain, and may result in reduction of the design costs and avert the burden of redundant terms used by the current standards. A graphical tool will be introduced which will implement the formal ontology defined in the framework. This new tool can be used both as a modelling tool and at the same time will serve the purpose of validating the model. This research will also fill the existing gap by providing a unified graphical representation to represent a BP in a logically consistent manner for the mainstream modelling standards in the fields of business and IT. A case study will be conducted to analyse a catalogue of existing ‘patient pathways’ i.e. processes, of King’s College Hospital NHS Trust including current performance statistics. Following the application of the framework, a mapping will be conducted, and new performance statistics will be collected. A cost/benefits analysis report will be produced comparing the results of the two approaches.