11 resultados para Hospital waste

em WestminsterResearch - UK


Relevância:

20.00% 20.00%

Publicador:

Resumo:

London has traditionally exported most of its waste to former mineral workings in surrounding counties for landfill. Many of these sites are being filled and opportunities for new sites are limited. Virtually all waste reprocessing and recycling facilities, with the exception of textile sorting and some facilities for glass and organic waste composting, are outside London. The Mayor of London's Vision for Waste in London is that by 2020, municipal waste should not compromise London’s future as a sustainable city. This will involve managing waste better, so that its impact on the local and global environment and on London communities, economy and health is minimised. The majority of waste and recyclable materials in London are currently collected and transported for recovery, disposal or reprocessing by road in large vehicles. Environmental costs include, adding to congestion, noise, energy usage, air pollution, and accidents. The Mayor is keen to increase recycling and reuse of waste materials in London, and to ensure that as more of London's waste is diverted away from landfill sites to recycling facilities. Several projects and initiatives have been established and these are reviewed in the paper.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper examines the Producer Responsibility Obligations (Packaging Waste) Regulations introduced by the UK Government in 1997. The impact that these Regulations will have on the levels of freight transport activity associated with the collection and redistribution of packaging waste to recovery/recycling facilities is calculated. Findings indicate that the Regulations will lead to a 14% increase in freight vehicle kilometres attributable to packaging waste. The extent to which greater use of reusable containers could help to reduce packaging waste-related transport activity is also modelled. Details arc given of how businesses are responding to the Regulations and how some companies are adapting their logistics systems to incorporate the recovery and recycling of packaging waste as well as replacing disposal packaging with reusable containers. Interviews and case-study material carried out as part of the research are used to support this discussion.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The objective of this study was to develop, test and benchmark a framework and a predictive risk model for hospital emergency readmission within 12 months. We performed the development using routinely collected Hospital Episode Statistics data covering inpatient hospital admissions in England. Three different timeframes were used for training, testing and benchmarking: 1999 to 2004, 2000 to 2005 and 2004 to 2009 financial years. Each timeframe includes 20% of all inpatients admitted within the trigger year. The comparisons were made using positive predictive value, sensitivity and specificity for different risk cut-offs, risk bands and top risk segments, together with the receiver operating characteristic curve. The constructed Bayes Point Machine using this feature selection framework produces a risk probability for each admitted patient, and it was validated for different timeframes, sub-populations and cut-off points. At risk cut-off of 50%, the positive predictive value was 69.3% to 73.7%, the specificity was 88.0% to 88.9% and sensitivity was 44.5% to 46.3% across different timeframes. Also, the area under the receiver operating characteristic curve was 73.0% to 74.3%. The developed framework and model performed considerably better than existing modelling approaches with high precision and moderate sensitivity.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Existing Workflow Management Systems (WFMSs) follow a pragmatic approach. They often use a proprietary modelling language with an intuitive graphical layout. However the underlying semantics lack a formal foundation. As a consequence, analysis issues, such as proving correctness i.e. soundness and completeness, and reliable execution are not supported at design level. This project will be using an applied ontology approach by formally defining key terms such as process, sub-process, action/task based on formal temporal theory. Current business process modelling (BPM) standards such as Business Process Modelling Notation (BPMN) and Unified Modelling Language (UML) Activity Diagram (AD) model their constructs with no logical basis. This investigation will contribute to the research and industry by providing a framework that will provide grounding for BPM to reason and represent a correct business process (BP). This is missing in the current BPM domain, and may result in reduction of the design costs and avert the burden of redundant terms used by the current standards. A graphical tool will be introduced which will implement the formal ontology defined in the framework. This new tool can be used both as a modelling tool and at the same time will serve the purpose of validating the model. This research will also fill the existing gap by providing a unified graphical representation to represent a BP in a logically consistent manner for the mainstream modelling standards in the fields of business and IT. A case study will be conducted to analyse a catalogue of existing ‘patient pathways’ i.e. processes, of King’s College Hospital NHS Trust including current performance statistics. Following the application of the framework, a mapping will be conducted, and new performance statistics will be collected. A cost/benefits analysis report will be produced comparing the results of the two approaches.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Existing Workflow Management Systems (WFMSs) follow a pragmatic approach. They often use a proprietary modelling language with an intuitive graphical layout. However the underlying semantics lack a formal foundation. As a consequence, analysis issues, such as proving correctness i.e. soundness and completeness, and reliable execution are not supported at design level. This project will be using an applied ontology approach by formally defining key terms such as process, sub-process, action/task based on formal temporal theory. Current business process modelling (BPM) standards such as Business Process Modelling Notation (BPMN) and Unified Modelling Language (UML) Activity Diagram (AD) model their constructs with no logical basis. This investigation will contribute to the research and industry by providing a framework that will provide grounding for BPM to reason and represent a correct business process (BP). This is missing in the current BPM domain, and may result in reduction of the design costs and avert the burden of redundant terms used by the current standards. A graphical tool will be introduced which will implement the formal ontology defined in the framework. This new tool can be used both as a modelling tool and at the same time will serve the purpose of validating the model. This research will also fill the existing gap by providing a unified graphical representation to represent a BP in a logically consistent manner for the mainstream modelling standards in the fields of business and IT. A case study will be conducted to analyse a catalogue of existing ‘patient pathways’ i.e. processes, of King’s College Hospital NHS Trust including current performance statistics. Following the application of the framework, a mapping will be conducted, and new performance statistics will be collected. A cost/benefits analysis report will be produced comparing the results of the two approaches.