4 resultados para Formal Charge.

em WestminsterResearch - UK


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper assesses whether two sustainability policies currently in effect in London, a congestion charge zone and a low emission zone, have affected freight operations and reduced vehicle kilometers travelled. It investigates responses by freight operators, including re-timing, re-routing, or reducing the number of trips, or replacing vehicles. Freight traffic trends from 1994 to 2012 were identified using road traffic estimates, cordon counts, and vehicle speed data and supplemented by interviews with freight industry experts and operators. Findings indicate that freight traffic increased throughout London during this timeframe, but declined in the central boroughs partly within the congestion charge zone. The congestion charge may have time-shifted some light goods trips, but most freight trips face a variety of constraints on operators’ delivery window. No evidence was found of re-routing of freight traffic or avoidance traffic around the charged zone. The low emission zone spurred higher levels of operational change than the congestion charge zone, and it was effective at spurring freight vehicle replacement. The paper also discusses freight operators’ perceptions of these policies and how they could be improved.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Managerial discretion is the focal theme bridging the clash between two schools of thoughts; whether executives have greater influence on their firms’ outcomes or other factors restrain their actions (Hambrick & Finkelstein, 1987). It is argued that constraints come from inertial, normative and environmental forces (e.g. DiMaggio & Powell, 1983). Of these restraints is the institutional environment in which a firm is headquartered. Our paper falls within this research stream and provides an extension for Crossland and Hambrick (2007, 2011) work. We investigate the national level of discretion in new cross-cultural contexts, provide deeper understanding of its concept, and shed the light on undiscovered discretion’s antecedents and consequences. We adopt a quantitative approach in which questionnaires represent our data collection instrument. We anticipate that in high discretion countries firms tend to follow what Miles & Snow (1978) labeled ‘Prospector’ strategy as opposed to low discretion countries in which firms incline to implement a ‘Defender’ strategy.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Existing Workflow Management Systems (WFMSs) follow a pragmatic approach. They often use a proprietary modelling language with an intuitive graphical layout. However the underlying semantics lack a formal foundation. As a consequence, analysis issues, such as proving correctness i.e. soundness and completeness, and reliable execution are not supported at design level. This project will be using an applied ontology approach by formally defining key terms such as process, sub-process, action/task based on formal temporal theory. Current business process modelling (BPM) standards such as Business Process Modelling Notation (BPMN) and Unified Modelling Language (UML) Activity Diagram (AD) model their constructs with no logical basis. This investigation will contribute to the research and industry by providing a framework that will provide grounding for BPM to reason and represent a correct business process (BP). This is missing in the current BPM domain, and may result in reduction of the design costs and avert the burden of redundant terms used by the current standards. A graphical tool will be introduced which will implement the formal ontology defined in the framework. This new tool can be used both as a modelling tool and at the same time will serve the purpose of validating the model. This research will also fill the existing gap by providing a unified graphical representation to represent a BP in a logically consistent manner for the mainstream modelling standards in the fields of business and IT. A case study will be conducted to analyse a catalogue of existing ‘patient pathways’ i.e. processes, of King’s College Hospital NHS Trust including current performance statistics. Following the application of the framework, a mapping will be conducted, and new performance statistics will be collected. A cost/benefits analysis report will be produced comparing the results of the two approaches.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Existing Workflow Management Systems (WFMSs) follow a pragmatic approach. They often use a proprietary modelling language with an intuitive graphical layout. However the underlying semantics lack a formal foundation. As a consequence, analysis issues, such as proving correctness i.e. soundness and completeness, and reliable execution are not supported at design level. This project will be using an applied ontology approach by formally defining key terms such as process, sub-process, action/task based on formal temporal theory. Current business process modelling (BPM) standards such as Business Process Modelling Notation (BPMN) and Unified Modelling Language (UML) Activity Diagram (AD) model their constructs with no logical basis. This investigation will contribute to the research and industry by providing a framework that will provide grounding for BPM to reason and represent a correct business process (BP). This is missing in the current BPM domain, and may result in reduction of the design costs and avert the burden of redundant terms used by the current standards. A graphical tool will be introduced which will implement the formal ontology defined in the framework. This new tool can be used both as a modelling tool and at the same time will serve the purpose of validating the model. This research will also fill the existing gap by providing a unified graphical representation to represent a BP in a logically consistent manner for the mainstream modelling standards in the fields of business and IT. A case study will be conducted to analyse a catalogue of existing ‘patient pathways’ i.e. processes, of King’s College Hospital NHS Trust including current performance statistics. Following the application of the framework, a mapping will be conducted, and new performance statistics will be collected. A cost/benefits analysis report will be produced comparing the results of the two approaches.