5 resultados para Distribution management systems

em WestminsterResearch - UK


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper takes a sociotechnical viewpoint of knowledge management system (KMS) implementation in organizations considering issues such as stakeholder disenfranchisement, lack of communication, and the low involvement of key personnel in system design asking whether KMS designers could learn from applying sociotechnical principles to their systems. The paper discusses design elements drawn from the sociotechnical principles essential for the success of IS and makes recommendations to increase the success of KMS in organizations. It also provides guidelines derived from Clegg’s Principles (2000) for KMS designers to enhance their designs. Our data comes from the application of a plurality of analysis methods on a large comprehensive global survey conducted from 2007 to 2011 of 1034 participants from 76 countries. The survey covers a variety of organizations of all types and sizes from a comprehensive selection of economic sectors and industries. Our results showed that users were not satisfied with the information and knowledge systems that they were being offered. In addition to multiple technology and usability issues, there were human and organisational barriers that prevented the systems from being used to their full potential. We recommend that users of KMS are integrated into the design team so that these usability and other barriers can be addressed during the feasibility stage as well as the actual design and implementation phases.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The product lifecycle management (PLM) system has a significant role to support the collaboration and manage the partnership between OEM and supplier to enable the success of supplier integration. Today great rates of cooperation as suppliers have been dedicated to SMEs. Since one of the PLM task is to control the collaboration between OEM and suppliers, this paper provide supplier (SMEs) a framework to find their level of relationship with OEM and the steps that they can improve it. To respond to this trend, we defined a methodology based on collaborative matrix maturity levels and four PLM axes of strategic, organization, process and tools levels. Finally, according to this matrix, we proposed a structure of a proper questionnaire and example that shows suppliers how to evaluate their positions in terms of collaboration in PLM.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This paper explains how the organizational learning concept is used by managers in a global Korean company to promote group work, information sharing and an open communication style in order to produce a high level of customer service. Previously collected data from a set of in-depth personal interviews undertaken with three senior managers in a Korean electronics company were analyzed and interpreted using the grounded theory approach, and a number of propositions are put forward. The research findings show that managers in a chaebol deploy organizational learning to identify skilled and knowledgeable staff, and improve the organization’s capability by placing emphasis on developing harmonious, mutually oriented relationships that permeate throughout the organization. Top management demand that staff identify with government economic objectives and align the organization’s strategy accordingly so that the products produced are marketable. To achieve this, the organization fosters continual interaction among managers throughout the organization’s hierarchy. The chaebol’s organizational learning model encapsulates a “corollary” (continual communication) and “tools” (cultural influence and relationship management), and manifests in a unique strategy that allows management systems to evolve naturally.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Existing Workflow Management Systems (WFMSs) follow a pragmatic approach. They often use a proprietary modelling language with an intuitive graphical layout. However the underlying semantics lack a formal foundation. As a consequence, analysis issues, such as proving correctness i.e. soundness and completeness, and reliable execution are not supported at design level. This project will be using an applied ontology approach by formally defining key terms such as process, sub-process, action/task based on formal temporal theory. Current business process modelling (BPM) standards such as Business Process Modelling Notation (BPMN) and Unified Modelling Language (UML) Activity Diagram (AD) model their constructs with no logical basis. This investigation will contribute to the research and industry by providing a framework that will provide grounding for BPM to reason and represent a correct business process (BP). This is missing in the current BPM domain, and may result in reduction of the design costs and avert the burden of redundant terms used by the current standards. A graphical tool will be introduced which will implement the formal ontology defined in the framework. This new tool can be used both as a modelling tool and at the same time will serve the purpose of validating the model. This research will also fill the existing gap by providing a unified graphical representation to represent a BP in a logically consistent manner for the mainstream modelling standards in the fields of business and IT. A case study will be conducted to analyse a catalogue of existing ‘patient pathways’ i.e. processes, of King’s College Hospital NHS Trust including current performance statistics. Following the application of the framework, a mapping will be conducted, and new performance statistics will be collected. A cost/benefits analysis report will be produced comparing the results of the two approaches.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Existing Workflow Management Systems (WFMSs) follow a pragmatic approach. They often use a proprietary modelling language with an intuitive graphical layout. However the underlying semantics lack a formal foundation. As a consequence, analysis issues, such as proving correctness i.e. soundness and completeness, and reliable execution are not supported at design level. This project will be using an applied ontology approach by formally defining key terms such as process, sub-process, action/task based on formal temporal theory. Current business process modelling (BPM) standards such as Business Process Modelling Notation (BPMN) and Unified Modelling Language (UML) Activity Diagram (AD) model their constructs with no logical basis. This investigation will contribute to the research and industry by providing a framework that will provide grounding for BPM to reason and represent a correct business process (BP). This is missing in the current BPM domain, and may result in reduction of the design costs and avert the burden of redundant terms used by the current standards. A graphical tool will be introduced which will implement the formal ontology defined in the framework. This new tool can be used both as a modelling tool and at the same time will serve the purpose of validating the model. This research will also fill the existing gap by providing a unified graphical representation to represent a BP in a logically consistent manner for the mainstream modelling standards in the fields of business and IT. A case study will be conducted to analyse a catalogue of existing ‘patient pathways’ i.e. processes, of King’s College Hospital NHS Trust including current performance statistics. Following the application of the framework, a mapping will be conducted, and new performance statistics will be collected. A cost/benefits analysis report will be produced comparing the results of the two approaches.