4 resultados para Construction industry Costs

em WestminsterResearch - UK


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper explores responses to the exposure of blacklisting in the UK construction industry in the period following the closure of the Consulting Association (CA) in 2009. It asks whether employer collusion to blacklist in this way has been terminated and concludes that it is now largely of historical interest although other forms of anti-union activity continue. It highlights particularly the historic and continuing importance of ‘double breasting’ and reports on divergent employer paths in the aftermath of the exposure and subsequent closure of the activities of the CA.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The UK construction industry is notorious for the sheer amount of disputes which are likely to arise on each building and engineering project. Despite numerous creative attempts at “dispute avoidance” and “dispute resolution”, this industry is still plagued with these costly disputes. Whilst both academic literature and professional practices have investigated the causes of disputes and the mechanisms for avoidance/resolution of these disputes, neither has studied in any detail the nature of the construction disputes and why they develop as they do once a construction lawyer is engaged. Accordingly, this research explores the question of what influences the outcome of a construction dispute and to what extent do construction lawyers control or direct this outcome? The research approach was ethnographic. Fieldwork took place at a leading construction law firm in London over 18 months. The primary focus was participant observation in all of the firm’s activities. In addition, a database was compiled from the firm’s files and archives, thus providing information for quantitative analysis. The basis of the theoretical framework, and indeed the research method, was the Actor‐Network Theory (ANT). As such, this research viewed a dispute as a set of associations – an entity which takes form and acquires its attributes as a result of its relations with other entities. This viewpoint is aligned with relational contract theories, which in turn provides a unified platform for exploring the disputes. The research investigated the entities and events which appeared to influence the dispute’s identity, shape and outcome. With regard to a dispute’s trajectory, the research took as its starting point that a dispute follows the transformation of “naming, blaming, claiming…”, as identified by Felstiner, Abel and Sarat in 1980. The research found that construction disputes generally materialise and develop prior to any one of the parties approaching a lawyer. Once the lawyer is engaged, we see the reverse of the trajectory “naming, blaming, claiming…” this being: “claiming, blaming, naming…” The lawyers’ role is to identify or name (or rename) the dispute in the best possible light for their client in order to achieve the desired outcome – the development of which is akin to the design process. The transformation of a dispute and the reverse trajectory is by no means linear, but rather, iterative and spatial as it requires alliances, dependencies and contingencies to assemble and take the shape it does. The research concludes that construction disputes are rarely ever completely “resolved” as such. Whilst an independent third party may hand down a judgment, or the parties may reach a settlement agreement, this state is only temporal. Some construction disputes dissipate whist others reach a state of hibernation for a period of time only to pick up momentum and energy some years later. Accordingly, this research suggests that the concept of “dispute resolution” does not exist in the UK construction industry. The ultimate goal should be for parties to reach this ultimate and perpetual state of equilibrium as quickly and as cost effectively as possible: “dispute dissolution”, the slowing down of the dispute’s momentum. Rather than focusing on the design and assemblage of the dispute, the lawyers’ role therein is, or should be, to assist with the “disassembling” of the dispute.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The construction industry wants graduate employees skilled in relationship building and information technology and communications (ITC). Much of the relationship building at universities has evolved through technology. Government and the ITC industry fund lobby groups to influence both educational establishments and Government to incorporate more ITC in education _ and ultimately into the construction industry. This influencing ignores the technoskeptics’ concerns about student disengagement through excessive online distractions. Construction studies students (n=64) and lecturers (n=16) at a construction university were surveyed to discover the impact of the use and applications of ITC. Contrary to Government and industry technopositivism, construction students and lecturers preferred hard copy documents to online feedback for assignments and marking, more human interface and less technological substitution and to be on campus for lectures and face-to-face meetings rather than viewing on-screen. ITC also distracted users from tasks which, in the case of students, prevented the development of the concentration and deep thinking which a university education should deliver. The research findings are contrary to the promotions of Government, ITC industry and ITC departments and have implications for construction employers where a renewed focus on human communication should mean less stress, fewer delays and cost overruns.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The construction industry is responsible for 40% of European Union (EU) end-use emissions but addressing this is problematic, as evident from the performance gap between design intention and on-site energy performance. There is a lack of the expertise needed for low energy construction (LEC) in the UK as the complex work processes involved require ‘energy literacy’ of all construction occupations, high qualification levels, broad occupational profiles, integrated teamworking, and good communication . This research identifies the obstacles to meeting these requirements, the nature of the expertise needed to break down occupational divisions and bridge those interfaces where the main heat losses occur, and the transition pathway implied. Obstacles include a decline in the level, breadth and quality of construction vocational education and training (VET), the lack of a learning infrastructure on sites, and a fragmented employment structure. To overcome these and develop enhanced understanding of LEC requires a transformation of the existing structure of VET provision and construction employment and a new curriculum based on a broader concept of agency and backed by rigorous enforcement of standards. This can be achieved through a radical transition pathway rather than market-based solutions to a low carbon future for the construction sector.