2 resultados para 290804 Construction Engineering

em WestminsterResearch - UK


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Environmental engineering is a core component of most construction and surveying undergraduate courses. It is generally accepted that students on these courses should have an understanding of thermal comfort, heat transfer, condensation, lighting, noise transmission and acoustics. Experiments are essential in developing students’ awareness and understanding of the underlying physical concepts which drive environmental engineering solutions. Traditionally these experiments have been conducted by students working in small groups in laboratories. However, increasing student numbers and, in particular, the growth in part time study, have placed significant additional demands on limited laboratory resources. The availability of reasonably priced, simple, hand-held equipment has made it possible for students to conduct experiments outside the confines of the laboratory. Furthermore, various professional software packages (some of which are freely available online) enable the resultant data to be further developed and analysed in conjunction with the conventional textbook approach. This paper examines these alternative approaches to the traditional laboratory experiment. An assessment is provided of the types of experiment which are both possible and appropriate, and the efficacy of these approaches is considered.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The UK construction industry is notorious for the sheer amount of disputes which are likely to arise on each building and engineering project. Despite numerous creative attempts at “dispute avoidance” and “dispute resolution”, this industry is still plagued with these costly disputes. Whilst both academic literature and professional practices have investigated the causes of disputes and the mechanisms for avoidance/resolution of these disputes, neither has studied in any detail the nature of the construction disputes and why they develop as they do once a construction lawyer is engaged. Accordingly, this research explores the question of what influences the outcome of a construction dispute and to what extent do construction lawyers control or direct this outcome? The research approach was ethnographic. Fieldwork took place at a leading construction law firm in London over 18 months. The primary focus was participant observation in all of the firm’s activities. In addition, a database was compiled from the firm’s files and archives, thus providing information for quantitative analysis. The basis of the theoretical framework, and indeed the research method, was the Actor‐Network Theory (ANT). As such, this research viewed a dispute as a set of associations – an entity which takes form and acquires its attributes as a result of its relations with other entities. This viewpoint is aligned with relational contract theories, which in turn provides a unified platform for exploring the disputes. The research investigated the entities and events which appeared to influence the dispute’s identity, shape and outcome. With regard to a dispute’s trajectory, the research took as its starting point that a dispute follows the transformation of “naming, blaming, claiming…”, as identified by Felstiner, Abel and Sarat in 1980. The research found that construction disputes generally materialise and develop prior to any one of the parties approaching a lawyer. Once the lawyer is engaged, we see the reverse of the trajectory “naming, blaming, claiming…” this being: “claiming, blaming, naming…” The lawyers’ role is to identify or name (or rename) the dispute in the best possible light for their client in order to achieve the desired outcome – the development of which is akin to the design process. The transformation of a dispute and the reverse trajectory is by no means linear, but rather, iterative and spatial as it requires alliances, dependencies and contingencies to assemble and take the shape it does. The research concludes that construction disputes are rarely ever completely “resolved” as such. Whilst an independent third party may hand down a judgment, or the parties may reach a settlement agreement, this state is only temporal. Some construction disputes dissipate whist others reach a state of hibernation for a period of time only to pick up momentum and energy some years later. Accordingly, this research suggests that the concept of “dispute resolution” does not exist in the UK construction industry. The ultimate goal should be for parties to reach this ultimate and perpetual state of equilibrium as quickly and as cost effectively as possible: “dispute dissolution”, the slowing down of the dispute’s momentum. Rather than focusing on the design and assemblage of the dispute, the lawyers’ role therein is, or should be, to assist with the “disassembling” of the dispute.