5 resultados para successful building projects

em Universidad de Alicante


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The literature states that project duration is affected by various scope factors. Using 168 building projects carried out in Spain, this paper uses the multiple regression analysis to develop a forecast model that allows estimating project duration of new builds. The proposed model uses project type, gross floor area (GFA), the cost/GFA relationship and number of floors as predictor variables. The research identified the logarithmic form of construction speed as the most appropriate response variable. GFA has greater influence than cost on project duration but both factors are necessary to achieve a forecast model with the highest accuracy. We developed an analysis to verify the stability of forecasted values and showed how a model with high values of fit and accuracy may display an anomalous behavior in the forecasted values. The sensitivity of the proposed forecast model was also analyzed versus the variability of construction costs.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Evacuation route planning is a fundamental task for building engineering projects. Safety regulations are established so that all occupants are driven on time out of a building to a secure place when faced with an emergency situation. As an example, Spanish building code requires the planning of evacuation routes on large and, usually, public buildings. Engineers often plan these routes on single building projects, repeatedly assigning clusters of rooms to each emergency exit in a trial-and-error process. But problems may arise for a building complex where distribution and use changes make visual analysis cumbersome and sometimes unfeasible. This problem could be solved by using well-known spatial analysis techniques, implemented as a specialized software able to partially emulate engineer reasoning. In this paper we propose and test an easily reproducible methodology that makes use of free and open source software components for solving a case study. We ran a complete test on a building floor at the University of Alicante (Spain). This institution offers a web service (WFS) that allows retrieval of 2D geometries from any building within its campus. We demonstrate how geospatial technologies and computational geometry algorithms can be used for automating the creation and optimization of evacuation routes. In our case study, the engineers’ task is to verify that the load capacity of each emergency exit does not exceed the standards specified by Spain’s current regulations. Using Dijkstra’s algorithm, we obtain the shortest paths from every room to the most appropriate emergency exit. Once these paths are calculated, engineers can run simulations and validate, based on path statistics, different cluster configurations. Techniques and tools applied in this research would be helpful in the design and risk management phases of any complex building project.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The development of synthetic routes for the tailoring of efficient silica-based heterogeneous catalysts functionalized with coordination complexes or metallic nanoparticles has become a important goal in chemistry. Most of these techniques have been based on postsynthetic treatments of preformed silicas. Nevertheless, there is an emerging approach, so-called sol–gel coordination chemistry, based on co-condensation during the sol–gel preparation of the hybrid material of the corresponding complex or nanoparticle modified with terminal trialkoxysilane groups with a silica source (such as tetraethoxysilane) and in the presence of an adequate surfactant. This method leads to the production of new mesoporous metal complex-silica materials, with the metallic functionality incorporated homogeneously into the structure of the hybrid material, improving the stability of the coordination complex (which is protected by the silica network) and reducing the leaching of the active phase. This technique also offers the actual possibility of functionalizing silica or other metal oxides for a wider range of applications, such as photonics, sensing, and biochemical functions.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The bromonium-promoted cyclization of conjugated aminodienes is described. The reaction proceeds smoothly in the presence of N-bromosuccinimide as halonium promoter, and using N-tosyl-protected aminodienes as substrates, to give the corresponding halocyclization products in high yields and with high diastereoselectivities. It can be envisaged that the formation of these products is the result of an SN2′-type ring-opening of a terminal bromonium intermediate in a 5-exo-trig or 6-exo-trig cyclization mode. The presence of an allyl bromide moiety in the haloamination products makes these molecules highly attractive from a synthetic point of view, as it opens the way for further transformations. Thus, allylic substitution reactions with different nucleophiles (acetate, azide, cyanide, and malonate), palladium-catalysed Suzuki coupling, and silver-mediated bromine displacement reactions were carried out successfully.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

It has been widely documented that when Building Information Modelling (BIM) is used, there is a shift in effort to the design phase. Little investigation into the impact of this shift in effort has been done and how it impacts on costs. It can be difficult to justify the increased expenditure on BIM in a market that is heavily driven by costs. There are currently studies attempting to quantify the return on investment (ROI) for BIM for which these returns can be seen to balance out the shift in efforts and costs to the design phase. The studies however quantify the ROI based on the individual stakeholder’s investment without consideration for the impact that the use of BIM from their project partners may have on their own profitability. In this study, a questionnaire investigated opinions and experience of construction professionals, representing clients, consultants, designers and contractors, to determine fluctuations in costs by their magnitude and when they occur. These factors were examined more closely by interviewing senior members representing each of the stakeholder categories and comparing their experience in using BIM within environments where their project partners were also using BIM and when they were not. This determined the differences in how the use and the investment in BIM impacts on others and how costs are redistributed. This redistribution is not just through time but also between stakeholders and categories of costs. Some of these cost fluctuations and how the cost of BIM is currently financed are also highlighted in several case studies. The results show that the current distribution of costs set for traditional 2D delivery is hindering the potential success of BIM. There is also evidence that stakeholders who don’t use BIM may benefit financially from the BIM use of others and that collaborative BIM is significantly different to the use of ‘lonely’ BIM in terms of benefits and profitability.