2 resultados para preventive maintenance
em Universidad de Alicante
Resumo:
In this paper the model of an Innovative Monitoring Network involving properly connected nodes to develop an Information and Communication Technology (ICT) solution for preventive maintenance of historical centres from early warnings is proposed. It is well known that the protection of historical centres generally goes from a large-scale monitoring to a local one and it could be supported by a unique ICT solution. More in detail, the models of a virtually organized monitoring system could enable the implementation of automated analyses by presenting various alert levels. An adequate ICT solution tool would allow to define a monitoring network for a shared processing of data and results. Thus, a possible retrofit solution could be planned for pilot cases shared among the nodes of the network on the basis of a suitable procedure utilizing a retrofit catalogue. The final objective would consist in providing a model of an innovative tool to identify hazards, damages and possible retrofit solutions for historical centres, assuring an easy early warning support for stakeholders. The action could proactively target the needs and requirements of users, such as decision makers responsible for damage mitigation and safeguarding of cultural heritage assets.
Resumo:
There are many models in the literature that have been proposed in the last decades aimed at assessing the reliability, availability and maintainability (RAM) of safety equipment, many of them with a focus on their use to assess the risk level of a technological system or to search for appropriate design and/or surveillance and maintenance policies in order to assure that an optimum level of RAM of safety systems is kept during all the plant operational life. This paper proposes a new approach for RAM modelling that accounts for equipment ageing and maintenance and testing effectiveness of equipment consisting of multiple items in an integrated manner. This model is then used to perform the simultaneous optimization of testing and maintenance for ageing equipment consisting of multiple items. An example of application is provided, which considers a simplified High Pressure Injection System (HPIS) of a typical Power Water Reactor (PWR). Basically, this system consists of motor driven pumps (MDP) and motor operated valves (MOV), where both types of components consists of two items each. These components present different failure and cause modes and behaviours, and they also undertake complex test and maintenance activities depending on the item involved. The results of the example of application demonstrate that the optimization algorithm provide the best solutions when the optimization problem is formulated and solved considering full flexibility in the implementation of testing and maintenance activities taking part of such an integrated RAM model.