6 resultados para participatory projects
em Universidad de Alicante
Resumo:
Presentation to the Disability Studies Conference, Lancaster University, September 7-9, 2010.
Resumo:
This study provides support to the characteristics of participatory and anticipatory stages in secondary school pupils’ abstraction of mathematical conceptions. We carried out clinical task-based interviews with 71 secondary-school pupils to obtain evidence of the different constructed mathematical conceptions (Participatory Stage) and how they were used (Anticipatory Stage). We distinguish two moments in the Participatory Stage based on the coordination of information from particular cases by activity-effect reflection which, in some cases, lead to a change of focus enabling secondary-school pupils to achieve a reorganization of their knowledge. We argue that (a) the capacity of perceiving regularities in sets of particular cases is a characteristic of activity-effect reflection in the abstraction of mathematical conceptions in secondary school, and (b) the coordination of information by pupils provides opportunities for changing the attention-focus from the particular results to the structure of properties.
Resumo:
The literature states that project duration is affected by various scope factors. Using 168 building projects carried out in Spain, this paper uses the multiple regression analysis to develop a forecast model that allows estimating project duration of new builds. The proposed model uses project type, gross floor area (GFA), the cost/GFA relationship and number of floors as predictor variables. The research identified the logarithmic form of construction speed as the most appropriate response variable. GFA has greater influence than cost on project duration but both factors are necessary to achieve a forecast model with the highest accuracy. We developed an analysis to verify the stability of forecasted values and showed how a model with high values of fit and accuracy may display an anomalous behavior in the forecasted values. The sensitivity of the proposed forecast model was also analyzed versus the variability of construction costs.
Resumo:
This paper presents the results of an ex-post assessment of two important dams in Brazil. The study follows the principles of Social Impact Management, which offer a suitable framework for analyzing the complex social transformations triggered by hydroelectric dams. In the implementation of this approach, participative causal maps were used to identify the ex-post social impacts of the Porto Primavera and Rosana dams on the community of Porto Rico, located along the High Paraná River. We found that in the operation of dams there are intermediate causes of a political nature, stemming from decisions based on values and interests not determined by neutral, exclusively technical reasons; and this insight opens up an area of action for managing the negative impacts of dams.
Resumo:
The implantation of new university degrees within the European Higher Education Area implies the need of innovative methodologies in teaching and learning to improve the skills and competencies of students and to answer the growing needs that society continuously demands to heritage management experts. The present work shows an application of the teaching methodology proposed during the international workshop entitled “I International Planning Preservation Workshop. Learning from Al Andalus”, which included the participation of the University of Alicante and Granada, Università Politecnico di Milano and Hunter College City University of New York; where we tried to dissolve traditional boundaries derived of interuniversity cooperation programs. The main objective of the workshop was to discuss and debate the role of urban Historical Centers within the Global Heritage by the integrated work through multidisciplinary teams and the creation of a permanent international working group between these universities to both teach and research. The methodology of this workshop was very participatory and considered the idea of a new learning process generated by "a journey experience." A trip from global to local (from the big city to the small village) but also a trip from the local (historical) part of a big city to the global dimension of contemporary historical villages identified by the students through a system of exhibition panels in affinity groups, specific projects proposed by lecturers and teachers or the generation of publications in various areas (texts, photographs, videos, etc.). So, the participation of the students in this multidisciplinary meeting has enhanced their capacity for self-criticism in several disciplines and has promoted their ability to perform learning and research strategies in an autonomous way. As a result, it has been established a permanent international work structure for the development of projects of the Historical City. This relationship has generated the publication of several books whose contents have reflected the conclusions developed in the workshop and several teaching proposals shared between those institutions. All these aspects have generated a new way of understanding the teaching process through a journey, in order to study the representative role of university in the historical heritage and to make students (from planning, heritage management, architecture, geography, sociology, history or engineering areas) be compromised on searching strategies for sustainable development in the Contemporary City.
Resumo:
It has been widely documented that when Building Information Modelling (BIM) is used, there is a shift in effort to the design phase. Little investigation into the impact of this shift in effort has been done and how it impacts on costs. It can be difficult to justify the increased expenditure on BIM in a market that is heavily driven by costs. There are currently studies attempting to quantify the return on investment (ROI) for BIM for which these returns can be seen to balance out the shift in efforts and costs to the design phase. The studies however quantify the ROI based on the individual stakeholder’s investment without consideration for the impact that the use of BIM from their project partners may have on their own profitability. In this study, a questionnaire investigated opinions and experience of construction professionals, representing clients, consultants, designers and contractors, to determine fluctuations in costs by their magnitude and when they occur. These factors were examined more closely by interviewing senior members representing each of the stakeholder categories and comparing their experience in using BIM within environments where their project partners were also using BIM and when they were not. This determined the differences in how the use and the investment in BIM impacts on others and how costs are redistributed. This redistribution is not just through time but also between stakeholders and categories of costs. Some of these cost fluctuations and how the cost of BIM is currently financed are also highlighted in several case studies. The results show that the current distribution of costs set for traditional 2D delivery is hindering the potential success of BIM. There is also evidence that stakeholders who don’t use BIM may benefit financially from the BIM use of others and that collaborative BIM is significantly different to the use of ‘lonely’ BIM in terms of benefits and profitability.