23 resultados para design technology

em Universidad de Alicante


Relevância:

70.00% 70.00%

Publicador:

Resumo:

In this paper we explore the implications of pluralist curricula for architectural technology. This includes the potential effects on strengthening the identity of the architectural technology profession and the academic development of the discipline. This latter relies, arguably, on research being explicit in CIAT’s eight mandatory threshold standards. This work concentrates on one of the Chartered Institute of Architectural Technologist’s (CIATS’s) key subjects; 'design', defined as detail design for the architectural technologist. In postulating a philosophy of architectural technology epistemology with a focus on detail design, the pedagogy of architectural detailing in practice and academia is investigated: the associated roles of creativity and conditioning are explored. The interrelationship between conceptual design and construction processes in practice is outlined, identifying the role of the detail design specialist (architectural technologist) in the management of design and production information. Thus is identified the future architectural technologists’ specialisation of nuclear architecture: the total quality construction created by quality of thinking which permeates from and to detail design for assembly/disassembly and production within a collaboratively mechanised AEC team. A theory of nuclear architecture and an associated approach to detail design pedagogy are postulated, aiming to promote a revised perception of the definition of design for the architectural technologist. How this theory can be applied to the creation of a paradigmatic student project, themed on designing for disassembly as a key future focus of ‘Healthy Building’ design is introduced for future exploration. This future research into detail design, the authors propose, should be predicated on the appropriate methodology related to the epistemology of a design-based area of the architectural technology discipline. The roles of Professional, Statutory and Regulatory Bodies (PSRB) in the evaluation and subsequent dissemination of this detail design pedagogy, with the aim of strengthening the architectural technology discipline are emphasised.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Building Information Modelling (BIM) provides a shared source of information about a built asset, which creates a collaborative virtual environment for project teams. Literature suggests that to collaborate efficiently, the relationship between the project team is based on sympathy, obligation, trust and rapport. Communication increases in importance when working collaboratively but effective communication can only be achieved when the stakeholders are willing to act, react, listen and share information. Case study research and interviews with Architecture, Engineering and Construction (AEC) industry experts suggest that synchronous face-to-face communication is project teams’ preferred method, allowing teams to socialise and build rapport, accelerating the creation of trust between the stakeholders. However, virtual unified communication platforms are a close second-preferred option for communication between the teams. Effective methods for virtual communication in professional practice, such as virtual collaboration environments (CVE), that build trust and achieve similar spontaneous responses as face-to-face communication, are necessary to face the global challenges and can be achieved with the right people, processes and technology. This research paper investigates current industry methods for virtual communication within BIM projects and explores the suitability of avatar interaction in a collaborative virtual environment as an alternative to face-to-face communication to enhance collaboration between design teams’ professional practice on a project. Hence, this paper presents comparisons between the effectiveness of these communication methods within construction design teams with results of further experiments conducted to test recommendations for more efficient methods for virtual communication to add value in the workplace between design teams.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Among Small and Medium Sized Enterprises (SMEs) in particular, the UK Government’s ambitions regarding BIM uptake and diffusion across the construction sector may be tempered by a realpolitik shaped in part by interactions between the industry, Higher Education (HE) and professional practice. That premise also has a global perspective. Building on the previous 2 papers, Architectural technology and the BIM Acronym 1 and 2, this third iteration is a synthesis of research and investigations carried out over a number of years directly related to the practical implementation of BIM and its impact upon BE SMEs. First challenges, risks and potential benefits for SMEs and micros in facing up to the necessity to engage with digital tools in a competitive and volatile marketplace are discussed including tailoring BIM to suit business models, and filtering out achievable BIM outcomes from generic and bespoke aspects of practice. Second the focus is on setting up and managing teams engaging with BIM scenarios, including the role of clients; addresses a range of paradigms including lonely BIM and collaborative working. The significance of taking a whole life view with BIM is investigated including embedding soft landings principles into project planning and realisation. Thirdly procedures for setting up and managing common data environments are identified and the value of achieving smooth information flow is addressed. The overall objective of this paper is to provide SMEs with a practical strategy to develop a toolkit to BIM implementation.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Some would argue that there is a need for the traditional lecture format to be rethought in favour of a more active approach. However, this must form part of a bipartite strategy, considered in conjunction with the layout of any new space to facilitate alternative learning and teaching methods. With this in mind, this paper begins to examine the impact of the learning environment on the student learning experience, specifically focusing on students studying on the Architectural Technology and Management programme at Ulster University. The aim of this study is two-fold: to increase understanding of the impact of learning space layout, by taking a student centered approach; and to gain an appreciation of how technology can impact upon the learning space. The study forms part of a wider project being undertaken at Ulster University known as the Learning Landscape Transition Project, exploring the relationship between learning, teaching and space layout. Data collection was both qualitative and quantitative, with use of a case study supported by a questionnaire based on attitudinal scaling. A focus group was also used to further analyse the key trends resulting from the questionnaire. The initial results suggest that the learning environment, and the technology within it, can not only play an important part in the overall learning experience of the student, but also assist with preparation for the working environment to be experienced in professional life.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Teaching architecture is experiencing a moment of opportunity. New methods, like constructivist pedagogy, based on complexity and integration are yet to be explored. In this context of opportunity teaching architecture has a duty to integrate complexity in their curriculum. Teaching methods should also assume inherent indeterminacy and contingency of all complex process. If we accept this condition as part of any teaching method, the notion of truth or falsehood it becomes irrelevant. In this regard it could focus on teaching to contingency of language. Traditionally, technology is defined as the language of science. If we assume contingency as one of the characteristics of language, we could say that technology is also contingent. Therefore we could focus technology teaching to redefine its own vocabulary. So, redefining technological vocabulary could be an area of opportunity for education in architecture. The student could redefine their own tools, technology, to later innovate with them. First redefine the vocabulary, the technology, and then construct the new language, the technique. In the case of Building Technology subjects, it should also incorporate a more holistic approach for enhancing interdisciplinary transfer. Technical transfer, either from nature or other technologies to the field of architecture, is considered as a field of great educational possibilities. Evenmore, student get much broader technical approach that transgresses the boundaries of architectural discipline.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The Architecture and Household Trade Union built nearly 2,000 subsidized dwellings in Albacete from 1941 to 1971. It was the responsible entity from the end of the Civil War until the beginning of Democracy of the social policy programs in Spain. Later on, and together with the National Housing Institute, were responsible for the construction activity. Its limited budget, scarcity of technical and human resources and an urgent need for new housing developments, constituted the basis for producing a vast housing market of low construction qualities. However, thanks to the true architectonic expertise of some of the professionals, some of the developments were designed with a clear urban strategy and in direct relation with the city, which characterizes them to be studied and conserved. This is the case for the selected development for the analysis, the urban complex of the 500 dwellings in Albacete, the Hermanos Falcó Neighborhood. Designed and built between 1963, Alfonso Crespo and Adolfo Gil architects, and 1977 second reformed project by the architect Fernando Rodríguez. It is characterized by its layout on the territory, its controlled relation with the city and its different types of open blocks. Above all, its spatial and human scale strengths, directly related to the European post-war proposals, have to be emphasized; although its technical deficiencies affect the interior quality of the houses. This paper examines its virtues and failures and proposes, using current tools, its renovation. This proposal main aims are to extend its lifetime and develop the particular and urban sustainability levels.

Relevância:

60.00% 60.00%

Publicador:

Relevância:

60.00% 60.00%

Publicador:

Resumo:

As BIM adoption continues, the goal of a totally collaborative model with multiple contributors is attainable. Many initiatives such as the 2016 UK government level 2 BIM deadline are putting pressure on the construction industry to speed up the changeover. Clients and collaborators have higher expectations of using digital 3D models to communicate design ideas and solve practical problems. Contractors and clients are benefitting from cost saving scheduling and clash detection offered by BIM. Effective collaboration on the project will also give speed and efficiency gains. Despite this, many businesses of varying sizes are still having problems. The cost of the software and the training provides an obvious barrier for micro-enterprises and could explain a delay in adoption. Many studies have looked at these problems faced by SME and micro-enterprises. Larger companies have different problems. The efforts made by government to encourage them are quite comprehensive, but is anything being done to help smaller sectors and keep the industry cohesive? This limited study examines several companies of varying size and varying project type: architectural design businesses, main contractor, structural engineer and building consultancy. The study examines the barriers to a truly collaborative BIM workflow facing different specialities on a larger project and a contrasting small/medium project. The findings will establish that different barriers for each sector are actually pushing further apart, thus potentially creating a BIM-only construction elite, leaving the small companies remaining on 2D based drawing.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Cultural heritage sites all over the world are at risk due to aggressive urban expansion, development, wars and general obsolescence. Not all objects are recorded in detail although they may have social and historical significance. For example more emphasis is placed on the recording of castles and palaces than on crofters’ cottages or tenement blocks, although their history can be just as rich. This paper will investigate the historic fabric of Aberdeen through the use of digital scanning, supported by a range of media including old photographs and paintings. Dissemination of social heritage through visualisations will be explored and how this can aid the understanding of space within the city or specific area. Focus will be given to the major statues/monuments within the context of the city centre, exploring their importance in their environment. In addition studying why many have been re-located away from their original site, the reasons why, and how we have perhaps lost some of the social and historical importance of why that monument was first located there. It will be argued that Digital Media could be utilised for much more than re-creation and re-presentation of physical entities. Digital scanning, in association with visualisation tools, is used to capture the essence of both the cultural heritage and the society that created or used the sites in association with visualisation tools and in some way re-enacting the original importance placed upon the monument in its original location, through adoption of BIM Heritage.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The UK construction industry comprises a very high proportion of SMEs that is companies employing up to 250. A Department for Business, Innovation and Skills research paper, found that SMEs had a 71.2% share of work in the construction industry. Micro and small firms (i.e. those employing up to 50) had a share of 46.7% of work (Ive and Murray 2013). The Government has high ambitions for UK construction. Having been found by successive government commissioned studies to be inefficient and highly fragmented, ambitious targets have been set for the industry to achieve 33% reduction in costs and 50% faster delivery by 2025. As a significant construction client, the Government has mandated the use of Level 2 BIM from 2016 on publicly funded projects over £5 million. The adoption of BIM plays a key role in the 2025 vision but a lack of clarity persists in the industry over BIM and significant barriers are perceived to its implementation, particularly amongst SMEs. However, industry wide transformation will be challenging without serious consideration of the capabilities of this large majority. Many larger firms, having implemented Level 2 BIM are now working towards Level 3 BIM while many of the smaller firms in the industry have not even heard of BIM. It would seem that fears of a ‘two tier’ industry are perhaps being realised. This paper builds on an earlier one (Mellon & Kouider 2014) and investigates, through field work, the level of Level 2 BIM implementation amongst SMEs compared to a large organisation. Challenges and innovative solutions identified through collected data are fully discussed and compared. It is suggested that where the SME perceives barriers towards adoption of the technologies which underpin BIM, they may consider collaborative methods of working as an interim step in order to work towards realising the efficiencies and benefits that these methods can yield. While the barriers to adoption of BIM are significant, it is suggested that they are not insurmountable for the SME and some recommendations for possible solutions are made.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

An article presented at the last ICAT- conference stated at the end that buildings at all times tend to picture the people who had them erected. This paper aims to show the correctness of that statement. To this end, it will examine a number of typical residential buildings dating from the beginning of the seventeenth century up to today, investigate who had the buildings erected, and relate that to the performance of the buildings. This relation analysis will mainly use the scale but also the degree of diversity in function and appearance as factors. Furthermore, using economic data and data on the buildings to identify patterns, it will investigate how size of the property and relative size of the capital interest behind the building has developed. Since the authors live in Copenhagen and Copenhagen is very typical in its historical development, buildings and environments in and around the centre of Copenhagen are used as examples.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The construction industry has long been considered as highly fragmented and non-collaborative industry. This fragmentation sprouted from complex and unstructured traditional coordination processes and information exchanges amongst all parties involved in a construction project. This nature coupled with risk and uncertainty has pushed clients and their supply chain to search for new ways of improving their business process to deliver better quality and high performing product. This research will closely investigate the need to implement a Digital Nervous System (DNS), analogous to a biological nervous system, on the flow and management of digital information across the project lifecycle. This will be through direct examination of the key processes and information produced in a construction project and how a DNS can provide a well-integrated flow of digital information throughout the project lifecycle. This research will also investigate how a DNS can create a tight digital feedback loop that enables the organisation to sense, react and adapt to changing project conditions. A Digital Nervous System is a digital infrastructure that provides a well-integrated flow of digital information to the right part of the organisation at the right time. It provides the organisation with the relevant and up-to-date information it needs, for critical project issues, to aid in near real-time decision-making. Previous literature review and survey questionnaires were used in this research to collect and analyse data about information management problems of the industry – e.g. disruption and discontinuity of digital information flow due to interoperability issues, disintegration/fragmentation of the adopted digital solutions and paper-based transactions. Results analysis revealed efficient and effective information management requires the creation and implementation of a DNS.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The construction industry is characterised by fragmentation and suffers from lack of collaboration, often adopting adversarial working practices to achieve deliverables. For the UK Government and construction industry, BIM is a game changer aiming to rectify this fragmentation and promote collaboration. However it has become clear that there is an essential need to have better controls and definitions of both data deliverables and data classification. Traditional methods and techniques for collating and inputting data have shown to be time consuming and provide little to improve or add value to the overall task of improving deliverables. Hence arose the need in the industry to develop a Digital Plan of Work (DPoW) toolkit that would aid the decision making process, providing the required control over the project workflows and data deliverables, and enabling better collaboration through transparency of need and delivery. The specification for the existing Digital Plan of Work (DPoW) was to be, an industry standard method of describing geometric, requirements and data deliveries at key stages of the project cycle, with the addition of a structured and standardised information classification system. However surveys and interviews conducted within this research indicate that the current DPoW resembles a digitised version of the pre-existing plans of work and does not push towards the data enriched decision-making abilities that advancements in technology now offer. A Digital Framework is not simply the digitisation of current or historic standard methods and procedures, it is a new intelligent driven digital system that uses new tools, processes, procedures and work flows to eradicate waste and increase efficiency. In addition to reporting on conducted surveys above, this research paper will present a theoretical investigation into usage of Intelligent Decision Support Systems within a digital plan of work framework. Furthermore this paper will present findings on the suitability to utilise advancements in intelligent decision-making system frameworks and Artificial Intelligence for a UK BIM Framework. This should form the foundations of decision-making for projects implemented at BIM level 2. The gap identified in this paper is that the current digital toolkit does not incorporate the intelligent characteristics available in other industries through advancements in technology and collation of vast amounts of data that a digital plan of work framework could have access to and begin to develop, learn and adapt for decision-making through the live interaction of project stakeholders.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

It has been widely documented that when Building Information Modelling (BIM) is used, there is a shift in effort to the design phase. Little investigation into the impact of this shift in effort has been done and how it impacts on costs. It can be difficult to justify the increased expenditure on BIM in a market that is heavily driven by costs. There are currently studies attempting to quantify the return on investment (ROI) for BIM for which these returns can be seen to balance out the shift in efforts and costs to the design phase. The studies however quantify the ROI based on the individual stakeholder’s investment without consideration for the impact that the use of BIM from their project partners may have on their own profitability. In this study, a questionnaire investigated opinions and experience of construction professionals, representing clients, consultants, designers and contractors, to determine fluctuations in costs by their magnitude and when they occur. These factors were examined more closely by interviewing senior members representing each of the stakeholder categories and comparing their experience in using BIM within environments where their project partners were also using BIM and when they were not. This determined the differences in how the use and the investment in BIM impacts on others and how costs are redistributed. This redistribution is not just through time but also between stakeholders and categories of costs. Some of these cost fluctuations and how the cost of BIM is currently financed are also highlighted in several case studies. The results show that the current distribution of costs set for traditional 2D delivery is hindering the potential success of BIM. There is also evidence that stakeholders who don’t use BIM may benefit financially from the BIM use of others and that collaborative BIM is significantly different to the use of ‘lonely’ BIM in terms of benefits and profitability.