3 resultados para Workplace Essential Skills Case Study Learning
em Universidad de Alicante
Resumo:
As is well known, in order to select remediation measures to correct or prevent slope instabilities, it is essential to identify and characterize the instability mechanisms. This task is especially complex for heterogeneous rock masses such as Flysch formations. This paper addresses the assessment of corrective measures used in carbonate Flysch formations by classifying and grouping field data reported in an available database in order to associate this data with various instability mechanisms and stratigraphic column types as well as with the corrective measures taken to stabilise them. For this purpose, 194 slopes have been geomechanically characterized, mainly by considering the observed instability mechanisms. The corrective measures that were applied have been evaluated for their suitability and performance, and, if applicable, the causes of their malfunction have been also studied. As a result, some guidelines based on the observed behaviour and the suitability of the correction measure as a function of instability type are proposed for similar slopes.
Resumo:
Background: Despite the progress made on policies and programmes to strengthen primary health care teams’ response to Intimate Partner Violence, the literature shows that encounters between women exposed to IPV and health-care providers are not always satisfactory, and a number of barriers that prevent individual health-care providers from responding to IPV have been identified. We carried out a realist case study, for which we developed and tested a programme theory that seeks to explain how, why and under which circumstances a primary health care team in Spain learned to respond to IPV. Methods: A realist case study design was chosen to allow for an in-depth exploration of the linkages between context, intervention, mechanisms and outcomes as they happen in their natural setting. The first author collected data at the primary health care center La Virgen (pseudonym) through the review of documents, observation and interviews with health systems’ managers, team members, women patients, and members of external services. The quality of the IPV case management was assessed with the PREMIS tool. Results: This study found that the health care team at La Virgen has managed 1) to engage a number of staff members in actively responding to IPV, 2) to establish good coordination, mutual support and continuous learning processes related to IPV, 3) to establish adequate internal referrals within La Virgen, and 4) to establish good coordination and referral systems with other services. Team and individual level factors have triggered the capacity and interest in creating spaces for team leaning, team work and therapeutic responses to IPV in La Virgen, although individual motivation strongly affected this mechanism. Regional interventions did not trigger individual and/ or team responses but legitimated the workings of motivated professionals. Conclusions: The primary health care team of La Virgen is involved in a continuous learning process, even as participation in the process varies between professionals. This process has been supported, but not caused, by a favourable policy for integration of a health care response to IPV. Specific contextual factors of La Virgen facilitated the uptake of the policy. To some extent, the performance of La Virgen has the potential to shape the IPV learning processes of other primary health care teams in Murcia.
Resumo:
PAS1192-2 (2013) outlines the “fundamental principles of Level 2 information modeling”, one of these principles is the use of what is commonly referred to as a Common Data Environment (CDE). A CDE could be described as an internet-enabled cloudhosting platform, accessible to all construction team members to access shared project information. For the construction sector to achieve increased productivity goals, the next generation of industry professionals will need to be educated in a way that provides them with an appreciation of Building Information Modelling (BIM) working methods, at all levels, including an understanding of how data in a CDE should be structured, managed, shared and published. This presents a challenge for educational institutions in terms of providing a CDE that addresses the requirements set out in PAS1192-2, and mirrors organisational and professional working practices without causing confusion due to over complexity. This paper presents the findings of a two-year study undertaken at Ulster University comparing the use of a leading industry CDE platform with one derived from the in-house Virtual Learning Environment (VLE), for the delivery of a student BIM project. The research methodology employed was a qualitative case study analysis, focusing on observations from the academics involved and feedback from students. The results of the study show advantages for both CDE platforms depending on the learning outcomes required.