3 resultados para Work accidents reporting
em Universidad de Alicante
Resumo:
Sex and gender differences influence the health and wellbeing of men and women. Although studies have drawn attention to observed differences between women and men across diseases, remarkably little research has been pursued to systematically investigate these underlying sex differences. Women continue to be underrepresented in clinical trials, and even in studies in which both men and women participate, systematic analysis of data to identify potential sex-based differences is lacking. Standards for reporting of clinical trials have been established to ensure provision of complete, transparent and critical information. An important step in addressing the gender imbalance would be inclusion of a gender perspective in the next Consolidated Standards of Reporting Trials (CONSORT) guideline revision. Uniform Requirements for Manuscripts Submitted to Biomedical Journals, as a set of well-recognized and widely used guidelines for authors and biomedical journals, should similarly emphasize the ethical obligation of authors to present data analyzed by gender as a matter of routine. Journal editors are also promoters of ethical research and adequate standards of reporting, and requirements for inclusion of gender analyses should be integrated into editorial policies as a matter of urgency.
Resumo:
Objectives: To assess changes in mental health in a sample of migrant workers after the eruption of the economic crisis in Spain. Methods: 318 migrant workers were interviewed. Mental health, sociodemographic, and economic crisis related variables were obtained through face-to-face (2008) and phone (2011) interviews. Prevalence of poor mental health (PMH) was compared (2011–2008) and multivariate logistic regression models were fitted. Results: Change in prevalence of PMH was higher in men (aOR 4.63; 95 % CI 2.11–10.16). Subgroups of men showing the largest detrimental mental health effects were: unemployed, with low salaries (≤1,200 euros) and those reporting family burden. An increase of PMH was found in women, without significant associations. Conclusions: Mental health of migrant workers in Spain has worsened during the economic crisis.
Resumo:
The construction industry is characterised by fragmentation and suffers from lack of collaboration, often adopting adversarial working practices to achieve deliverables. For the UK Government and construction industry, BIM is a game changer aiming to rectify this fragmentation and promote collaboration. However it has become clear that there is an essential need to have better controls and definitions of both data deliverables and data classification. Traditional methods and techniques for collating and inputting data have shown to be time consuming and provide little to improve or add value to the overall task of improving deliverables. Hence arose the need in the industry to develop a Digital Plan of Work (DPoW) toolkit that would aid the decision making process, providing the required control over the project workflows and data deliverables, and enabling better collaboration through transparency of need and delivery. The specification for the existing Digital Plan of Work (DPoW) was to be, an industry standard method of describing geometric, requirements and data deliveries at key stages of the project cycle, with the addition of a structured and standardised information classification system. However surveys and interviews conducted within this research indicate that the current DPoW resembles a digitised version of the pre-existing plans of work and does not push towards the data enriched decision-making abilities that advancements in technology now offer. A Digital Framework is not simply the digitisation of current or historic standard methods and procedures, it is a new intelligent driven digital system that uses new tools, processes, procedures and work flows to eradicate waste and increase efficiency. In addition to reporting on conducted surveys above, this research paper will present a theoretical investigation into usage of Intelligent Decision Support Systems within a digital plan of work framework. Furthermore this paper will present findings on the suitability to utilise advancements in intelligent decision-making system frameworks and Artificial Intelligence for a UK BIM Framework. This should form the foundations of decision-making for projects implemented at BIM level 2. The gap identified in this paper is that the current digital toolkit does not incorporate the intelligent characteristics available in other industries through advancements in technology and collation of vast amounts of data that a digital plan of work framework could have access to and begin to develop, learn and adapt for decision-making through the live interaction of project stakeholders.