2 resultados para Project management

em Universidad de Alicante


Relevância:

60.00% 60.00%

Publicador:

Resumo:

The literature states that project duration is affected by various scope factors. Using 168 building projects carried out in Spain, this paper uses the multiple regression analysis to develop a forecast model that allows estimating project duration of new builds. The proposed model uses project type, gross floor area (GFA), the cost/GFA relationship and number of floors as predictor variables. The research identified the logarithmic form of construction speed as the most appropriate response variable. GFA has greater influence than cost on project duration but both factors are necessary to achieve a forecast model with the highest accuracy. We developed an analysis to verify the stability of forecasted values and showed how a model with high values of fit and accuracy may display an anomalous behavior in the forecasted values. The sensitivity of the proposed forecast model was also analyzed versus the variability of construction costs.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The main contribution to the radiological impact from natural radiation received by general population is due to the emission of radon (222Rn). The objective of this project is the study of radon gas as a radioactive element in our buildings (existing and future constructions) to avoid its influence in interior rooms. The proposed methodology reflects different aspects of natural radioactivity in buildings, their sources, their control criteria and regulatory framework; aspects related to the presence of radon in our constructions, entryways, measurement methodology for indoor environmental concentration are studied; other protection solutions and remediation measures in both existing buildings and new construction projects are analyzed. In conclusion, the paper presents previous evaluation tools, the analysis of existing concentration and the choice of the most appropriate mitigation / remediation measures depending on each case, through the establishment of different architectural proposals to plan actions against radon where necessary.