2 resultados para PWR
em Universidad de Alicante
Resumo:
This study describes a novel spectral LED-based tunable light source used for customized lighting solutions, especially for the reconstruction of CIE (Commission Internationale de l’Éclairage) standard illuminants. The light source comprises 31 spectral bands ranging from 400 to 700 nm, an integrating cube and a control board with a 16-bit resolution. A minimization algorithm to calculate the weighting values for each channel was applied to reproduce illuminants with precision. The differences in spectral fitting and colorimetric parameters showed that the reconstructed spectra were comparable to the standard, especially for the D65, D50, A and E illuminants. Accurate results were also obtained for illuminants with narrow peaks such as fluorescents (F2 and F11) and a high-pressure sodium lamp (HP1). In conclusion, the developed spectral LED-based light source and the minimization algorithm are able to reproduce any CIE standard illuminants with a high spectral and colorimetric accuracy able to advance available custom lighting systems useful in the industry and other fields such as museum lighting.
Resumo:
There are many models in the literature that have been proposed in the last decades aimed at assessing the reliability, availability and maintainability (RAM) of safety equipment, many of them with a focus on their use to assess the risk level of a technological system or to search for appropriate design and/or surveillance and maintenance policies in order to assure that an optimum level of RAM of safety systems is kept during all the plant operational life. This paper proposes a new approach for RAM modelling that accounts for equipment ageing and maintenance and testing effectiveness of equipment consisting of multiple items in an integrated manner. This model is then used to perform the simultaneous optimization of testing and maintenance for ageing equipment consisting of multiple items. An example of application is provided, which considers a simplified High Pressure Injection System (HPIS) of a typical Power Water Reactor (PWR). Basically, this system consists of motor driven pumps (MDP) and motor operated valves (MOV), where both types of components consists of two items each. These components present different failure and cause modes and behaviours, and they also undertake complex test and maintenance activities depending on the item involved. The results of the example of application demonstrate that the optimization algorithm provide the best solutions when the optimization problem is formulated and solved considering full flexibility in the implementation of testing and maintenance activities taking part of such an integrated RAM model.