2 resultados para Heath risks and benefits
em Universidad de Alicante
Resumo:
Among Small and Medium Sized Enterprises (SMEs) in particular, the UK Government’s ambitions regarding BIM uptake and diffusion across the construction sector may be tempered by a realpolitik shaped in part by interactions between the industry, Higher Education (HE) and professional practice. That premise also has a global perspective. Building on the previous 2 papers, Architectural technology and the BIM Acronym 1 and 2, this third iteration is a synthesis of research and investigations carried out over a number of years directly related to the practical implementation of BIM and its impact upon BE SMEs. First challenges, risks and potential benefits for SMEs and micros in facing up to the necessity to engage with digital tools in a competitive and volatile marketplace are discussed including tailoring BIM to suit business models, and filtering out achievable BIM outcomes from generic and bespoke aspects of practice. Second the focus is on setting up and managing teams engaging with BIM scenarios, including the role of clients; addresses a range of paradigms including lonely BIM and collaborative working. The significance of taking a whole life view with BIM is investigated including embedding soft landings principles into project planning and realisation. Thirdly procedures for setting up and managing common data environments are identified and the value of achieving smooth information flow is addressed. The overall objective of this paper is to provide SMEs with a practical strategy to develop a toolkit to BIM implementation.
Resumo:
The UK construction industry comprises a very high proportion of SMEs that is companies employing up to 250. A Department for Business, Innovation and Skills research paper, found that SMEs had a 71.2% share of work in the construction industry. Micro and small firms (i.e. those employing up to 50) had a share of 46.7% of work (Ive and Murray 2013). The Government has high ambitions for UK construction. Having been found by successive government commissioned studies to be inefficient and highly fragmented, ambitious targets have been set for the industry to achieve 33% reduction in costs and 50% faster delivery by 2025. As a significant construction client, the Government has mandated the use of Level 2 BIM from 2016 on publicly funded projects over £5 million. The adoption of BIM plays a key role in the 2025 vision but a lack of clarity persists in the industry over BIM and significant barriers are perceived to its implementation, particularly amongst SMEs. However, industry wide transformation will be challenging without serious consideration of the capabilities of this large majority. Many larger firms, having implemented Level 2 BIM are now working towards Level 3 BIM while many of the smaller firms in the industry have not even heard of BIM. It would seem that fears of a ‘two tier’ industry are perhaps being realised. This paper builds on an earlier one (Mellon & Kouider 2014) and investigates, through field work, the level of Level 2 BIM implementation amongst SMEs compared to a large organisation. Challenges and innovative solutions identified through collected data are fully discussed and compared. It is suggested that where the SME perceives barriers towards adoption of the technologies which underpin BIM, they may consider collaborative methods of working as an interim step in order to work towards realising the efficiencies and benefits that these methods can yield. While the barriers to adoption of BIM are significant, it is suggested that they are not insurmountable for the SME and some recommendations for possible solutions are made.