17 resultados para Finishes in the construction
em Universidad de Alicante
Resumo:
Both the current economic situation in the construction sector and the continuous normative changes in the building area imply the use of new methodologies to enhance students’ competences in the degree of Building Engineer. The aim of this paper is to present, analyse and discuss the development of constructive workshops as a new teaching methodology used in the subject of Construction of Structures I at the University of Alicante to complement the constructive and technical knowledge acquired by our students and to enhance their communicative and representation skills essential for their professional practice in the future. The used methodology is based on the development of three-dimensional construction details (in groups of 3 or 4 students) to be shown in two A1-pannels exposed in the corridors of the Polytechnic School. Thus, students’ work approaches constructive problems in a global way by discussing simultaneously with teachers and other groups about the most suitable solution on each case. This contribution has multiperspective results and improves criticism of students in different areas, encouraging new learning strategies and active participation. What is more, on-line information and web applications have been used to prepare and organize this kind of workshops, allowing students to use new technologies as a complementary learning methodology. In conclusion, the use of these new workshops in the Degree of Building Engineer stimulates an interactive class versus a traditional lecture where the participative groups´ attitude and the development of oral presentations dissolve the traditional boundaries regarding public communication skills of the students in the Degree.
Resumo:
A Mass Customisation model is discussed as a competitive positioning strategy in the marketplace adding value to the customer’s end-use. It includes the user as part of the construction process responding to the customer’s demands and wishes. To the present day, almost all proposals for Mass Customisation have been focused on the design phase and single family houses. The reality is that the processes carried out in the work execution are so inefficient that the costs of the Mass Customisation models are assumed by the customer and they do not offer solutions that support the change management. Furthermore, this inefficiency often makes Mass Customisation unfeasible in terms of deadlines and site management. Therefore, the present proposal focuses on achieving the paradigm of Mass Customisation in the traditional residential construction complementary to the existing proposals in the design phase. All this through the proposal of a framework for the integral management in the work execution, which will address change management introduced by the users offering an efficient and productive model that reduces costs in the process. This model will focus on the synergy between different strategies, techniques and technologies currently used in the construction management (such as Lean Construction or Six Sigma), together with, other strategies and technologies that have proven to be valid solutions in other fields (such as Business Process Management, Service Oriented Architecture, etc.).
Resumo:
From the late seventeenth to early nineteenth centuries, many religious temples have been built in the province of Alicante (south east of Spain) with brick domes as their main characteristic feature. Often, the limited data available about these remarkable constructions make rehabilitation interventions become into real research projects, with a high value for their historic conservation over time. The aim of this paper is to show a detailed refurbishment analysis of a religious temple built in 1778, showing the need of preservation of historic buildings as a part of the architectural heritage by establishing a common pattern of materials, geometry and constructive systems, specifically in their domes. In most cases, there was not an architectural project for the construction, that is why the analysis of any documentary and archival sources available is essential to find different ways to proceed on the use and maintenance of these religious buildings.
Resumo:
Today, the requirement of professional skills to university students is constantly increasing in our society. In our opinion, the content offered in official degrees need to be nourished with different variables, enriching their global professional knowledge in a parallel way; that is why, in recent years, there is a great multiplicity of complementary courses at university. One of the most socially demanded technical requirements within the architectural, design or engineering field is the management of 3D drawing software, becoming an indispensable reality in these sectors. Thus, this specific training becomes essential over two-dimension traditional design, because the inclusion of great possibilities of spatial development that go beyond conventional orthographic projections (plans, sections or elevations), allowing modelling and rotation of the selected items from multiple angles and perspectives. Therefore, this paper analyzes the teaching methodology of a complementary course for those technicians in the construction industry interested in computer-aided design, using modelling (SketchupMake) and rendering programs (Kerkythea). The course is developed from the technician point of view, by learning computer management and its application to professional development from a more general to a more specific view through practical examples. The proposed methodology is based on the development of real examples in different professional environments such as rehabilitation, new constructions, opening projects or architectural design. This multidisciplinary contribution improves criticism of students in different areas, encouraging new learning strategies and the independent development of three-dimensional solutions. Thus, the practical implementation of new situations, even suggested by the students themselves, ensures active participation, saving time during the design process and the increase of effectiveness when generating elements which may be represented, moved or virtually tested. In conclusion, this teaching-learning methodology improves the skills and competencies of students to face the growing professional demands of society. After finishing the course, technicians not only improved their expertise in the field of drawing but they also enhanced their capacity for spatial vision; both essential qualities in these sectors that can be applied to their professional development with great success.
Resumo:
Nowadays, on a global level, the Higher Education System has a complex and broad horizon of curricular tools to use in the teaching and learning process. In addition to these new educational instruments, full of possibilities, we face specific socio-economic conditions that affect in a significantly way the Curriculum Development in certain knowledge areas (areas traditionally built on a methodology based on a physical presence of students in the classroom). Some areas such as Restoration, Rehabilitation or Construction Pathologies, and the construction sector in general, require very defined and particular knowledge that only a small number of experts claim as specialized training. All these aspects condition the teaching methodology performed in a physical classroom at a university campus (the only option used until recent years) and made us consider the integration of online teaching in these areas too. The present work shows the teaching methodology used for the development of two online courses, where we offer distance learning for "highly specialized" formation in the Edification area (an area where traditionally there was only classroom training). At the beginning, both courses were designed by classroom training, but got a really small number of applications due to the specialized topic proposed. Later, we proposed a "Curriculum Redesign" of the contents, offering an online modality, which implied a significant demand both within and outside the university area. A notable feature of this educational experience is the great spectrum opened for attendees of both courses in the online version. This situation improved significantly the "Curriculum Development" for the student and implied an interesting new proposal on the offered contents and materials (what would have been really difficult to get in a face to face classroom). In conclusion, the absence of certain types of specialized contents in the academic university curricula makes essential to raise new methodologies to save the gap in this area through additional training courses as those analyzed in this paper. Thus, our experience opens a debate on the appropriateness of implementing online training in relation to the face to face training in constructive content subjects and, especially, presents a new scheme, not without controversy, for the curriculum design.
Resumo:
The subject of Construction of Structures I studies, from a constructive point of view and taking into account current legislation, reinforced concrete structures used in buildings, through the acquisition of knowledge and construction criteria required in the profession of a Technical Architect. The contents acquired in this course are essential for further professional development of technicians and are closely related to many of the subjects taught in the same or other courses of the Degree in Technical Architecture at the University of Alicante. The aim of this paper is to present, analyze and discuss the development of a new methodology proposed in the mentioned subject, as it supposed an important change in the traditional way of teaching Construction and Structures I. In order to incorporate new teaching tools in 2013-2014, the course has been implemented by using a Moodle software tool to promote blended learning with online exercises. Our Moodle community allows collaborative work within an open-source platform where teachers and students share a new and personalized learning environment. Students are easily used to the interface and the platform, value the constant connection with teachers or other fellows and completely agree with the possibility of making questions or share documents 24 hours a day. The proposed methodology consists of lectures and practical classes. In the lectures, the basics of each topic are discussed; class attendance, daily study and conducting scheduled exercises are indispensable. Practical classes allow to consolidate the knowledge gained in theory classes by solving professional exercises and actual construction problems related to structures, that shall be compulsorily delivered online. So, after the correction of the teacher and the subsequent feedback of students, practical exercises ensure lifelong learning of the student, who can download any kind of material at any time (constructive details, practical exercises and even corrected exams). Regarding the general evaluation system, goals achievement is assessed on an ongoing basis (65% of the final mark) along the course through written and graphic evidences in person and online, as well as a individual development of a workbook. In all cases, the acquisition of skills, the ability to synthesize, the capacity of logical and critical thinking are assessed. The other 35 % of the mark is evaluated by a complementary graphic exam. Participation in the computing platform is essential and the student is required to do and present, at least 90% of the practices proposed. Those who do not comply with the practices in each specific date could not be assessed continuously and may only choose the final exam. In conclusion, the subject of Construction of Structures I is essential in the development of the regulated profession of Technical Architect as they are considered, among other professional profiles, as specialists in construction of building structures. The use of a new communication platform and online teaching allows the acquisition of knowledge and constructive approaches in a continuous way, with a more direct and personal monitoring by the teacher that has been highly appreciated by almost 100% of the students. Ultimately, it is important to say that the use of Moodle in this subject is a very interesting tool, which was really well welcome by students in one of the densest and important subjects of the Degree of Technical Architecture.
Resumo:
It has been widely documented that when Building Information Modelling (BIM) is used, there is a shift in effort to the design phase. Little investigation into the impact of this shift in effort has been done and how it impacts on costs. It can be difficult to justify the increased expenditure on BIM in a market that is heavily driven by costs. There are currently studies attempting to quantify the return on investment (ROI) for BIM for which these returns can be seen to balance out the shift in efforts and costs to the design phase. The studies however quantify the ROI based on the individual stakeholder’s investment without consideration for the impact that the use of BIM from their project partners may have on their own profitability. In this study, a questionnaire investigated opinions and experience of construction professionals, representing clients, consultants, designers and contractors, to determine fluctuations in costs by their magnitude and when they occur. These factors were examined more closely by interviewing senior members representing each of the stakeholder categories and comparing their experience in using BIM within environments where their project partners were also using BIM and when they were not. This determined the differences in how the use and the investment in BIM impacts on others and how costs are redistributed. This redistribution is not just through time but also between stakeholders and categories of costs. Some of these cost fluctuations and how the cost of BIM is currently financed are also highlighted in several case studies. The results show that the current distribution of costs set for traditional 2D delivery is hindering the potential success of BIM. There is also evidence that stakeholders who don’t use BIM may benefit financially from the BIM use of others and that collaborative BIM is significantly different to the use of ‘lonely’ BIM in terms of benefits and profitability.
Resumo:
Concern for the environment has lately heightened awareness about the need for recycling in the construction industry. However, some standards, such as the Spanish standard, only accept the recycling of aggregates derived from concrete, which limits the extensive use of construction and demolition waste, which are produced in much bigger volumes. The aim of this work was to explore the possibility of using recycled mixed aggregates (RMA) in the preparation of precast non-structural concretes. To that end different percentages of natural aggregate were replaced by RMA in non-structural elements (25, 50, 75 and 100%). Contents of cement, water, and the dosages commonly used by companies were unchanged by the introduction of RMA. The characterization of the prepared elements has been done using the specific tests for each type of non-structural element (terrazzo for indoor use, hollow tiles, kerbstones and paving blocks): compression and flexural strength, water absorption, dimensional tolerances, abrasion and slipping resistance. The paving blocks, kerbstones, and hollow tiles prepared were tested for 360 days. The stability of the tested properties confirmed the possibility of using these wastes on an industrial scale satisfying the standard requirements. However, the surface of terrazzo with RMA is not as good as that prepared with natural aggregate.
Resumo:
This historical study uses qualitative methods to analyze and describe the components of the material world of nursing care in Spain between 1855 and 1955 based on the analysis of eight nurse training manuals. A total of 360 objects and 45 procedures were recorded. Manual analysis was carried out concurrently with data collection based on the Grounded Theory approach. Findings show that the material world of health care was composed of objects that were handed down by the medical profession to health care professionals and adapted objects, improvised mainly out of everyday household items. While the handing down of medical tools and instruments could be said to be a theoretical and technical achievement, it is not clear whether it was also a scientific accomplishment. The improvisation of objects out of everyday household items promoted by the manuals highlights the artisan-like and ingenious nature of nursing practice, which should be explored further in future studies to provide a greater understanding and promote the recognition of these objects as a health care technology.
Resumo:
The Huangtupo landslide is one of the largest in the Three Gorges region, China. The county-seat town of Badong, located on the south shore between the Xiling and Wu gorges of the Yangtze River, was moved to this unstable slope prior to the construction of the Three Gorges Project, since the new Three Gorges reservoir completely submerged the location of the old city. The instability of the slope is affecting the new town by causing residential safety problems. The Huangtupo landslide provides scientists an opportunity to understand landslide response to fluctuating river water level and heavy rainfall episodes, which is essential to decide upon appropriate remediation measures. Interferometric Synthetic Aperture Radar (InSAR) techniques provide a very useful tool for the study of superficial and spatially variable displacement phenomena. In this paper, three sets of radar data have been processed to investigate the Huangtupo landslide. Results show that maximum displacements are affecting the northwest zone of the slope corresponding to Riverside slumping mass I#. The other main landslide bodies (i.e. Riverside slumping mass II#, Substation landslide and Garden Spot landslide) exhibit a stable behaviour in agreement with in situ data, although some active areas have been recognized in the foot of the Substation landslide and Garden Spot landslide. InSAR has allowed us to study the kinematic behaviour of the landslide and to identify its active boundaries. Furthermore, the analysis of the InSAR displacement time-series has helped recognize the different displacement patterns on the slope and their relationships with various triggering factors. For those persistent scatterers, which exhibit long-term displacements, they can be decomposed into a creep model (controlled by geological conditions) and a superimposed recoverable term (dependent on external factors), which appears closely correlated with reservoir water level changes close to the river's edge. These results, combined with in situ data, provide a comprehensive analysis of the Huangtupo landslide, which is essential for its management.
Resumo:
Heritage conservation has raised historical problems usually centered in defects resulting from water leaks. Thus, any intervention is presented as a difficult task, both due to building techniques to be used and the lack of economic resources in many cases. In relation to the temples existing in Alicante (Spain), water drainage is solved with pitched roofs on slope formation (in vaulted naves) or directly supported on the vaulted elements (in the domes). Since those construction systems are composed by brick and plaster, the presence of moisture is problematic, and represents a risk of losing the strength capacity and therefore the stability of the dome. An example of this problem is the dome of the church “Nuestra Señora de Belén” in Crevillente, built with solid bricks, it has the highest diameter of the province (18th century). This historic building has been restored on several occasions in the recent years due to moisture, cracks or fissures. The study of these works give an idea of the difficulties of maintenance, conservation and proper restoration of such kind of buildings as unique and valued constructions in our heritage.
Resumo:
This study analyzes the traffic generated on YouTube around television series. We selected a sample of 314 short YouTube videos about 21 Spanish TV series that premiered in 2013 by Spain’s three most popular mainstream television networks (Telecinco, Antena 3, and La1). These videos, which together received more than 24 million views, were classified according to two key variables: the nature (official or nonofficial) of the YouTube channel on which they were located and the exclusivity of their content (already broadcast on TV or Web exclusive). The analysis allows us to characterize the strategies used by TV networks on YouTube and the activity of fans as well as their efforts in the construction of a transmedia narrative universe around TV series.
Resumo:
Building Information Modelling (BIM) provides a shared source of information about a built asset, which creates a collaborative virtual environment for project teams. Literature suggests that to collaborate efficiently, the relationship between the project team is based on sympathy, obligation, trust and rapport. Communication increases in importance when working collaboratively but effective communication can only be achieved when the stakeholders are willing to act, react, listen and share information. Case study research and interviews with Architecture, Engineering and Construction (AEC) industry experts suggest that synchronous face-to-face communication is project teams’ preferred method, allowing teams to socialise and build rapport, accelerating the creation of trust between the stakeholders. However, virtual unified communication platforms are a close second-preferred option for communication between the teams. Effective methods for virtual communication in professional practice, such as virtual collaboration environments (CVE), that build trust and achieve similar spontaneous responses as face-to-face communication, are necessary to face the global challenges and can be achieved with the right people, processes and technology. This research paper investigates current industry methods for virtual communication within BIM projects and explores the suitability of avatar interaction in a collaborative virtual environment as an alternative to face-to-face communication to enhance collaboration between design teams’ professional practice on a project. Hence, this paper presents comparisons between the effectiveness of these communication methods within construction design teams with results of further experiments conducted to test recommendations for more efficient methods for virtual communication to add value in the workplace between design teams.
Resumo:
As BIM adoption continues, the goal of a totally collaborative model with multiple contributors is attainable. Many initiatives such as the 2016 UK government level 2 BIM deadline are putting pressure on the construction industry to speed up the changeover. Clients and collaborators have higher expectations of using digital 3D models to communicate design ideas and solve practical problems. Contractors and clients are benefitting from cost saving scheduling and clash detection offered by BIM. Effective collaboration on the project will also give speed and efficiency gains. Despite this, many businesses of varying sizes are still having problems. The cost of the software and the training provides an obvious barrier for micro-enterprises and could explain a delay in adoption. Many studies have looked at these problems faced by SME and micro-enterprises. Larger companies have different problems. The efforts made by government to encourage them are quite comprehensive, but is anything being done to help smaller sectors and keep the industry cohesive? This limited study examines several companies of varying size and varying project type: architectural design businesses, main contractor, structural engineer and building consultancy. The study examines the barriers to a truly collaborative BIM workflow facing different specialities on a larger project and a contrasting small/medium project. The findings will establish that different barriers for each sector are actually pushing further apart, thus potentially creating a BIM-only construction elite, leaving the small companies remaining on 2D based drawing.
Resumo:
The construction industry has long been considered as highly fragmented and non-collaborative industry. This fragmentation sprouted from complex and unstructured traditional coordination processes and information exchanges amongst all parties involved in a construction project. This nature coupled with risk and uncertainty has pushed clients and their supply chain to search for new ways of improving their business process to deliver better quality and high performing product. This research will closely investigate the need to implement a Digital Nervous System (DNS), analogous to a biological nervous system, on the flow and management of digital information across the project lifecycle. This will be through direct examination of the key processes and information produced in a construction project and how a DNS can provide a well-integrated flow of digital information throughout the project lifecycle. This research will also investigate how a DNS can create a tight digital feedback loop that enables the organisation to sense, react and adapt to changing project conditions. A Digital Nervous System is a digital infrastructure that provides a well-integrated flow of digital information to the right part of the organisation at the right time. It provides the organisation with the relevant and up-to-date information it needs, for critical project issues, to aid in near real-time decision-making. Previous literature review and survey questionnaires were used in this research to collect and analyse data about information management problems of the industry – e.g. disruption and discontinuity of digital information flow due to interoperability issues, disintegration/fragmentation of the adopted digital solutions and paper-based transactions. Results analysis revealed efficient and effective information management requires the creation and implementation of a DNS.