19 resultados para Congress of Tucuman
em Universidad de Alicante
Resumo:
Póster presentado en 19th International Congress of Chemical and Process Engineering, Prague, Czech Republic August 28th-September 1st, 2010.
Resumo:
Póster presentado en 19th International Congress of Chemical and Process Engineering, Prague, Czech Republic August 28th-September 1st, 2010.
Resumo:
Comunicación presentada en forma de póster en el "12th Mediterranean Congress of Chemical Engineering", Barcelona (Spain), November 15-18, 2011
Resumo:
Comunicación presentada en forma de póster en el "12th Mediterranean Congress of Chemical Engineering", Barcelona (Spain), November 15-18, 2011.
Resumo:
Paper submitted to the 42nd Congress of ERSA, Dortmund, August 27th–31st 2002.
Resumo:
Paper submitted to the 44th European Congress of the European Regional Science Association, Porto, 25-29 August 2004.
Resumo:
Paper submitted to the 51st European Congress of the Regional Science Association International, 37th Spanish Regional Science Association Conference, Barcelona, August 30-September 3, 2011.
Resumo:
13th Mediterranean Congress of Chemical Engineering (Sociedad Española de Química Industrial e Ingeniería Química, Fira Barcelona, Expoquimia), Barcelona, September 30-October 3, 2014
Resumo:
The Architecture and Household Trade Union built nearly 2,000 subsidized dwellings in Albacete from 1941 to 1971. It was the responsible entity from the end of the Civil War until the beginning of Democracy of the social policy programs in Spain. Later on, and together with the National Housing Institute, were responsible for the construction activity. Its limited budget, scarcity of technical and human resources and an urgent need for new housing developments, constituted the basis for producing a vast housing market of low construction qualities. However, thanks to the true architectonic expertise of some of the professionals, some of the developments were designed with a clear urban strategy and in direct relation with the city, which characterizes them to be studied and conserved. This is the case for the selected development for the analysis, the urban complex of the 500 dwellings in Albacete, the Hermanos Falcó Neighborhood. Designed and built between 1963, Alfonso Crespo and Adolfo Gil architects, and 1977 second reformed project by the architect Fernando Rodríguez. It is characterized by its layout on the territory, its controlled relation with the city and its different types of open blocks. Above all, its spatial and human scale strengths, directly related to the European post-war proposals, have to be emphasized; although its technical deficiencies affect the interior quality of the houses. This paper examines its virtues and failures and proposes, using current tools, its renovation. This proposal main aims are to extend its lifetime and develop the particular and urban sustainability levels.
Resumo:
In this paper we explore the implications of pluralist curricula for architectural technology. This includes the potential effects on strengthening the identity of the architectural technology profession and the academic development of the discipline. This latter relies, arguably, on research being explicit in CIAT’s eight mandatory threshold standards. This work concentrates on one of the Chartered Institute of Architectural Technologist’s (CIATS’s) key subjects; 'design', defined as detail design for the architectural technologist. In postulating a philosophy of architectural technology epistemology with a focus on detail design, the pedagogy of architectural detailing in practice and academia is investigated: the associated roles of creativity and conditioning are explored. The interrelationship between conceptual design and construction processes in practice is outlined, identifying the role of the detail design specialist (architectural technologist) in the management of design and production information. Thus is identified the future architectural technologists’ specialisation of nuclear architecture: the total quality construction created by quality of thinking which permeates from and to detail design for assembly/disassembly and production within a collaboratively mechanised AEC team. A theory of nuclear architecture and an associated approach to detail design pedagogy are postulated, aiming to promote a revised perception of the definition of design for the architectural technologist. How this theory can be applied to the creation of a paradigmatic student project, themed on designing for disassembly as a key future focus of ‘Healthy Building’ design is introduced for future exploration. This future research into detail design, the authors propose, should be predicated on the appropriate methodology related to the epistemology of a design-based area of the architectural technology discipline. The roles of Professional, Statutory and Regulatory Bodies (PSRB) in the evaluation and subsequent dissemination of this detail design pedagogy, with the aim of strengthening the architectural technology discipline are emphasised.
Resumo:
Cultural heritage sites all over the world are at risk due to aggressive urban expansion, development, wars and general obsolescence. Not all objects are recorded in detail although they may have social and historical significance. For example more emphasis is placed on the recording of castles and palaces than on crofters’ cottages or tenement blocks, although their history can be just as rich. This paper will investigate the historic fabric of Aberdeen through the use of digital scanning, supported by a range of media including old photographs and paintings. Dissemination of social heritage through visualisations will be explored and how this can aid the understanding of space within the city or specific area. Focus will be given to the major statues/monuments within the context of the city centre, exploring their importance in their environment. In addition studying why many have been re-located away from their original site, the reasons why, and how we have perhaps lost some of the social and historical importance of why that monument was first located there. It will be argued that Digital Media could be utilised for much more than re-creation and re-presentation of physical entities. Digital scanning, in association with visualisation tools, is used to capture the essence of both the cultural heritage and the society that created or used the sites in association with visualisation tools and in some way re-enacting the original importance placed upon the monument in its original location, through adoption of BIM Heritage.
Resumo:
The construction industry has long been considered as highly fragmented and non-collaborative industry. This fragmentation sprouted from complex and unstructured traditional coordination processes and information exchanges amongst all parties involved in a construction project. This nature coupled with risk and uncertainty has pushed clients and their supply chain to search for new ways of improving their business process to deliver better quality and high performing product. This research will closely investigate the need to implement a Digital Nervous System (DNS), analogous to a biological nervous system, on the flow and management of digital information across the project lifecycle. This will be through direct examination of the key processes and information produced in a construction project and how a DNS can provide a well-integrated flow of digital information throughout the project lifecycle. This research will also investigate how a DNS can create a tight digital feedback loop that enables the organisation to sense, react and adapt to changing project conditions. A Digital Nervous System is a digital infrastructure that provides a well-integrated flow of digital information to the right part of the organisation at the right time. It provides the organisation with the relevant and up-to-date information it needs, for critical project issues, to aid in near real-time decision-making. Previous literature review and survey questionnaires were used in this research to collect and analyse data about information management problems of the industry – e.g. disruption and discontinuity of digital information flow due to interoperability issues, disintegration/fragmentation of the adopted digital solutions and paper-based transactions. Results analysis revealed efficient and effective information management requires the creation and implementation of a DNS.
Resumo:
The construction industry is characterised by fragmentation and suffers from lack of collaboration, often adopting adversarial working practices to achieve deliverables. For the UK Government and construction industry, BIM is a game changer aiming to rectify this fragmentation and promote collaboration. However it has become clear that there is an essential need to have better controls and definitions of both data deliverables and data classification. Traditional methods and techniques for collating and inputting data have shown to be time consuming and provide little to improve or add value to the overall task of improving deliverables. Hence arose the need in the industry to develop a Digital Plan of Work (DPoW) toolkit that would aid the decision making process, providing the required control over the project workflows and data deliverables, and enabling better collaboration through transparency of need and delivery. The specification for the existing Digital Plan of Work (DPoW) was to be, an industry standard method of describing geometric, requirements and data deliveries at key stages of the project cycle, with the addition of a structured and standardised information classification system. However surveys and interviews conducted within this research indicate that the current DPoW resembles a digitised version of the pre-existing plans of work and does not push towards the data enriched decision-making abilities that advancements in technology now offer. A Digital Framework is not simply the digitisation of current or historic standard methods and procedures, it is a new intelligent driven digital system that uses new tools, processes, procedures and work flows to eradicate waste and increase efficiency. In addition to reporting on conducted surveys above, this research paper will present a theoretical investigation into usage of Intelligent Decision Support Systems within a digital plan of work framework. Furthermore this paper will present findings on the suitability to utilise advancements in intelligent decision-making system frameworks and Artificial Intelligence for a UK BIM Framework. This should form the foundations of decision-making for projects implemented at BIM level 2. The gap identified in this paper is that the current digital toolkit does not incorporate the intelligent characteristics available in other industries through advancements in technology and collation of vast amounts of data that a digital plan of work framework could have access to and begin to develop, learn and adapt for decision-making through the live interaction of project stakeholders.
Resumo:
It has been widely documented that when Building Information Modelling (BIM) is used, there is a shift in effort to the design phase. Little investigation into the impact of this shift in effort has been done and how it impacts on costs. It can be difficult to justify the increased expenditure on BIM in a market that is heavily driven by costs. There are currently studies attempting to quantify the return on investment (ROI) for BIM for which these returns can be seen to balance out the shift in efforts and costs to the design phase. The studies however quantify the ROI based on the individual stakeholder’s investment without consideration for the impact that the use of BIM from their project partners may have on their own profitability. In this study, a questionnaire investigated opinions and experience of construction professionals, representing clients, consultants, designers and contractors, to determine fluctuations in costs by their magnitude and when they occur. These factors were examined more closely by interviewing senior members representing each of the stakeholder categories and comparing their experience in using BIM within environments where their project partners were also using BIM and when they were not. This determined the differences in how the use and the investment in BIM impacts on others and how costs are redistributed. This redistribution is not just through time but also between stakeholders and categories of costs. Some of these cost fluctuations and how the cost of BIM is currently financed are also highlighted in several case studies. The results show that the current distribution of costs set for traditional 2D delivery is hindering the potential success of BIM. There is also evidence that stakeholders who don’t use BIM may benefit financially from the BIM use of others and that collaborative BIM is significantly different to the use of ‘lonely’ BIM in terms of benefits and profitability.