2 resultados para Changeover

em Universidad de Alicante


Relevância:

10.00% 10.00%

Publicador:

Resumo:

The McCabe-Thiele method is a classical approximate graphical method for the conceptual design of binary distillation columns which is still widely used, mainly for didactical purposes, though it is also valuable for quick preliminary calculations. Nevertheless, no complete description of the method has been found and situations such as different thermal feed conditions, multiple feeds, possibilities to extract by-products or to add or remove heat, are not always considered. In the present work we provide a systematic analysis of such situations by developing the generalized equations for: a) the operating lines (OL) of each sector, and b) the changeover line that provides the connection between two consecutive trays of the corresponding sectors separated by a lateral stream of feed, product, or a heat removal or addition.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

As BIM adoption continues, the goal of a totally collaborative model with multiple contributors is attainable. Many initiatives such as the 2016 UK government level 2 BIM deadline are putting pressure on the construction industry to speed up the changeover. Clients and collaborators have higher expectations of using digital 3D models to communicate design ideas and solve practical problems. Contractors and clients are benefitting from cost saving scheduling and clash detection offered by BIM. Effective collaboration on the project will also give speed and efficiency gains. Despite this, many businesses of varying sizes are still having problems. The cost of the software and the training provides an obvious barrier for micro-enterprises and could explain a delay in adoption. Many studies have looked at these problems faced by SME and micro-enterprises. Larger companies have different problems. The efforts made by government to encourage them are quite comprehensive, but is anything being done to help smaller sectors and keep the industry cohesive? This limited study examines several companies of varying size and varying project type: architectural design businesses, main contractor, structural engineer and building consultancy. The study examines the barriers to a truly collaborative BIM workflow facing different specialities on a larger project and a contrasting small/medium project. The findings will establish that different barriers for each sector are actually pushing further apart, thus potentially creating a BIM-only construction elite, leaving the small companies remaining on 2D based drawing.