2 resultados para anthropogenic pressures
em University of Washington
Resumo:
Estuaries provide crucial ecosystem functions and contain significant socio-economic value. Within Washington State, estuaries supply rearing habitat for juvenile salmon during their transition period from freshwater to open sea. In order to properly manage wetland resources and restore salmon habitat, the mechanisms through which estuaries evolve and adapt to pressures from climate change, most notably eustatic sea level rise, must be understood. Estuaries maintain elevation relative to sea level rise through vertical accretion of sediment. This report investigates the processes that contribute to local surface elevation change in the Snohomish Estuary, conveys preliminary surface elevation change results from RTK GPS monitoring, and describes how surface elevation change will be monitored with a network of RSET-MH’s. Part of the tidal wetlands within the Snohomish River Estuary were converted for agricultural and industrial purposes in the 1800’s, which resulted in subsidence of organic soils and loss of habitat. The Tulalip Tribes, the National Oceanic and Atmospheric Administration (NOAA), Northwest Indian Fisheries Commission (NWIFC), and the Environmental Protection Agency (EPA) are conducting a large-scale restoration project to improve ecosystem health and restore juvenile salmon habitat. A study by Crooks et al. (2014) used 210Pb and carbon densities within sediment cores to estimate wetland re-building capacities, sediment accretion rates, and carbon sequestration potential within the Snohomish Estuary. This report uses the aforementioned study in combination with research on crustal movement, tidal patterns, sediment supply, and sea level rise predictions in the Puget Sound to project how surface elevation will change in the Snohomish Estuary with respect to sea level rise. Anthropogenic modification of the floodplain has reduced the quantity of vegetation and functional connectivity within the Snohomish Estuary. There have been losses up to 99% in vegetation coverage from historic extents within the estuary in both freshwater and mesohaline environments. Hydrographic monitoring conducted by NOAA and the Tulalip Tribe shows that 85% of the historic wetland area is not connected to the main stem of the Snohomish (Jason Hall 2014, unpublished data, NOAA). As vegetation colonization and functional connectivity of the floodplains of the Snohomish estuary is re-established through passive and active restoration, sediment transport and accretion is expected to increase. Under the Intergovernmental Panel on Climate Change (IPCC) “medium- probability” scenario sea level is projected to rise at a rate of 4.28 mm/year in the Puget Sound. Sea level rise in the Snohomish Estuary will be exacerbated from crustal deformation from subsidence and post-glacial rebound, which are measured to be -1.4 mm/year and -0.02 mm/year, respectively. Sediment accretion rates calculated by Crooks et al. (2014) and RTK GPS monitoring of surface elevation change of the Marysville Mitigation site from 2011-2014 measured vertical accretion rates that range from -48-19 mm/year and have high spatial variability. Sediment supply is estimated at 490 thousand tons/year, which may be an under-estimate because of the exclusion of tidal transport in this value. The higher rates of sediment accretion measured in the Snohomish Estuary suggest that the Snohomish will likely match or exceed the pace of sea level rise under “medium-probability” projections. The network of RSET-MH instruments will track surface elevation change within the estuary, and provide a more robust dataset on rates of surface elevation change to quantify how vertical accretion and subsidence are contributing to surface elevation change on a landscape scale.
Resumo:
This report provides the findings and opinions of a historical document review, hydraulic balance calculation, and proposed additional study for a property that was historically used as a bulk petroleum storage and distribution facility. The property lies along the base, west, of a heavily vegetated bluff with a tidally influenced body of water west-adjacent to the property. The western portion of the property is bounded by a seawall spanning approximately 3,200 linear feet trending north-south. The seawall’s construction details are not known, save for a 225-foot section of driven sheet pile wall located within the northern portion of the property’s seawall. Due to the presence of petroleum hydrocarbons in soil and groundwater at the property, a cleanup action for the property will likely be overseen by the state regulatory agency. The property is currently undergoing remedial investigation in an effort to identify the lateral and vertical extent in which contaminants at the property have come to be located, also known as the “site” as defined by the Model Toxics Control Act (MTCA). The majority of the property bounded within the seawall area has been characterized; however, the shoreline sediments located immediately west-adjacent of the seawall have not been properly delineated. Identifying the bounds of the site to the west within sediment is pivotal for the purposes of the remedial investigation. Since the west-adjacent shoreline is so extensive, conducting a complete sediment sampling event along the entire shoreline would be cost-prohibitive due to analytical costs and logistical issues at the property. Because of the extensive nature of the shoreline, it would greatly benefit the client and project to focus sampling efforts at areas of greater risk for contaminants along the shoreline by identifying potential preferential pathways for contaminants to migrate off of the property and into adjacent shoreline sediments. The review of historical studies of the property yielded some useful information; however much of the findings included within the historical studies were lacking original raw data, therefore limiting the information obtained. The calculated hydraulic balance for the property yielded a relatively large surplus of recharge to groundwater after precipitation events, reinforcing the concept that contaminant have potentially historically, and currently, been migrating into the adjacent shoreline through preferential pathways along the seawall. Due to the limitation within the historical studies for the property as well as the groundwater recharge identified in the hydraulic balance, an additional study was proposed in an effort to provide additional aquifer characteristics along the seawall, and the ability to observe flow propagation at and proximate to the seawall in two-dimensions through time without the need to piece separate studies together. This proposed study includes a single simultaneous tidal study which comprises select monitoring points along the seawall. This report has identified the need for additional data that can be collected through available avenues for the property based upon the client’s desires and project needs. Ultimately, the proposed additional study is suggested based upon its relatively low capital investment, and ability meet the requirements relevant to the specific project needs and scope. Assuming preferential pathways are identified through the additional study proposed within this report, a representative and cost-effective sediment sampling plan can then be put in place in an effort to define the site.