2 resultados para Abutment screw fracture

em University of Washington


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Understanding flow path connectivity within a geothermal reservoir is a critical component for efficiently producing sustained flow rates of hot fluids from the subsurface. I present a new approach for characterizing subsurface fracture connectivity that combines petrographic and cold cathodoluminescence (CL) microscopy with stable isotope analysis (δ18O and δ13C) and clumped isotope (Δ47) thermometry of fracture-filling calcite cements from a geothermal reservoir in northern Nevada. Calcite cement samples were derived from both drill cuttings and core samples taken at various depths from wells within the geothermal field. CL microscopy of some fracture filling cements shows banding parallel to the fracture walls as well as brecciation, indicating that the cements are related to fracture opening and fault slip. Variations in trace element composition indicated by the luminescence patterns reflect variations in the composition and source of fluids moving through the fractures as they opened episodically. Calcite δ13C and δ18O results also show significant variation among the sampled cements, reflecting multiple generations of fluids and fracture connectivity. Clumped isotope analyses performed on a subset of the cements analyzed for conventional δ18O and δ13C mostly show calcite growth temperatures around 150°C—above the current ambient rock temperature, which indicates a common temperature trend for the geothermal reservoir. However, calcite cements sampled along faults located within the well field showed both cold (18.7°C) and hot (226.1°C) temperatures. The anomalously cool temperature found along the fault, using estimates from clumped isotope thermometry, suggests a possible connection to surface waters for the geothermal source fluids for this system. This information may indicate that some of the faults within the well field are transporting meteoric water from the surface to be heated at depth, which then is circulated through a complex network of fractures and other faults.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report summarizes the data, observations, methods, assumptions, and decisions for the design of the Relief Well Rehabilitation Project in the Right Abutment Drainage Tunnel at Chief Joseph Dam. Chief Joseph Dam (CJD) is a dam on the Columbia River and is owned and operated by the U.S. Army Corps of Engineers (USACE). It is the second only to Grand Coulee dam as the largest producer of hydropower in the United States. The right abutment drainage tunnel contains wooden stave relief wells. Water flows from these wells which reduces the hydrostatic pressure in the right abutment of the dam. The 22 wells in the floor of the tunnel are 60 years old and are in need of rehabilitation. The objective of this project is to control the groundwater gradient, prevent the movement of sediment, stop total screen collapse, and prevent initiation of backwards erosion and piping in the abutment. The rehabilitation solution is to install new stainless steel screens into the existing wells, backfill the annular space between the old wooden screen and the new stainless steel screens with a 3/8-inch pea gravel filter pack, and install a new top cap to hold the new screen in place. This report documents the data, observations, and methods used to complete the final design. During tunnel inspections USACE geologists observed dislodged end plugs and evidence of sediment movement out of the formation. The relief wells have historically high flows between 6,000 gallons per minute (gpm) to 9,000 gpm. New screens are designed based on as-built data and historic tunnel flow. The new screens are 8-in diameter, 100 slot (0.10-inch) screens. We found that screen diameter and slot size would provide adequate transmitting capacity for most of the relief wells. The filter pack gradation is based on descriptions from foundation construction reports. I found that 3/8-inch pea gravel is appropriate for the abutment material. During design, I also considered an option to install the screens into the relief wells without filter pack. I eliminated this option because it did not meet our rehabilitation objective to prevent total failure of the wooden screens.