69 resultados para town planning
em University of Queensland eSpace - Australia
Resumo:
The 'greater city' movement in the 1920s in Australia was profoundly influenced by the growing town planning movement of the time. Brisbane was the only major metropolitan city in which local government amalgamations occurred, leading to a 'greater Brisbane' in 1925. The paper tries to identify reasons why, despite the close connection between the greater city movement and the early town planning movement, there was no formal town plan in place in Brisbane until 1965.
Resumo:
This paper investigates how demographic (socioeconomic) and land-use (physical and environmental) data can be integrated within a decision support framework to formulate and evaluate land-use planning scenarios. A case-study approach is undertaken with land-use planning scenarios for a rapidly growing coastal area in Australia, the Shire of Hervey Bay. The town and surrounding area require careful planning of the future urban growth between competing land uses. Three potential urban growth scenarios are put forth to address this issue. Scenario A ('continued growth') is based on existing socioeconomic trends. Scenario B ('maximising rates base') is derived using optimisation modelling of land-valuation data. Scenario C ('sustainable development') is derived using a number of social, economic, and environmental factors and assigning weightings of importance to each factor using a multiple criteria analysis approach. The land-use planning scenarios are presented through the use of maps and tables within a geographical information system, which delineate future possible land-use allocations up until 2021. The planning scenarios are evaluated by using a goal-achievement matrix approach. The matrix is constructed with a number of criteria derived from key policy objectives outlined in the regional growth management framework and town planning schemes. The authors of this paper examine the final efficiency scores calculated for each of the three planning scenarios and discuss the advantages and disadvantages of the three land-use modelling approaches used to formulate the final scenarios.
Resumo:
Romeo Watkins Lahey (1887-1968) was a distinguished Queensland engineer. He graduated in engineering from the University of Sydney in 1914 and served in World War I from 1915 to 1918 with The Royal Australian Engineers. Following the war, he accepted an offer to remain for a period in England and studied town planning at the University of London. He visited Europe and collected a remarkable set of historic bridge photographs. In the course of this visit, he met Paul Sejourne, a distinguished French bridge engineer, the designer of at Ieast one of the bridges (at Fontpedrouse, pages 25-27) included in this set. When Lahey died, his wife Sybil and daughter Ann took steps to give this remarkable set of 58 historic bridge photographs to The University of Queensland. More recently, Lahey's daughters Ann Neale and Alison Drake have given a set of lantern plates collected by their father, many of which also have photographs of bridges. This volume is divided into three parts: (a) a biography of Romeo Watkins Lahey, written by his daughter, Ann Neale; (b) copies of the original set of 58 bridge photographs, and (c) copies taken from 32 lantern plates. To these have been added captions. Many of the original photographs carried titles; where these are available they have been printed in italics. Further work has been done to identify bridges and where possible the captions include the completion date, major dimensions, locations, and references to published works. Plates 8.1-10 are copies of drawings used as Figures in a book. These drawings have not been copied and the source has not been identified. Two lists of photographs and plates are included - the first in the order of the original collections and a second with bridges listed in the order of material, structural form and date. The collection is of remarkable value to any bridge historian, and is recommended for study by students.
Resumo:
Objectives: To establish the prevalence and predictors of genital warts among healthy women presenting for contraceptive advice at two family planning clinics, one in a major Australian city and one in a country town in the same state. Methods: Consecutive consenting attendees (n = 1218)at two family planning clinics in Queensland completed a questionnaire and were examined for genital warts. Results: The point prevalence of visible genital warts was 3.3 per cent in the city clinic and 14.4 per cent in the country town. For half of these clients a finding of warts was unexpected, in that the client was unaware of their presence and presentation to the family planning clinic was not specifically for advice about sexually transmitted infections. The major predictor of a finding of warts was client age, with the highest prevalence in 20- to 25-year-olds. Warts were also commoner amongst smokers in the country town but not in Brisbane. However, no analysed sociodemographic variable predicted a finding of warts of which the client was not aware. Conclusions: Genital warts are common among young women presenting for contraceptive advice. Such women are often unaware that they have warts. Examination for genital warts should be a part of any routine examination of sexually active women, and medical practitioners should be aware of appropriate advice for patients who are found to have genital warts on routine examination.
Resumo:
Market-based transmission expansion planning gives information to investors on where is the most cost efficient place to invest and brings benefits to those who invest in this grid. However, both market issue and power system adequacy problems are system planers’ concern. In this paper, a hybrid probabilistic criterion of Expected Economical Loss (EEL) is proposed as an index to evaluate the systems’ overall expected economical losses during system operation in a competitive market. It stands on both investors’ and planner’s point of view and will further improves the traditional reliability cost. By applying EEL, it is possible for system planners to obtain a clear idea regarding the transmission network’s bottleneck and the amount of losses arises from this weak point. Sequentially, it enables planners to assess the worth of providing reliable services. Also, the EEL will contain valuable information for moneymen to undertake their investment. This index could truly reflect the random behaviors of power systems and uncertainties from electricity market. The performance of the EEL index is enhanced by applying Normalized Coefficient of Probability (NCP), so it can be utilized in large real power systems. A numerical example is carried out on IEEE Reliability Test System (RTS), which will show how the EEL can predict the current system bottleneck under future operational conditions and how to use EEL as one of planning objectives to determine future optimal plans. A well-known simulation method, Monte Carlo simulation, is employed to achieve the probabilistic characteristic of electricity market and Genetic Algorithms (GAs) is used as a multi-objective optimization tool.
Resumo:
My involvement with Aboriginal people began in 1972 in my final year of architecture, when a small group of students were asked to advise on some Aboriginal building projects in Mt Isa and Cloncurry. This led to my Doctoral research and grew into the Aboriginal Environments Research Centre now well established at the university of Queensland. Although the personnel of this Centre have completed over 140 field trips in the last 20 years, it is a set of data collected largely from the first ten field trips in 1972-76 that will be presented in this paper.
Resumo:
The reconstruction of power industries has brought fundamental changes to both power system operation and planning. This paper presents a new planning method using multi-objective optimization (MOOP) technique, as well as human knowledge, to expand the transmission network in open access schemes. The method starts with a candidate pool of feasible expansion plans. Consequent selection of the best candidates is carried out through a MOOP approach, of which multiple objectives are tackled simultaneously, aiming at integrating the market operation and planning as one unified process in context of deregulated system. Human knowledge has been applied in both stages to ensure the selection with practical engineering and management concerns. The expansion plan from MOOP is assessed by reliability criteria before it is finalized. The proposed method has been tested with the IEEE 14-bus system and relevant analyses and discussions have been presented.
Resumo:
A framework for and overview of the key elements of language planning is presented covering status planning, corpus planning, language-in-education planning, prestige planning and critical approaches to language planning. Within each of these areas, key articles outlining important recent directions are discussed indicating the field’s new found sense of vitality.
Resumo:
Objective: To demonstrate the potential of GIS (geographic information system) technology and ARIA (Accessibility/Remoteness Index for Australia) as tools for medical workforce and health service planning in Australia. Design: ARIA is an index of remoteness derived by measuring road distance between populated localities and service centres. A continuous variable of remoteness from 0 to 12 is generated for any location in Australia. We created a GIS, with data on location of general practitioner services in non-metropolitan South Australia derived from the database of HUMPS (Rural Undergraduate Medical Placement System), and estimated, for the 1170 populated localities in South Australia, the accessibility/inaccessibility of the 109 identified GP services. Main outcome measures: Distance from populated locality to GP services. Results: Distance from populated locality to GP service ranged from 0 to 677 km (mean, 58 km). In all, 513 localities (43%) had a GP service within 20 km (for the majority this meant located within the town). However, for 173 populated localities (15%), the nearest GP service was more than 80 km away. There was a strong correlation between distance to GP service and ARIA value for each locality (0.69; P<0.05). Conclusions: GP services are relatively inaccessible to many rural South Australian communities. There is potential for GIS and for ARIA to contribute to rational medical workforce and health service planning. Adding measures of health need and more detailed data on types and extent of GP services provided will allow more sophisticated planning.