48 resultados para quality improvement initiatives

em University of Queensland eSpace - Australia


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Quality measurement and benchmarking in aged cave presents several challenges. A model which addresses this by linking four dimensions of outcomes has been developed - the Clinical Value Compass (CVC). A CVC was developed for stroke rehabilitation and measured across four sites. The CVC teas well accepted by the treatment teams and proved practical to measure. The results revealed differences in practices and client groups that led to a closer analysis of process and subsequent changes in these processes. Remeasuring of the CVC is required to demonstrate improved outcomes arising from these process changes.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Objective: To evaluate changes in quality of in-hospital care of patients with either acute coronary syndromes (ACS) or congestive heart failure (CHF) admitted to hospitals participating in a multisite quality improvement collaboration. Design: Before-and-after study of changes in quality indicators measured on representative patient samples between June 2001 and January 2003. Setting: Nine public hospitals in Queensland. Study populations: Consecutive or randomly selected patients admitted to study hospitals during the baseline period (June 2001 to January 2002; n = 807 for ACS, n = 357 for CHF) and post-intervention period (July 2002 to January 2003; n = 717 for ACS, n = 220 for CHF). Intervention: Provision of comparative baseline feedback at a facilitative workshop combined with hospital-specific quality-improvement interventions supported by on-site quality officers and a central program management group. Main outcome measure: Changes in process-of-care indicators between baseline and post-intervention periods. Results: Compared with baseline, more patients with ACS in the post-intervention period received therapeutic heparin regimens (84% v 72%; P < 0.001), angiotensin-converting enzyme inhibitors (64% v 56%; P = 0.02), lipid-lowering agents (72% v 62%; P < 0.001), early use of coronary angiography (52% v 39%; P < 0.001), in-hospital cardiac counselling (65% v 43%; P < 0.001), and referral to cardiac rehabilitation (15% v 5%; P < 0.001). The numbers of patients with CHF receiving β-blockers also increased (52% v 34%; P < 0.001), with fewer patients receiving deleterious agents (13% v 23%; P = 0.04). Same-cause 30-day readmission rate decreased from 7.2% to 2.4% (P = 0.02) in patients with CHF. Conclusion: Quality-improvement interventions conducted as multisite collaborations may improve in-hospital care of acute cardiac conditions within relatively short time frames.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Rationale. The Brisbane Cardiac Consortium, a quality improvement collaboration of clinicians from three hospitals and five divisions of general practice, developed and reported clinical indicators as measures of the quality of care received by patients with acute coronary syndromes or congestive heart failure. Development of indicators. An expert panel derived indicators that measured gaps between evidence and practice. Data collected from hospital records and general practice heart-check forms were used to calculate process and outcome indicators for each condition. Our indicators were reliable (kappa scores 0.7-1.0) and widely accepted by clinicians as having face validity. Independent review of indicator-failed, in-hospital cases revealed that, for 27 of 28 process indicators, clinically legitimate reasons for withholding specific interventions were found in

Relevância:

100.00% 100.00%

Publicador:

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Although managers consider accurate, timely, and relevant information as critical to the quality of their decisions, evidence of large variations in data quality abounds. Over a period of twelve months, the action research project reported herein attempted to investigate and track data quality initiatives undertaken by the participating organisation. The investigation focused on two types of errors: transaction input errors and processing errors. Whenever the action research initiative identified non-trivial errors, the participating organisation introduced actions to correct the errors and prevent similar errors in the future. Data quality metrics were taken quarterly to measure improvements resulting from the activities undertaken during the action research project. The action research project results indicated that for a mission-critical database to ensure and maintain data quality, commitment to continuous data quality improvement is necessary. Also, communication among all stakeholders is required to ensure common understanding of data quality improvement goals. The action research project found that to further substantially improve data quality, structural changes within the organisation and to the information systems are sometimes necessary. The major goal of the action research study is to increase the level of data quality awareness within all organisations and to motivate them to examine the importance of achieving and maintaining high-quality data.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Background: Measurement and improvement of quality of care is a priority issue in health care. Patients hospitalized with acute coronary syndromes (ACS) constitute a high-risk population whose care, if shown to be suboptimal on the basis of available research evidence, may benefit from quality improvement interventions. Aim: To evaluate the quality of in-hospital care for patients with ACS, using explicit quality indicators. Methods: Retrospective case note review was undertaken of 397 patients admitted to three teaching hospitals in Brisbane, Queensland, Australia, between 1 October 2000 and 17 April 2001. The main out-come measures were 12 process-of-care quality indicators, calculated as either: (i) the proportion of all patients who received specific interventions or (ii) the proportion of ideal patients who received -specific interventions (i.e. patients with clear indi-cations and lacking contraindications). Results: Quality indicators with values above 80% included: (i) patient selection for thrombolysis (100%) and discharge prescription of beta-blockers (84%), (ii) antiplatelet agents (94%) and (iii) lipid-lowering agents (82%). Indicators with values between 50% and 80% included: (i) timely per-formance of electrocardiogram (ECG) on admission (61%), (ii) early coronary angiography (75%), (iii) measurement of serum lipids (71%) and (iv) discharge prescription of angiotensin-converting-enzyme (ACE) inhibitors (73%). Indicators with values <50% included: (i) timely administration of thrombolysis (35%), (ii) non-invasive risk assessment (23%) and (ii) formal in-hospital and post-hospital cardiac rehabilitation (47% and 7%, respectively). Conclusion: There were delays in performing ECG and administering thrombolysis to patients who presented to emergency departments with ACS. Improvement is warranted in use of non-invasive procedures for identifying high-risk patients who may benefit from coronary revascularization as well as use of serum lipid measurements, ACE inhibitors and cardiac rehabilitation.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Many maintenance managers find it difficult to justify investments in maintenance improvement initiatives. In part, this is due to a tendency by mine managers to regard maintenance purely as a cost centre, and not as a process able to influence productive capacity and profit. It is also hindered by a lack of alignment between commonly used maintenance performance measures and key business drivers, and the lack of formal business training amongst maintenance professionals. With this in mind, a model to assist maintenance managers in evaluating the benefits of maintenance improvement projects was recently formulated. The model considers four cost saving dimensions. These are: 1. reduction in the cost of unplanned repairs and maintenance, 2. increased or accelerated production and/or sales, 3. spares inventory reduction, and 4. reduction in over-investment in physical assets and operating costs. This paper discusses the application of this model and a number of numerical examples are given to justify investments in maintenance improvement projects having varying objectives.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Engineering This investigation examined the rheological (viscosity and yield stress) and material property (density) characteristics of the thickened meal-time and videofluorscopy fluids provided by 10 major metropolitan hospitals. Differences in the thickness of thickened fluids were considered as a source of variability and potential hazard for inter-hospital transfers of dysphagic patients. The results indicated considerable differences in the viscosity, density, and yield stress of both meal-time and videofluoroscopy fluids. In theory, the results suggest that dysphagic patients transferred between hospitals could be placed on inappropriate levels of fluid thickness because of inherent differences in the rheology and material property characteristics of the fluids provided by different hospitals. Slowed improvement or medical complications are potential worst-case scenarios for dysphagic patients if the difference between the thick fluids offered by 2 hospitals are extreme. The investigation outlines the most appropriate way to assess the rheological and material property characteristics of thickened fluids. In addition, it suggests a plan of quality improvement to reduce the variability of the thickness of fluids offered at different hospitals.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

In patients hospitalised with acute coronary syndromes (ACS) and congestive heart failure (CHF), evidence suggests opportunities for improving in-hospital and after hospital care, patient self-care, and hospital-community integration. A multidisciplinary quality improvement program was designed and instigated in Brisbane in October 2000 involving 250 clinicians at three teaching hospitals, 1080 general practitioners (GPs) from five Divisions of General Practice, 1594 patients with ACS and 904 patients with CHF. Quality improvement interventions were implemented over 17 months after a 6-month baseline period and included: clinical decision support (clinical practice guidelines, reminders, checklists, clinical pathways); educational interventions (seminars, academic detailing); regular performance feedback; patient self-management strategies; and hospital-community integration (discharge referral summaries; community pharmacist liaison; patient prompts to attend GPs). Using a before-after study design to assess program impact, significantly more program patients compared with historical controls received: ACS: Angiotensin-converting enzyme (ACE) inhibitors and lipid-lowering agents at discharge, aspirin and beta-blockers at 3 months after discharge, inpatient cardiac counselling, and referral to outpatient cardiac rehabilitation. CHF. Assessment for reversible precipitants, use of prophylaxis for deep-venous thrombosis, beta-blockers at discharge, ACE inhibitors at 6 months after discharge, imaging of left ventricular function, and optimal management of blood pressure levels. Risk-adjusted mortality rates at 6 and 12 months decreased, respectively, from 9.8% to 7.4% (P=0.06) and from 13.4% to 10.1% (P= 0.06) for patients with ACS and from 22.8% to 15.2% (P < 0.001) and from 32.8% to 22.4% (P= 0.005) for patients with CHF. Quality improvement programs that feature multifaceted interventions across the continuum of care can change clinical culture, optimise care and improve clinical outcomes.