3 resultados para VAT revenues

em University of Queensland eSpace - Australia


Relevância:

10.00% 10.00%

Publicador:

Resumo:

The textures of yogurt made from ultra-high temperature (UHT) treated and conventionally treated milks at high total solids were investigated. The yogurt premixes, fortified with low-heat skim milk powder to 16%, 18%, and 20% total solids, were UHT processed at 143 degreesC for 6 s and heated at 85 degreesC for 30 min using the conventional method. The onset of gelation was delayed in the UHT-processed milk compared with conventionally heated milk. During fermentation, the viscosity of yogurt made, from UHT-treated milk at 20% total solids was close to that of yogurt made from conventionally treated milk with 16% total solids. However, after storage for greater than or equal to1 d, the yogurt made from UHT-treated milk had lower viscosity and gel strength than the yogurt made from conventionally treated milk. The solids level had no influence on yogurt culture growth.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

A modern mineral processing plant represents a substantial investment. During the design process, there is often a period when costs (or revenues) must be compensated for by cuts in capital expenditure. In many cases, sampling and measurement equipment provides a soft target for such 'savings'. This process is almost analgous to reducing the capital investment in a corner store by not including a cash register. The consequences will be quite similar - a serious lack of sound performance data and plenty of opportunities for theft - deliberate or inadvertent. This paper makes the case that investment in sampling and measurement equipment is more cost-effective during the design phase. Further, a strong measurement culture will have many benefits including the ability to take advantage of small gains. In almost any business, there are many more opportunities to make small gains than to make large, step changes. In short, if a project cannot justify the cost of accurate and reliable measurement of its performance, it probably should not be a project at all.