37 resultados para Saint-Office
em University of Queensland eSpace - Australia
Resumo:
The "Pointe Saint Mathieu" is one of the most westerly continental landmarks of France. The promontory is located at the entrance of the "Goulet de la Rade de Brest", that is the entrance channel of the harbour of Brest in Brittany (France). It marks also the Southern end of the "Chenal du Four" that is the main navigation channel between the islands of Ouessant, Molène and Béniquet, and Brittany. The "Chenal du Four" is reputed for its dangers. The tidal range is greater than 7 m in spring tides, and the mid-tide current may exceed 5 knots. The Saint Mathieu promontory is equipped with a lighthouse and a semaphore. The former is located in the ruins of an old monastery, founded during the 6th century AD by Saint Tanguy. The present ruins are the remnants of buildings from the 11th to 15th centuries. The first lighthouse was installed in 1689, although the monks of the monastery used to maintain a signal light since the 1250s. Completed in 1835, the present "Phare de la Pointe Saint-Mathieu" is 37 m high and it reaches 58.8 m above sea level During World War 2, the Pointe Saint Mathieu was defended by a series of concrete fortifications built by the Germans. Some were based upon some earlier French bunker systems, like the coastal battery at the Rospects which included 4 main gun bunkers (4*150 mm, or 2*150 mm & 2*105 mm), an observation bunker on the Western side close to sea, and several smaller structures. There was also the large Kéringar Blockhaus system, near Lochrist, located about 1 km inland and designed for 4 guns of 280 mm. Its command bunker remains a landmark along the main road. All this area was very-heavily bombed between 1943 and 1944, and particularly during the battle of Brest in August-September 1944 ("L'Enfer de Brest").
Resumo:
Group of people outside the Sub Inspector Office during visit of former South Vietnamese vice president Nguyen Cao Ky to Brisbane, Australia in January 1967.
Resumo:
As seen from adjacent street corner.
Resumo:
As seen from road.
Resumo:
As seen from adjacent block.
Resumo:
View of exterior wall to warehouse.
Resumo:
Detailed view of downpipes and drainage grill.
Resumo:
View past tiered amphitheatre and offices above to air strip beyond.
Resumo:
View past timber blinds to balcony and timber sunscreens.
Resumo:
View of post being hoisted into position during construction.
Resumo:
View of warehouse exterior.
Resumo:
Detailed view of poles used in construction. Poles were spliced in their length with steel bars (like 3 pin plugs) and these joints were restrained from splitting with steel strap belts. The belts were tightened with opposing wedges like the old Greene & Greene wrought iron detail.
Resumo:
View of warehouse exterior.