13 resultados para Project evaluation - economic aspects

em University of Queensland eSpace - Australia


Relevância:

100.00% 100.00%

Publicador:

Resumo:

A methodological framework for conducting a systematic, mostly qualitative, meta-synthesis of community-based rehabilitation (CBR) project evaluation reports is described. Developed in the course of an international pilot study, the framework proposes a systematic review process in phases which are strongly collaborative, methodologically rigorous and detailed. Through this suggested process, valuable descriptive data about CBR practice, strategies and outcomes may be synthesized. It is anticipated that future application of this methodology will contribute to an improved evidence base for CBR, which will facilitate the development of more appropriate policy and practice guidelines for disability service delivery in developing countries. The methodology will also have potential applications in areas beyond CBR, which are similarly. evidence poor' (lacking empirical research) but 'data rich' (with plentiful descriptive and evaluative reports).

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The aim of this paper was to consider the impact on psychologists of one component of the Australian Government's Better Outcomes in Mental Health Care (BOiMHC) program, namely the Access to Allied Psychological Services (ATAPS) component. This supports psychologists and general practitioners (GPs) to work together to provide optimal mental health care, via 102 projects being conducted by Divisions of General Practice. The paper was informed by data from five sources: a project-based minimum dataset; local project evaluation reports; a forum; a survey of projects: and a survey of Australian Psychological Society (APS) members. Taken together, the data from these sources showed that a significant number of psychologists are providing services through the projects, and the majority are finding it a positive and professionally rewarding experience. There is considerable variability regarding models of retaining, locating and referring to psychologists, and there are pros and cons associated with each. The major problem identified by psychologists is the level of remuneration. BOiMHC is currently moving into a new phase of continuation and expansion, and consideration was given to whether the data point to any changes that could be made to the ATAPS projects during this period of transition. In the main, the data suggest that the status quo should be retained, but the issue of remuneration must be addressed.

Relevância:

50.00% 50.00%

Publicador:

Resumo:

Like any other natural resources, hydro resources that are capable of generating electricity at cheaper cost give rise to economic rent. Nepal possesses huge amount of such cheaper hydro resources which is far in excess of the domestic demand. The existing rents levied by the governments are not found to address the potential value of resources. In this study hydro rent is calculated for two types of hydropower projects: (i) domestic demand oriented project and (ii) large and export oriented project. In doing so, the study uses the concept of hydro rent as a measure of cost savings achievable by the use of hydro resources over the least cost alternatives. The WASP-III+ optimisation software developed by IAEA has been used to derive two least cost generation expansion plans i.e. one with and the other without the nominated hydro resource. The difference in the costs of two plans gives the rent of the hydro resource.