78 resultados para Plumbing equipment industry
em University of Queensland eSpace - Australia
Resumo:
Work-related falls continues to be one of the leading causes of fatalities in the Australian construction industry, and the failure to use fall protection equipment, such as fall-arrest harnesses and arresting devices, has been found to be a contributing factor. In an attempt to gain an understanding of the issues surrounding the use of fallarrest harness systems by construction workers a study involving semi-structured interviews of 15 male construction workers was carried out at three construction sites. The majority of interviewees commented that there was discomfort in wearing a fall-arrest harness; that there were a number of problems when anchored via an arresting device; and that using a fall-arrest system reduced productivity. Most of the interviewees considered that they needed safety precautions against falls, and they expressed the view that workers’ attitudes towards safety depended critically upon their supervisors’ attitude towards safety. It was also found that workers were not trained in rescue procedures. Interviewees expressed concern that retrieval of a suspended worker may not be carried out in time to prevent the onset of suspension trauma. A number of issues were identified which require further research, such as, investigation into suspension trauma, harness and arresting device design, training provided to workers, and the provision for rescues.
Resumo:
For leased equipment the lessor incurs penalty costs for failures occurring over the lease period and for not rectifying such failures within a specified time limit. Through preventive maintenance actions the penalty costs can be reduced but this is achieved at the expense of increased maintenance costs. The paper looks at a periodic preventive maintenance policy which achieves a tradeoff between the penalty and maintenance costs. (c) 2005 Elsevier Ltd. All rights reserved.
Resumo:
For leased equipment, the lessor carries out the maintenance of the equipment. Usually, the contract of lease specifies the penalty for equipment failures and for repairs not being carried out within specified time limits. This implies that optimal preventive maintenance policies must take these penalty costs into account and properly traded against the cost of preventive maintenance actions. The costs associated with failures are high as unplanned corrective maintenance actions are costly and the resulting penalties due to lease contract terms being violated. The paper develops a model to determine the optimal parameters of a preventive maintenance policy that takes into account all these costs to minimize the total expected cost to the lessor for new item lease. The parameters of the policy are (i) the number of preventive maintenance actions to be carried out over the lease period, (ii) the time instants for such actions, and (iii) the level of action. (c) 2005 Elsevier B.V. All rights reserved.
Resumo:
Abstract: Purpose – The aim of this research is to determine the optimal upgrade and preventive maintenance actions that minimize the total expected cost (maintenance costs+penalty costs). Design/methodology/approach – The problem is a four-parameter optimization with two parameters being k-dimensional. The optimal solution is obtained by using a four-stage approach where at each stage a one-parameter optimization is solved. Findings – Upgrading action is an extra option before the lease of used equipment, in addition to preventive maintenance action. Upgrading action makes equipment younger and preventive maintenance action lowers the ROCOF. Practical implications – There is a growing trend towards leasing equipment rather than owning it. The lease contract contains penalties if the equipment fails often and repairs are done within reasonable time period. This implies that the lessor needs to look at optimal preventive maintenance strategies in the case of new equipment lease, and upgrade actions plus preventive maintenance in the case of used equipment lease. The paper deals with this topic and is of great significant to business involved with leasing equipment. Originality/value – Nowadays many organizations are interested in leasing equipment and outsourcing maintenance. The model in this paper addresses the preventive maintenance problem for leased equipment. It provides an approach to dealing with this problem.
Resumo:
View of exterior wall to warehouse.
Resumo:
Detailed view of downpipes and drainage grill.
Resumo:
View past tiered amphitheatre and offices above to air strip beyond.
Resumo:
View past timber blinds to balcony and timber sunscreens.
Resumo:
View of post being hoisted into position during construction.
Resumo:
View of warehouse exterior.
Resumo:
Detailed view of poles used in construction. Poles were spliced in their length with steel bars (like 3 pin plugs) and these joints were restrained from splitting with steel strap belts. The belts were tightened with opposing wedges like the old Greene & Greene wrought iron detail.
Resumo:
View of warehouse exterior.
Resumo:
View to underside of roof with steel beam and insulation.
Resumo:
Detailed view of cast iron brackets connecting beams and posts.