15 resultados para Pfair scheduling

em University of Queensland eSpace - Australia


Relevância:

20.00% 20.00%

Publicador:

Resumo:

In electronic support, receivers must maintain surveillance over the very wide portion of the electromagnetic spectrum in which threat emitters operate. A common approach is to use a receiver with a relatively narrow bandwidth that sweeps its centre frequency over the threat bandwidth to search for emitters. The sequence and timing of changes in the centre frequency constitute a search strategy. The search can be expedited, if there is intelligence about the operational parameters of the emitters that are likely to be found. However, it can happen that the intelligence is deficient, untrustworthy or absent. In this case, what is the best search strategy to use? A random search strategy based on a continuous-time Markov chain (CTMC) is proposed. When the search is conducted for emitters with a periodic scan, it is shown that there is an optimal configuration for the CTMC. It is optimal in the sense that the expected time to intercept an emitter approaches linearity most quickly with respect to the emitter's scan period. A fast and smooth approach to linearity is important, as other strategies can exhibit considerable and abrupt variations in the intercept time as a function of scan period. In theory and numerical examples, the optimum CTMC strategy is compared with other strategies to demonstrate its superior properties.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper presents a new multi-depot combined vehicle and crew scheduling algorithm, and uses it, in conjunction with a heuristic vehicle routing algorithm, to solve the intra-city mail distribution problem faced by Australia Post. First we describe the Australia Post mail distribution problem and outline the heuristic vehicle routing algorithm used to find vehicle routes. We present a new multi-depot combined vehicle and crew scheduling algorithm based on set covering with column generation. The paper concludes with a computational investigation examining the affect of different types of vehicle routing solutions on the vehicle and crew scheduling solution, comparing the different levels of integration possible with the new vehicle and crew scheduling algorithm and comparing the results of sequential versus simultaneous vehicle and crew scheduling, using real life data for Australia Post distribution networks.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper describes an experiment in designing, implementing and testing a Transport layer cluster scheduling and dispatching architecture. The motivation for the experiment was the hypothesis that a Transport layer clustering solution may offer advantantages over the existing industry-standard Network layer and Data Link Layer approaches. The critical success factors initially established to guide and evaluate the experiment were reduced dispatcher work load, reduced dispatcher internal state memory requirements, distributed denial of service resilience, and cluster software design simplicity. The functional design stage of the experiment produced a Transport layer strategy for scheduling and load balancing based on the specification of two new TCP options. Implementation required the introduction of the newly specified TCP options into the Linux (2.4) kernel. The implementation produced an extended Linux Socket API to facilitate user-process access to the additional TCP capability. The testing stage of the experiment confirmed the operational efficiency of the solution.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In Electronic Support, it is well known that periodic search strategies for swept-frequency superheterodyne receivers (SHRs) can cause synchronisation with the radar it seeks to detect. Synchronisation occurs when the periods governing the search strategies of the SHR and radar are commensurate. The result may be that the radar is never detected. This paper considers the synchronisation problem in depth. We find that there are usually a finite number of synchronisation ratios between the radar’s scan period and the SHR’s sweep period. We develop three geometric constructions by which these ratios can be found and we relate them to the Farey series. The ratios may be used to determine the intercept time for any combination of scan and sweep period. This theory can assist the operator of an SHR in selecting a sweep period that minimises the intercept time against a number of radars in a threat emitter list.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Investment in mining projects, like most business investment, is susceptible to risk and uncertainty. The ability to effectively identify, assess and manage risk may enable strategic investments to be sheltered and operations to perform closer to their potential. In mining, geological uncertainty is seen as the major contributor to not meeting project expectations. The need to assess and manage geological risk for project valuation and decision-making translates to the need to assess and manage risk in any pertinent parameter of open pit design and production scheduling. This is achieved by taking geological uncertainty into account in the mine optimisation process. This thesis develops methods that enable geological uncertainty to be effectively modelled and the resulting risk in long-term production scheduling to be quantified and managed. One of the main accomplishments of this thesis is the development of a new, risk-based method for the optimisation of long-term production scheduling. In addition to maximising economic returns, the new method minimises the risk of deviating from production forecasts, given the understanding of the orebody. This ability represents a major advance in the risk management of open pit mining.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The present study examined the effects of work control and job demands on employee adjustment and work performance using a multidimensional measure of work control (assessing levels of task control, decision control and work scheduling control). It was proposed that the negative effects of job demands and employee adjustment would be moderated by high levels of task control. It was also proposed that there would be evidence of main effects of both job demands and work control (particularly task-related levels of control) on employee adjustment. To test these predictions, a study of 135 university employees holding administrative positions was undertaken. Methodological improvements over previous research included the use of both self-reported adjustment measures and supervisor ratings of work performance as outcome variables, and the assessment of the predictor and outcome measures at different points in time (self-reported adjustment was assessed at both Times 1 and 2). The results revealed some support for the proposal that the effects of job demands would be buffered by high levels of task control, but not more peripheral aspects of work control. There were also significant main effects of task control on job satisfaction.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This paper seeks to understand how software systems and organisations co-evolve in practice and how order emerges in the overall environment. Using a metaphor of timetable as a commons, we analyse the introduction of a novel academic scheduling system to demonstrate how Complex Adaptive Systems theory provides insight into the adaptive behaviour of the various actors and how their action is both a response to and a driver of co-evolution within the engagement.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Leaf water potential (psi (l)) represents a good indicator of the water status of plants, and continuous monitoring of it can be useful in research and field applications such as scheduling irrigation. Changes in stem diameter (Sd) were used for monitoring psi (l) of pot-grown sorghum [Sorghum bicolor (L.) Moench] plants in a glasshouse. This method requires occasional calibration of S-d values against psi (l). Predicted values of psi (l), based on a single calibration show a good correlation with measured psi (l), values over a period of 13 d before and after the calibration. The correlation can further be improved with shorter time intervals.