4 resultados para Periodic Preventive Maintenance
em University of Queensland eSpace - Australia
Resumo:
For leased equipment the lessor incurs penalty costs for failures occurring over the lease period and for not rectifying such failures within a specified time limit. Through preventive maintenance actions the penalty costs can be reduced but this is achieved at the expense of increased maintenance costs. The paper looks at a periodic preventive maintenance policy which achieves a tradeoff between the penalty and maintenance costs. (c) 2005 Elsevier Ltd. All rights reserved.
Resumo:
Preventive maintenance actions over the warranty period have an impact on the warranty servicing cost to the manufacturer and the cost to the buyer of fixing failures over the life of the product after the warranty expires. However, preventive maintenance costs money and is worthwhile only when these costs exceed the reduction in other costs. The paper deals with a model to determine when preventive maintenance actions (which rejuvenate the unit) carried out at discrete time instants over the warranty period are worthwhile. The cost of preventive maintenance is borne by the buyer. (C) 2003 Elsevier Ltd. All rights reserved.
Resumo:
For leased equipment, the lessor carries out the maintenance of the equipment. Usually, the contract of lease specifies the penalty for equipment failures and for repairs not being carried out within specified time limits. This implies that optimal preventive maintenance policies must take these penalty costs into account and properly traded against the cost of preventive maintenance actions. The costs associated with failures are high as unplanned corrective maintenance actions are costly and the resulting penalties due to lease contract terms being violated. The paper develops a model to determine the optimal parameters of a preventive maintenance policy that takes into account all these costs to minimize the total expected cost to the lessor for new item lease. The parameters of the policy are (i) the number of preventive maintenance actions to be carried out over the lease period, (ii) the time instants for such actions, and (iii) the level of action. (c) 2005 Elsevier B.V. All rights reserved.
Resumo:
Abstract: Purpose – The aim of this research is to determine the optimal upgrade and preventive maintenance actions that minimize the total expected cost (maintenance costs+penalty costs). Design/methodology/approach – The problem is a four-parameter optimization with two parameters being k-dimensional. The optimal solution is obtained by using a four-stage approach where at each stage a one-parameter optimization is solved. Findings – Upgrading action is an extra option before the lease of used equipment, in addition to preventive maintenance action. Upgrading action makes equipment younger and preventive maintenance action lowers the ROCOF. Practical implications – There is a growing trend towards leasing equipment rather than owning it. The lease contract contains penalties if the equipment fails often and repairs are done within reasonable time period. This implies that the lessor needs to look at optimal preventive maintenance strategies in the case of new equipment lease, and upgrade actions plus preventive maintenance in the case of used equipment lease. The paper deals with this topic and is of great significant to business involved with leasing equipment. Originality/value – Nowadays many organizations are interested in leasing equipment and outsourcing maintenance. The model in this paper addresses the preventive maintenance problem for leased equipment. It provides an approach to dealing with this problem.