116 resultados para Hydro power reliability
em University of Queensland eSpace - Australia
Resumo:
Grid computing is an emerging technology for providing the high performance computing capability and collaboration mechanism for solving the collaborated and complex problems while using the existing resources. In this paper, a grid computing based framework is proposed for the probabilistic based power system reliability and security analysis. The suggested name of this computing grid is Reliability and Security Grid (RSA-Grid). Then the architecture of this grid is presented. A prototype system has been built for further development of grid-based services for power systems reliability and security assessment based on probabilistic techniques, which require high performance computing and large amount of memory. Preliminary results based on prototype of this grid show that RSA-Grid can provide the comprehensive assessment results for real power systems efficiently and economically.
Resumo:
The aim of this study was to examine the reliability and validity of field tests for assessing physical function in mid-aged and young-old people (55–70 y). Tests were selected that required minimal space and equipment and could be implemented in multiple field settings such as a general practitioner's office. Nineteen participants completed 2 field and 1 laboratory testing sessions. Intra-class correlations showed good reliability for the tests of upper body strength (lift and reach, R= .66), lower body strength (sit to stand, R= .80) and functional capacity (Canadian Step Test, R= .92), but not for leg power (single timed chair rise, R= .28). There was also good reliability for the balance test during 3 stances: parallel (94.7% agreement), semi-tandem (73.7%), and tandem (52.6%). Comparison of field test results with objective laboratory measures found good validity for the sit to stand (cf 1RM leg press, Pearson r= .68, p< .05), and for the step test (cf PWC140, r= −.60, p< .001), but not for the lift and reach (cf 1RM bench press, r= .43, p> .05), balance (r= −.13, −.18, .23) and rate of force development tests (r= −.28). It was concluded that the lower body strength and cardiovascular function tests were appropriate for use in field settings with mid-aged and young-old adults.
Resumo:
Hereditary nonpolyposis colorectal cancer syndrome (HNPCC) is an autosomal dominant condition accounting for 2–5% of all colorectal carcinomas as well as a small subset of endometrial, upper urinary tract and other gastrointestinal cancers. An assay to detect the underlying defect in HNPCC, inactivation of a DNA mismatch repair enzyme, would be useful in identifying HNPCC probands. Monoclonal antibodies against hMLH1 and hMSH2, two DNA mismatch repair proteins which account for most HNPCC cancers, are commercially available. This study sought to investigate the potential utility of these antibodies in determining the expression status of these proteins in paraffin-embedded formalin-fixed tissue and to identify key technical protocol components associated with successful staining. A set of 20 colorectal carcinoma cases of known hMLH1 and hMSH2 mutation and expression status underwent immunoperoxidase staining at multiple institutions, each of which used their own technical protocol. Staining for hMSH2 was successful in most laboratories while staining for hMLH1 proved problematic in multiple labs. However, a significant minority of laboratories demonstrated excellent results including high discriminatory power with both monoclonal antibodies. These laboratories appropriately identified hMLH1 or hMSH2 inactivation with high sensitivity and specificity. The key protocol point associated with successful staining was an antigen retrieval step involving heat treatment and either EDTA or citrate buffer. This study demonstrates the potential utility of immunohistochemistry in detecting HNPCC probands and identifies key technical components for successful staining.
Resumo:
Objective: The aim of the present study was to investigate the between-days reliability of electromyographic (EMG) measurement of 6 bilateral trunk muscles and also the torque output in 3 planes during isometric right and left axial rotation at different exertion levels. Methods: Ten healthy subjects performed isometric right and left axial rotation at 100, 70, 50 and 30% maximum voluntary contractions in two testing sessions at least 7 days apart. EMG amplitude and frequency analyses of the recorded surface EMG signals were performed for rectus abdominis, external oblique, internal oblique, latissimus dorsi, iliocostalis lumborum and multifidus bilaterally. The primary torque in the transverse plane and the coupling torques in sagittal and coronal planes were measured. Results: For both EMG amplitude and frequency values, good (intraclass correlation coefficient, ICC = 0.75-0.89) to excellent (ICC greater than or equal to 0.90) reliability was found in the 6 trunk muscles at different exertion levels during axial rotation. The reliability of both maximal isometric axial rotation torque and coupling torques in sagittal and coronal planes were found to be excellent (ICC greater than or equal to 0.93). Conclusions: Good to excellent reliability of EMG measures of trunk muscles and torque measurements during isometric axial rotation was demonstrated. This provides further confidence of using EMG and triaxial torque assessment as outcome measures in rehabilitation and in the evaluation of the human performance in the work place. (C) 2003 International Federation of Clinical Neurophysiology. Published by Elsevier Ireland Ltd. All rights reserved.
Resumo:
This study has three main objectives. First, it develops a generalization of the commonly used EKS method to multilateral price comparisons. It is shown that the EKS system can be generalized so that weights can be attached to each of the link comparisons used in the EKS computations. These weights can account for differing levels of reliability of the underlying binary comparisons. Second, various reliability measures and corresponding weighting schemes are presented and their merits discussed. Finally, these new methods are applied to an international data set of manufacturing prices from the ICOP project. Although theoretically superior, it appears that the empirical impact of the weighted EKS method is generally small compared to the unweighted EKS. It is also found that this impact is larger when it is applied at lower levels of aggregation. Finally, the importance of using sector specific PPPs in assessing relative levels of manufacturing productivity is indicated.
Resumo:
Purpose: Although manufacturers of bicycle power monitoring devices SRM and Power Tap (PT) claim accuracy to within 2.5%, there are limited scientific data available in support. The purpose of this investigation was to assess the accuracy of SRM and PT under different conditions. Methods: First, 19 SRM were calibrated, raced for 11 months, and retested using a dynamic CALRIG (50-1000 W at 100 rpm). Second, using the same procedure, five PT were repeat tested on alternate days. Third, the most accurate SRM and PT were tested for the influence of cadence (60, 80, 100, 120 rpm), temperature (8 and 21degreesC) and time (1 h at similar to300 W) on accuracy. Finally, the same SRM and PT were downloaded and compared after random cadence and gear surges using the CALRIG and on a training ride. Results: The mean error scores for SRM and PT factory calibration over a range of 50-1000 W were 2.3 +/- 4.9% and -2.5 +/- 0.5%, respectively. A second set of trials provided stable results for 15 calibrated SRM after 11 months (-0.8 +/- 1.7%), and follow-up testing of all PT units confirmed these findings (-2.7 +/- 0.1%). Accuracy for SRM and PT was not largely influenced by time and cadence; however. power output readings were noticeably influenced by temperature (5.2% for SRM and 8.4% for PT). During field trials, SRM average and max power were 4.8% and 7.3% lower, respectively, compared with PT. Conclusions: When operated according to manufacturers instructions, both SRM and PT offer the coach, athlete, and sport scientist the ability to accurately monitor power output in the lab and the field. Calibration procedures matching performance tests (duration, power, cadence, and temperature) are, however, advised as the error associated with each unit may vary.
Resumo:
We present a simulator of a hydropower company’s view of its scheme, and its broader market and network context, which has been developed to evaluate advanced displays for control room operations. Although simplified, the simulator captures all the main aspects of scheme operations. The simulator allows controlled studies to be performed that test the effectiveness of current vs advanced display concepts under normal vs unexpected operating conditions that can be scripted into the simulator.
Resumo:
We present the design rationale and basic workings of a low-cost, easy-to-use power system simulator developed to support investigations into human interface design for a hydropower plant. The power system simulator is based on three important components: models of power system components, a data repository, and human interface elements. Dynamic Data Exchange (DDE) allows simulator components to communicate with each other within the simulator. To construct the modules of the simulator we have combined the advantages of commercial software such as Matlab/Simulink, ActiveX Control, Visual Basic and Excel and integrated them in the simulator. An important advantage of our approach is that further components of the simulator now can be developed independently. An initial assessment of the simulator indicates it is fit for intended purpose.
Resumo:
The UQ RoboRoos have been developed to participate in the RoboCup robot soccer small size league over several years. RoboCup 2001 saw a focus on the mechanical design of the RoboRoos, with the introduction of an omni-directional drive system and a high power kicker. The change in mechanical design had implications for the rest of the system particularly navigation and multi-robot planning. In addition, the overhead vision system was upgraded to improve reliability and robustness.
Resumo:
This study determined the inter-tester and intra-tester reliability of physiotherapists measuring functional motor ability of traumatic brain injury clients using the Clinical Outcomes Variable Scale (COVS). To test inter-tester reliability, 14 physiotherapists scored the ability of 16 videotaped patients to execute the items that comprise the COVS. Intra-tester reliability was determined by four physiotherapists repeating their assessments after one week, and three months later. The intra-class correlation coefficients (ICC) were very high for both inter-tester reliability (ICC > 0.97 for total COVS scores, ICC > 0.93 for individual COVS items) and intra-tester reliability (ICC > 0.97). This study demonstrates that physiotherapists are reliable in the administration of the COVS.
Resumo:
Market-based transmission expansion planning gives information to investors on where is the most cost efficient place to invest and brings benefits to those who invest in this grid. However, both market issue and power system adequacy problems are system planers’ concern. In this paper, a hybrid probabilistic criterion of Expected Economical Loss (EEL) is proposed as an index to evaluate the systems’ overall expected economical losses during system operation in a competitive market. It stands on both investors’ and planner’s point of view and will further improves the traditional reliability cost. By applying EEL, it is possible for system planners to obtain a clear idea regarding the transmission network’s bottleneck and the amount of losses arises from this weak point. Sequentially, it enables planners to assess the worth of providing reliable services. Also, the EEL will contain valuable information for moneymen to undertake their investment. This index could truly reflect the random behaviors of power systems and uncertainties from electricity market. The performance of the EEL index is enhanced by applying Normalized Coefficient of Probability (NCP), so it can be utilized in large real power systems. A numerical example is carried out on IEEE Reliability Test System (RTS), which will show how the EEL can predict the current system bottleneck under future operational conditions and how to use EEL as one of planning objectives to determine future optimal plans. A well-known simulation method, Monte Carlo simulation, is employed to achieve the probabilistic characteristic of electricity market and Genetic Algorithms (GAs) is used as a multi-objective optimization tool.
Resumo:
A large number of models have been derived from the two-parameter Weibull distribution and are referred to as Weibull models. They exhibit a wide range of shapes for the density and hazard functions, which makes them suitable for modelling complex failure data sets. The WPP and IWPP plot allows one to determine in a systematic manner if one or more of these models are suitable for modelling a given data set. This paper deals with this topic.