5 resultados para Hydro
em University of Queensland eSpace - Australia
Resumo:
Early work on sea-levels in southwest Australia claimed to recognise a Holocene sea-level highstand which was not seen in better known sea-level records elsewhere at the time. More recent work has confirmed that a mid-Holocene highstand Occurred about 6 kyr ago. As new data on oscillating sea-levels from the region have recently been published, a high continuity, precisely dated and accurately surveyed record was obtained from emergent coral pavements in the leeward Houtman Abrolhos Islands (Serventy Island), a tectonically stable region from where good-quality Holocene sea-level data have been previously obtained from corals. From the mid-Holocene highstand ca. 7 U/Th kyr ago, sea-level declined linearly during the remainder of the Holocene as the carbonate platform prograded leewards. Hydro-isostatic controls are probably significant in the record. (c) 2005 Elsevier Ltd and INQUA. All rights reserved.
Resumo:
Like any other natural resources, hydro resources that are capable of generating electricity at cheaper cost give rise to economic rent. Nepal possesses huge amount of such cheaper hydro resources which is far in excess of the domestic demand. The existing rents levied by the governments are not found to address the potential value of resources. In this study hydro rent is calculated for two types of hydropower projects: (i) domestic demand oriented project and (ii) large and export oriented project. In doing so, the study uses the concept of hydro rent as a measure of cost savings achievable by the use of hydro resources over the least cost alternatives. The WASP-III+ optimisation software developed by IAEA has been used to derive two least cost generation expansion plans i.e. one with and the other without the nominated hydro resource. The difference in the costs of two plans gives the rent of the hydro resource.
Resumo:
We present a simulator of a hydropower company’s view of its scheme, and its broader market and network context, which has been developed to evaluate advanced displays for control room operations. Although simplified, the simulator captures all the main aspects of scheme operations. The simulator allows controlled studies to be performed that test the effectiveness of current vs advanced display concepts under normal vs unexpected operating conditions that can be scripted into the simulator.
Resumo:
We present the design rationale and basic workings of a low-cost, easy-to-use power system simulator developed to support investigations into human interface design for a hydropower plant. The power system simulator is based on three important components: models of power system components, a data repository, and human interface elements. Dynamic Data Exchange (DDE) allows simulator components to communicate with each other within the simulator. To construct the modules of the simulator we have combined the advantages of commercial software such as Matlab/Simulink, ActiveX Control, Visual Basic and Excel and integrated them in the simulator. An important advantage of our approach is that further components of the simulator now can be developed independently. An initial assessment of the simulator indicates it is fit for intended purpose.