12 resultados para Dump trucks
em University of Queensland eSpace - Australia
Resumo:
Kalman inverse filtering is used to develop a methodology for real-time estimation of forces acting at the interface between tyre and road on large off-highway mining trucks. The system model formulated is capable of estimating the three components of tyre-force at each wheel of the truck using a practical set of measurements and inputs. Good tracking is obtained by the estimated tyre-forces when compared with those simulated by an ADAMS virtual-truck model. A sensitivity analysis determines the susceptibility of the tyre-force estimates to uncertainties in the truck's parameters.
Resumo:
In the three years to June 2005, 959 injuries associated with continuous miners (CMs), shuttle cars (SCs), load–haul–dump and personnel transport (PT) were reported by NSW underground coal mines, comprising 23% of all injuries reported. The present paper reports an analysis of the narrative field accompanying these reports to determine opportunities for controlling injury risks. The most common combinations of activity and mechanism were: strain while handling CM cable (96 injuries); caught between or struck by moving parts while bolting on a CM (86 injuries); strains while bolting on CM (54 injuries); and slipping off a CM during access, egress or other activity (60 injuries). For the other equipment considered, the common injury mechanism was the vehicle running over a pothole or other roadway abnormality causing the driver or passengers to be injured (169 injuries). Potential control measures include: monorails for CM services; hydraulic cable reelers; handrails on CM platforms; redesign of CM platforms and bolting rigs to reduce reach distances during drilling and bolting; improvements to guarding of bolting controls; standardisation and shape coding of bolting controls; two handed fast feed; improvements in underground roadway maintenance, vehicle suspension, visibility and seating; and pedestrian proximity warning devices.
Resumo:
Trucks with banners in Brisbane, Australia, during the Labor Day procession, May 1965.
Resumo:
This paper outlines the methodology of blast fragmentation modeling undertaken for a green field feasibility study at the Riska gold deposit in Indonesia. The favoured milling process for the feasibility study was dump leaching,with no crushing of the ore material extracted from the pit. For this reason,blast fragmentation was a critical issue to be addressed by the study. A range of blast designs were considered with bench heights and blasthole diameters ranging from 4 m to 7 m and 76 mm to 102 mm respectively. Rock mass data was obtained from 19 diamond drill cores across the deposit (total drill length approximately 2200 m). Intact rock strength was estimated from qualitative strength descriptors,while the in situ block size distribution of the rock mass was estimated from the Rock Quality Designation (RQD) of the core.