62 resultados para Cost projections
Resumo:
Like many states and territories, South Australia has a legacy of marine reserves considered to be inadequate to meet current conservation objectives. In this paper we configured exploratory marine reserve systems, using the software MARXAN, to examine how efficiently South Australia's existing marine reserves contribute to quantitative biodiversity conservation targets. Our aim was to compare marine reserve systems that retain South Australia's existing marine reserves with reserve systems that are free to either ignore or incorporate them. We devised a new interpretation of irreplaceability to identify planning units selected more than could be expected from chance alone. This is measured by comparing the observed selection frequency for an individual planning unit with a predicted selection frequency distribution. Knowing which sites make a valuable contribution to efficient marine reserve system design allows us to determine how well South Australia's existing reserves contribute to reservation goals when representation targets are set at 5, 10, 15, 20, 30 and 50% of conservation features. Existing marine reserves that tail to contribute to efficient marine reserve systems constitute 'opportunity costs'. We found that despite spanning less than 4% of South Australian state waters, locking in the existing ad hoc marine reserves presented considerable opportunity costs. Even with representation targets set at 50%, more than halt of South Australia's existing marine reserves were selected randomly or less in efficient marine reserve systems. Hence, ad hoc marine reserve systems are likely to be inefficient and may compromise effective conservation of marine biodiversity.
Resumo:
BP Refinery (Bulwer Island) Ltd (BP) located on the eastern Australian coast is currently undergoing a major expansion as a part of the Queensland Clean Fuels Project. The associated wastewater treatment plant upgrade will provide a better quality of treated effluent than is currently possible with the existing infrastructure, and which will be of a sufficiently high standard to meet not only the requirements of imposed environmental legislation but also BP's environmental objectives. A number of challenges were faced when considering the upgrade, particularly; cost constraints and limited plot space, highly variable wastewater, toxicity issues, and limited available hydraulic head. Sequencing Batch Reactor (SBR) Technology was chosen for the lagoon upgrade based on the following; SBR technology allowed a retro-fit of the existing earthen lagoon without the need for any additional substantial concrete structures, a dual lagoon system allowed partial treatment of wastewaters during construction, SBRs give substantial process flexibility, SBRs have the ability to easily modify process parameters without any physical modifications, and significant cost benefits. This paper presents the background to this application, an outline of laboratory studies carried out on the wastewater and details the full scale design issues and methods for providing a cost effective, efficient treatment system using the existing lagoon system.