53 resultados para Sinnissippi Dam (Rock Falls, Ill.)
Resumo:
Along with material characteristics and geometry, the climate in which a mine is located can have a dramatic effect on the appropriate options for rehabilitation. The paper outlines the setting, mining, milling and waste disposal at Kidston Gold Mine's open pit operations in the semi-arid climate of North Queensland, Australia, before focusing on the engineering aspects of the rehabilitation of Kidston. The mine took a holistic and proactive approach to rehabilitation, and was prepared to demonstrate a number of innovative approaches, which are described in the paper. Engineering issues that had to be addressed included the geotechnical stability and deformation of waste rock dumps, including a 240 m high in-pit dump: the construction and performance monitoring of a “store and release” cover over potentially acid forming mineralised waste rock; erosion from the side slopes of the waste rock dumps; the in-pit co-disposal of waste rock and thickened tailings; the geotechnical stability of the tailings dam wall; the potential for erosion of bare tailings; the water balance of the tailings dam; direct revegetation of the tailings; and the pit hydrology. The rehabilitation of the mine represents an important benchmark in mine site rehabilitation best practice, from which lessons applicable worldwide can be shared.
Resumo:
Habitat choice by brush-tailed rock-wallabies (Petrogale penicillata) in south-east Queensland was investigated by comparing the attributes of the nocturnal foraging locations that they selected with those of random locations within a radius of 50 m. Brush-tailed rock-wallabies were shown to select foraging locations on the basis of forage quality and/or their ability to see predators, rather than protection from predators amongst vegetation that could conceal them. Habitat choice may have been affected by limited food availability, as this study was conducted in the winter dry season. The attributes of foraging locations that brush- tailed rock-wallabies perceived as increasing their predation risk were assessed by recording the proportion of time that brush- tailed rock-wallabies spent vigilant while foraging. To measure vigilance, focal animals were observed with a night- vision scope for two minutes and the proportions of time spent vigilant and feeding were recorded. No measured feature of foraging locations was related to higher vigilance levels, suggesting that brush- tailed rock-wallabies did not alter their vigilance whether sheltered amongst grass tussocks or in open habitat, or whether feeding on good quality or poorer quality vegetation. Vigilance levels significantly declined as overnight temperatures decreased, which may have resulted from higher energy requirements of brush- tailed rock-wallabies during winter. The only factors that were found to significantly increase vigilance levels were high winds and moonlit nights. On bright nights, brush- tailed rock-wallabies were very unsettled and during high winds they often did not emerge to feed. More information is needed about how macropods detect predators at night before the effects of wind and light intensity upon vigilance can be fully understood.
Resumo:
Blasting has been the most frequently used method for rock breakage since black powder was first used to fragment rocks, more than two hundred years ago. This paper is an attempt to reassess standard design techniques used in blasting by providing an alternative approach to blast design. The new approach has been termed asymmetric blasting. Based on providing real time rock recognition through the capacity of measurement while drilling (MWD) techniques, asymmetric blasting is an approach to deal with rock properties as they occur in nature, i.e., randomly and asymmetrically spatially distributed. It is well accepted that performance of basic mining operations, such as excavation and crushing rely on a broken rock mass which has been pre conditioned by the blast. By pre-conditioned we mean well fragmented, sufficiently loose and with adequate muckpile profile. These muckpile characteristics affect loading and hauling [1]. The influence of blasting does not end there. Under the Mine to Mill paradigm, blasting has a significant leverage on downstream operations such as crushing and milling. There is a body of evidence that blasting affects mineral liberation [2]. Thus, the importance of blasting has increased from simply fragmenting and loosing the rock mass, to a broader role that encompasses many aspects of mining, which affects the cost of the end product. A new approach is proposed in this paper which facilitates this trend 'to treat non-homogeneous media (rock mass) in a non-homogeneous manner (an asymmetrical pattern) in order to achieve an optimal result (in terms of muckpile size distribution).' It is postulated there are no logical reasons (besides the current lack of means to infer rock mass properties in the blind zones of the bench and onsite precedents) for drilling a regular blast pattern over a rock mass that is inherently heterogeneous. Real and theoretical examples of such a method are presented.
Resumo:
There has been a resurgence of interest in the mean trace length estimator of Pahl for window sampling of traces. The estimator has been dealt with by Mauldon and Zhang and Einstein in recent publications. The estimator is a very useful one in that it is non-parametric. However, despite some discussion regarding the statistical distribution of the estimator, none of the recent works or the original work by Pahl provide a rigorous basis for the determination a confidence interval for the estimator or a confidence region for the estimator and the corresponding estimator of trace spatial intensity in the sampling window. This paper shows, by consideration of a simplified version of the problem but without loss of generality, that the estimator is in fact the maximum likelihood estimator (MLE) and that it can be considered essentially unbiased. As the MLE, it possesses the least variance of all estimators and confidence intervals or regions should therefore be available through application of classical ML theory. It is shown that valid confidence intervals can in fact be determined. The results of the work and the calculations of the confidence intervals are illustrated by example. (C) 2003 Elsevier Science Ltd. All rights reserved.
Resumo:
A number of authors concerned with the analysis of rock jointing have used the idea that the joint areal or diametral distribution can be linked to the trace length distribution through a theorem attributed to Crofton. This brief paper seeks to demonstrate why Crofton's theorem need not be used to link moments of the trace length distribution captured by scan line or areal mapping to the moments of the diametral distribution of joints represented as disks and that it is incorrect to do so. The valid relationships for areal or scan line mapping between all the moments of the trace length distribution and those of the joint size distribution for joints modeled as disks are recalled and compared with those that might be applied were Crofton's theorem assumed to apply. For areal mapping, the relationship is fortuitously correct but incorrect for scan line mapping.