When examining a rock mass, joint sets and their orientations can play a significant role with regard to how the rock mass will behave. To identify joint sets present in the rock mass, the orientation of individual fracture planer can be measured on exposed rock faces and the resulting data can be examined for heterogeneity. In this article, the expectation-maximization algorithm is used to lit mixtures of Kent component distributions to the fracture data to aid in the identification of joint sets. An additional uniform component is also included in the model to accommodate the noise present in the data.
Resumo:
A new model to predict the extent of crushing around a blasthole is presented. The model is based on the back-analysis of a comprehensive experimental program that included the direct measurement of the zone of crushing from 92 blasting tests on concrete blocks using two commercial explosives. The concrete blocks varied from low, medium to high strength and measured 1.5 in in length, 1.0 m in width and 1.1 m in height. A dimensionless parameter called the crushing zone index (CZI) is introduced. This index measures the crushing potential of a charged blasthole and is a function of the borehole pressure, the unconfined compressive strength of the rock material, dynamic Young's modulus and Poisson's ratio. It is shown that the radius of crushing is a function of the CZI and the blasthole radius. A good correlation between the new model and measured results was obtained. A number of previously proposed models could not approximate the conditions measured in the experimental work and there are noted discrepancies between the different approaches reviewed, particularly for smaller diameter holes and low strength rock conditions. The new model has been verified with full scale tests reported in the literature. Results from this validation and model evaluations show its applicability to production blasting. (C) 2003 Elsevier Science Ltd. All rights reserved.
Resumo:
Measurement while drilling (MWD) techniques can provide a useful tool to aid drill and blast engineers in open cut mining. By avoiding time consuming tasks such as scan-lines and rock sample collection for laboratory tests, MWD techniques can not only save time but also improve the reliability of the blast design by providing the drill and blast engineer with the information specially tailored for use. While most mines use a standard blast pattern and charge per blasthole, based on a single rock factor for the entire bench or blast region, information derived from the MWD parameters can improve the blast design by providing more accurate rock properties for each individual blasthole. From this, decisions can be made on the most appropriate type and amount of explosive charge to place in a per blasthole or to optimise the inter-hole timing detonation time of different decks and blastholes. Where real-time calculations are feasible, the system could extend the present blast design even be used to determine the placement of subsequent holes towards a more appropriate blasthole pattern design like asymmetrical blasting.
Resumo:
Blasting has been the most frequently used method for rock breakage since black powder was first used to fragment rocks, more than two hundred years ago. This paper is an attempt to reassess standard design techniques used in blasting by providing an alternative approach to blast design. The new approach has been termed asymmetric blasting. Based on providing real time rock recognition through the capacity of measurement while drilling (MWD) techniques, asymmetric blasting is an approach to deal with rock properties as they occur in nature, i.e., randomly and asymmetrically spatially distributed. It is well accepted that performance of basic mining operations, such as excavation and crushing rely on a broken rock mass which has been pre conditioned by the blast. By pre-conditioned we mean well fragmented, sufficiently loose and with adequate muckpile profile. These muckpile characteristics affect loading and hauling [1]. The influence of blasting does not end there. Under the Mine to Mill paradigm, blasting has a significant leverage on downstream operations such as crushing and milling. There is a body of evidence that blasting affects mineral liberation [2]. Thus, the importance of blasting has increased from simply fragmenting and loosing the rock mass, to a broader role that encompasses many aspects of mining, which affects the cost of the end product. A new approach is proposed in this paper which facilitates this trend 'to treat non-homogeneous media (rock mass) in a non-homogeneous manner (an asymmetrical pattern) in order to achieve an optimal result (in terms of muckpile size distribution).' It is postulated there are no logical reasons (besides the current lack of means to infer rock mass properties in the blind zones of the bench and onsite precedents) for drilling a regular blast pattern over a rock mass that is inherently heterogeneous. Real and theoretical examples of such a method are presented.
Resumo:
Blast fragmentation can have a significant impact on the profitability of a mine. An optimum run of mine (ROM) size distribution is required to maximise the performance of downstream processes. If this fragmentation size distribution can be modelled and controlled, the operation will have made a significant advancement towards improving its performance. Blast fragmentation modelling is an important step in Mine to Mill™ optimisation. It allows the estimation of blast fragmentation distributions for a number of different rock mass, blast geometry, and explosive parameters. These distributions can then be modelled in downstream mining and milling processes to determine the optimum blast design. When a blast hole is detonated rock breakage occurs in two different stress regions - compressive and tensile. In the-first region, compressive stress waves form a 'crushed zone' directly adjacent to the blast hole. The second region, termed the 'cracked zone', occurs outside the crush one. The widely used Kuz-Ram model does not recognise these two blast regions. In the Kuz-Ram model the mean fragment size from the blast is approximated and is then used to estimate the remaining size distribution. Experience has shown that this model predicts the coarse end reasonably accurately, but it can significantly underestimate the amount of fines generated. As part of the Australian Mineral Industries Research Association (AMIRA) P483A Mine to Mill™ project, the Two-Component Model (TCM) and Crush Zone Model (CZM), developed by the Julius Kruttschnitt Mineral Research Centre (JKMRC), were compared and evaluated to measured ROM fragmentation distributions. An important criteria for this comparison was the variation of model results from measured ROM in the-fine to intermediate section (1-100 mm) of the fragmentation curve. This region of the distribution is important for Mine to Mill™ optimisation. The comparison of modelled and Split ROM fragmentation distributions has been conducted in harder ores (UCS greater than 80 MPa). Further work involves modelling softer ores. The comparisons will be continued with future site surveys to increase confidence in the comparison of the CZM and TCM to Split results. Stochastic fragmentation modelling will then be conducted to take into account variation of input parameters. A window of possible fragmentation distributions can be compared to those obtained by Split . Following this work, an improved fragmentation model will be developed in response to these findings.
Resumo:
Stress relaxation is relevant to the design of both civil and mining excavations. While many authors refer to the adverse effect of stress relaxation on excavation stability, some present compelling empirical evidence indicating that stress relaxation does not have a significant effect. Establishing clear definitions of stress relaxation was critical to understanding and quantifying stress relaxation of the various types that have been referred to in the literature. This paper defines three types of stress relaxation – partial relaxation, full relaxation and tangential relaxation. Once clear definitions were determined, it became clear that the theoretical arguments and empirical evidence presented by various authors to support their respective cases are not contradictory; rather, the different conclusions can be attributed to different types of stress relaxation. In particular, when the minor principal stress is negative the intermediate principal stress has been identified as significantly affecting jointed rock mass behaviour. The aim of the study was to review and evaluate existing methods of quantifying the effect of stress relaxation around underground excavations and, if necessary, propose a new set of recommendations. An empirical stope stability model, that has been termed the Extended Mathews stability chart, was considered to be the most appropriate method of quantifying the effects of stress relaxation. A new set of guidelines to account for the effect of stress relaxation on excavation stability in the Extended Mathews stability chart has been proposed from a back-analysis of 55 case histories of stress relaxation.
Resumo:
Commercial explosives behave non-ideally in rock blasting. A direct and convenient measure of non-ideality is the detonation velocity. In this study, an alternative model fitted to experimental unconfined detonation velocity data is proposed and the effect of confinement on the detonation velocity is modelled. Unconfined data of several explosives showing various levels of nonideality were successfully modelled. The effect of confinement on detonation velocity was modelled empirically based on field detonation velocity measurements. Confined detonation velocity is a function of the ideal detonation velocity, unconfined detonation velocity at a given blasthole diameter and rock stiffness. For a given explosive and charge diameter, as confinement increases detonation velocity increases. The confinement model is implemented in a simple engineering based non-ideal detonation model. A number of simulations are carried out and analysed to predict the explosive performance parameters for the adopted blasting conditions.
Resumo:
Modelling and optimization of the power draw of large SAG/AG mills is important due to the large power draw which modern mills require (5-10 MW). The cost of grinding is the single biggest cost within the entire process of mineral extraction. Traditionally, modelling of the mill power draw has been done using empirical models. Although these models are reliable, they cannot model mills and operating conditions which are not within the model database boundaries. Also, due to its static nature, the impact of the changing conditions within the mill on the power draw cannot be determined using such models. Despite advances in computing power, discrete element method (DEM) modelling of large mills with many thousands of particles could be a time consuming task. The speed of computation is determined principally by two parameters: number of particles involved and material properties. The computational time step is determined by the size of the smallest particle present in the model and material properties (stiffness). In the case of small particles, the computational time step will be short, whilst in the case of large particles; the computation time step will be larger. Hence, from the point of view of time required for modelling (which usually corresponds to time required for 3-4 mill revolutions), it will be advantageous that the smallest particles in the model are not unnecessarily too small. The objective of this work is to compare the net power draw of the mill whose charge is characterised by different size distributions, while preserving the constant mass of the charge and mill speed. (C) 2004 Elsevier Ltd. All rights reserved.
Resumo:
A concept has been developed where characteristic load cycles of longwall shields can describe most of the interaction between a longwall support and the roof. A characteristic load cycle is the change in support pressure with time from setting the support against the roof to the next release and movement of the support. The concept has been validated through the back-analysis of more than 500 000 individual load cycles in five longwall panels at four mines and seven geotechnical domains. The validation process depended upon the development of new software capable of both handling the large quantity of data emanating from a modern longwall and accurately delineating load cycles. Existing software was found not to be capable of delineating load cycles to a sufficient accuracy. Load-cycle analysis can now be used quantitatively to assess the adequacy of support capacity and the appropriateness of set pressure for the conditions under which a longwall is being operated. When linked to a description of geotechnical conditions, this has allowed the development of a database for support selection for greenfield sites. For existing sites, the load-cycle characteristic concept allows for a diagnosis of strata-support problem areas, enabling changes to be made to set pressure and mining strategies to manage better, or avoid, strata control problems. With further development of the software, there is the prospect of developing a system that is able to respond to changes in strata-support interaction in real time.