41 resultados para masonry buildings


Relevância:

10.00% 10.00%

Publicador:

Resumo:

Timber framing to new bath house (centre), with existing buildings to either side.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Timber framing to new bath house (centre), with existing buildings to either side.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Timber framing to new bath house (centre), with existing buildings to either side.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

New bath house (centre), with existing buildings to either side during sunset.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

New bath house (centre), with existing buildings to either side.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

New bath house (centre), with existing buildings to either side.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The "Pointe Saint Mathieu" is one of the most westerly continental landmarks of France. The promontory is located at the entrance of the "Goulet de la Rade de Brest", that is the entrance channel of the harbour of Brest in Brittany (France). It marks also the Southern end of the "Chenal du Four" that is the main navigation channel between the islands of Ouessant, Molène and Béniquet, and Brittany. The "Chenal du Four" is reputed for its dangers. The tidal range is greater than 7 m in spring tides, and the mid-tide current may exceed 5 knots. The Saint Mathieu promontory is equipped with a lighthouse and a semaphore. The former is located in the ruins of an old monastery, founded during the 6th century AD by Saint Tanguy. The present ruins are the remnants of buildings from the 11th to 15th centuries. The first lighthouse was installed in 1689, although the monks of the monastery used to maintain a signal light since the 1250s. Completed in 1835, the present "Phare de la Pointe Saint-Mathieu" is 37 m high and it reaches 58.8 m above sea level During World War 2, the Pointe Saint Mathieu was defended by a series of concrete fortifications built by the Germans. Some were based upon some earlier French bunker systems, like the coastal battery at the Rospects which included 4 main gun bunkers (4*150 mm, or 2*150 mm & 2*105 mm), an observation bunker on the Western side close to sea, and several smaller structures. There was also the large Kéringar Blockhaus system, near Lochrist, located about 1 km inland and designed for 4 guns of 280 mm. Its command bunker remains a landmark along the main road. All this area was very-heavily bombed between 1943 and 1944, and particularly during the battle of Brest in August-September 1944 ("L'Enfer de Brest").

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Truck from Jackson Pty Ltd with banner for equal pay for equal work during the 1965 May Day march, in Roma Street, Brisbane, Australia. Truck also has Queensland Trades and Labour Council of Queensland and affiliated unions banner. Facade of buildings including Vetoy and Foley Bros can be seen in the background.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This study describes the pedagogical impact of real-world experimental projects undertaken as part of an advanced undergraduate Fluid Mechanics subject at an Australian university. The projects have been organised to complement traditional lectures and introduce students to the challenges of professional design, physical modelling, data collection and analysis. The physical model studies combine experimental, analytical and numerical work in order to develop students’ abilities to tackle real-world problems. A first study illustrates the differences between ideal and real fluid flow force predictions based upon model tests of buildings in a large size wind tunnel used for research and professional testing. A second study introduces the complexity arising from unsteady non-uniform wave loading on a sheltered pile. The teaching initiative is supported by feedback from undergraduate students. The pedagogy of the course and projects is discussed with reference to experiential, project-based and collaborative learning. The practical work complements traditional lectures and tutorials, and provides opportunities which cannot be learnt in the classroom, real or virtual. Student feedback demonstrates a strong interest for the project phases of the course. This was associated with greater motivation for the course, leading in turn to lower failure rates. In terms of learning outcomes, the primary aim is to enable students to deliver a professional report as the final product, where physical model data are compared to ideal-fluid flow calculations and real-fluid flow analyses. Thus the students are exposed to a professional design approach involving a high level of expertise in fluid mechanics, with sufficient academic guidance to achieve carefully defined learning goals, while retaining sufficient flexibility for students to construct there own learning goals. The overall pedagogy is a blend of problem-based and project-based learning, which reflects academic research and professional practice. The assessment is a mix of peer-assessed oral presentations and written reports that aims to maximise student reflection and development. Student feedback indicated a strong motivation for courses that include a well-designed project component.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Passive techniques as an alternative to artificial cooling can bring important energy, environmental, financial, operational and qualitative benefits. However, regions such as the wet tropics can reach high levels of thermal stress in which passive means alone are unable to provide appropriate thermal comfort standards for some parts of the year. Despite a great accumulation of empirical information on the passive performance of houses for either free-running or conditioned modes, very little work has been done on the thermal performance of buildings that can operate with a mixed-running strategy in warm-humid climates. Buildings with such design features are able to balance the needs for comfort, privacy, and energy efficiency during different periods of the year. As free-running and conditioned modes are believed by many to be 'opposite' approaches, and have been presented as separate strategies, this paper demonstrates that not all parameters are directly opposite and a possible dual-mode integrated operation can be used for warm-humid locations for maximum comfort and minimum energy requirements. For this purpose, simulation runs using ESP-R (University of Strathclyde, ESRU, UK) were based on the climate data of Darwin (Australia) and on the ventilation styles of the house: free running and conditioned. Design features applicable to both, i.e. for a dual mode operation could be identified and the differences between conditioned and free running were demonstrated and proved not to be totally conflicting and therefore suitable for a dual mode operation. Different daily usage profiles (five use patterns were defined), and zoning of sleeping and living areas are presented. The dual mode use patterns compared to the base case house, for all the user possibilities, had improved performances of 17-52%, when compared to the free-running mode and 66-98% when compared to the conditioned mode. Simulation runs using other warm-humid climates (Miami, USA; Sao Luis, Brazil; Kuala Lumpur, Malaysia) were also conducted and compared to the results found for Darwin. (C) 2002 Elsevier Science Ltd. All rights reserved.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In the last 7 years, a method has been developed to analyse building energy performance using computer simulation, in Brazil. The method combines analysis of building design plans and documentation, walk-through visits, electric and thermal measurements and the use of an energy simulation tool (DOE-2.1E code), The method was used to model more than 15 office buildings (more than 200 000 m(2)), located between 12.5degrees and 27.5degrees South latitude. The paper describes the basic methodology, with data for one building and presents additional results for other six cases. (C) 2002 Elsevier Science Ltd. All rights reserved.