31 resultados para workflow scheduling


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Workflow technology is currently being deployed in quite diverse domains. However, the element of change is present in some degree and form in almost all domains. A workflow implementation that does not support the process of change will not benefit the organization in the long run. Change can be manifested in different forms in workflow processes. In this paper, we first present a categorization of workflow change characteristics and divide workflow processes into dynamic, adaptive and flexible processes. We define flexibility as the ability of the workflow process to execute on the basis of a loosely, or partially specified model, where the full specification of the model is made at runtime, and may be unique to each instance. To provide a modeling framework that offers true flexibility, we need to consider the factors, which influence the paths of (unique) instances together with the process definition. We advocate an approach that aims at making the process of change part of the workflow process itself. We introduce the notion of an open instance that consists of a core process and several pockets of flexibility, and present a framework based on this notion, which makes use of special build activities that provide the functionality to integrate the process of defining a change, into the open workflow instance.

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In Electronic Support, it is well known that periodic search strategies for swept-frequency superheterodyne receivers (SHRs) can cause synchronisation with the radar it seeks to detect. Synchronisation occurs when the periods governing the search strategies of the SHR and radar are commensurate. The result may be that the radar is never detected. This paper considers the synchronisation problem in depth. We find that there are usually a finite number of synchronisation ratios between the radar’s scan period and the SHR’s sweep period. We develop three geometric constructions by which these ratios can be found and we relate them to the Farey series. The ratios may be used to determine the intercept time for any combination of scan and sweep period. This theory can assist the operator of an SHR in selecting a sweep period that minimises the intercept time against a number of radars in a threat emitter list.

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Investment in mining projects, like most business investment, is susceptible to risk and uncertainty. The ability to effectively identify, assess and manage risk may enable strategic investments to be sheltered and operations to perform closer to their potential. In mining, geological uncertainty is seen as the major contributor to not meeting project expectations. The need to assess and manage geological risk for project valuation and decision-making translates to the need to assess and manage risk in any pertinent parameter of open pit design and production scheduling. This is achieved by taking geological uncertainty into account in the mine optimisation process. This thesis develops methods that enable geological uncertainty to be effectively modelled and the resulting risk in long-term production scheduling to be quantified and managed. One of the main accomplishments of this thesis is the development of a new, risk-based method for the optimisation of long-term production scheduling. In addition to maximising economic returns, the new method minimises the risk of deviating from production forecasts, given the understanding of the orebody. This ability represents a major advance in the risk management of open pit mining.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This document records the process of migrating eprints.org data to a Fez repository. Fez is a Web-based digital repository and workflow management system based on Fedora (http://www.fedora.info/). At the time of migration, the University of Queensland Library was using EPrints 2.2.1 [pepper] for its ePrintsUQ repository. Once we began to develop Fez, we did not upgrade to later versions of eprints.org software since we knew we would be migrating data from ePrintsUQ to the Fez-based UQ eSpace. Since this document records our experiences of migration from an earlier version of eprints.org, anyone seeking to migrate eprints.org data into a Fez repository might encounter some small differences. Moving UQ publication data from an eprints.org repository into a Fez repository (hereafter called UQ eSpace (http://espace.uq.edu.au/) was part of a plan to integrate metadata (and, in some cases, full texts) about all UQ research outputs, including theses, images, multimedia and datasets, in a single repository. This tied in with the plan to identify and capture the research output of a single institution, the main task of the eScholarshipUQ testbed for the Australian Partnership for Sustainable Repositories project (http://www.apsr.edu.au/). The migration could not occur at UQ until the functionality in Fez was at least equal to that of the existing ePrintsUQ repository. Accordingly, as Fez development occurred throughout 2006, a list of eprints.org functionality not currently supported in Fez was created so that programming of such development could be planned for and implemented.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The present study examined the effects of work control and job demands on employee adjustment and work performance using a multidimensional measure of work control (assessing levels of task control, decision control and work scheduling control). It was proposed that the negative effects of job demands and employee adjustment would be moderated by high levels of task control. It was also proposed that there would be evidence of main effects of both job demands and work control (particularly task-related levels of control) on employee adjustment. To test these predictions, a study of 135 university employees holding administrative positions was undertaken. Methodological improvements over previous research included the use of both self-reported adjustment measures and supervisor ratings of work performance as outcome variables, and the assessment of the predictor and outcome measures at different points in time (self-reported adjustment was assessed at both Times 1 and 2). The results revealed some support for the proposal that the effects of job demands would be buffered by high levels of task control, but not more peripheral aspects of work control. There were also significant main effects of task control on job satisfaction.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This paper seeks to understand how software systems and organisations co-evolve in practice and how order emerges in the overall environment. Using a metaphor of timetable as a commons, we analyse the introduction of a novel academic scheduling system to demonstrate how Complex Adaptive Systems theory provides insight into the adaptive behaviour of the various actors and how their action is both a response to and a driver of co-evolution within the engagement.