17 resultados para Engineering Asset Management, Optimisation, Preventive Maintenance, Reliability Based Preventive Maintenance, Multiple Criteria Decision Making


Relevância:

100.00% 100.00%

Publicador:

Resumo:

For leased equipment, the lessor carries out the maintenance of the equipment. Usually, the contract of lease specifies the penalty for equipment failures and for repairs not being carried out within specified time limits. This implies that optimal preventive maintenance policies must take these penalty costs into account and properly traded against the cost of preventive maintenance actions. The costs associated with failures are high as unplanned corrective maintenance actions are costly and the resulting penalties due to lease contract terms being violated. The paper develops a model to determine the optimal parameters of a preventive maintenance policy that takes into account all these costs to minimize the total expected cost to the lessor for new item lease. The parameters of the policy are (i) the number of preventive maintenance actions to be carried out over the lease period, (ii) the time instants for such actions, and (iii) the level of action. (c) 2005 Elsevier B.V. All rights reserved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Investment in mining projects, like most business investment, is susceptible to risk and uncertainty. The ability to effectively identify, assess and manage risk may enable strategic investments to be sheltered and operations to perform closer to their potential. In mining, geological uncertainty is seen as the major contributor to not meeting project expectations. The need to assess and manage geological risk for project valuation and decision-making translates to the need to assess and manage risk in any pertinent parameter of open pit design and production scheduling. This is achieved by taking geological uncertainty into account in the mine optimisation process. This thesis develops methods that enable geological uncertainty to be effectively modelled and the resulting risk in long-term production scheduling to be quantified and managed. One of the main accomplishments of this thesis is the development of a new, risk-based method for the optimisation of long-term production scheduling. In addition to maximising economic returns, the new method minimises the risk of deviating from production forecasts, given the understanding of the orebody. This ability represents a major advance in the risk management of open pit mining.