258 resultados para Building Certification Systems


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Steel shading structure to East elevation of Riverside Expressway building. William St building and main entry area in background.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

North elevation, Riverside Expressway building.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Detail of precast concrete sunshading panels to freeway (West) elevation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

William St building, as seen from across Riverside Expressway off-ramp.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

William St building-Riverside Expressway building junction.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Detail of precast concrete sunshading panels to freeway (West) elevation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

As seen from Queens Wharf Road.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper addresses the problem of ensuring compliance of business processes, implemented within and across organisational boundaries, with the constraints stated in related business contracts. In order to deal with the complexity of this problem we propose two solutions that allow for a systematic and increasingly automated support for addressing two specific compliance issues. One solution provides a set of guidelines for progressively transforming contract conditions into business processes that are consistent with contract conditions thus avoiding violation of the rules in contract. Another solution compares rules in business contracts and rules in business processes to check for possible inconsistencies. Both approaches rely on a computer interpretable representation of contract conditions that embodies contract semantics. This semantics is described in terms of a logic based formalism allowing for the description of obligations, prohibitions, permissions and violations conditions in contracts. This semantics was based on an analysis of typical building blocks of many commercial, financial and government contracts. The study proved that our contract formalism provides a good foundation for describing key types of conditions in contracts, and has also given several insights into valuable transformation techniques and formalisms needed to establish better alignment between these two, traditionally separate areas of research and endeavour. The study also revealed a number of new areas of research, some of which we intend to address in near future.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

MSS membranes are a good candidate for CO cleanup in fuel cell fuel processing systems due to their ability to selectively permeate H2 over CO via molecular sieving. Successfully scaled up tubular membranes were stable under dry conditions to 400°C with H2 permeance as high as 2 x 10-6 mol.m-2.s^-1.Pa^-1 at 200 degrees C and H2/CO selectivity up to 6.4, indicating molecular sieving was the dominant mechanism. A novel carbonised template molecular sieve silica (CTMSS) technology gave the scaled up membranes resilience in hydrothermal conditions up to 400 degrees C in 34% steam and synthetic reformate, which is required for use in fuel cell CO cleanup systems.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The "Pointe Saint Mathieu" is one of the most westerly continental landmarks of France. The promontory is located at the entrance of the "Goulet de la Rade de Brest", that is the entrance channel of the harbour of Brest in Brittany (France). It marks also the Southern end of the "Chenal du Four" that is the main navigation channel between the islands of Ouessant, Molène and Béniquet, and Brittany. The "Chenal du Four" is reputed for its dangers. The tidal range is greater than 7 m in spring tides, and the mid-tide current may exceed 5 knots. The Saint Mathieu promontory is equipped with a lighthouse and a semaphore. The former is located in the ruins of an old monastery, founded during the 6th century AD by Saint Tanguy. The present ruins are the remnants of buildings from the 11th to 15th centuries. The first lighthouse was installed in 1689, although the monks of the monastery used to maintain a signal light since the 1250s. Completed in 1835, the present "Phare de la Pointe Saint-Mathieu" is 37 m high and it reaches 58.8 m above sea level During World War 2, the Pointe Saint Mathieu was defended by a series of concrete fortifications built by the Germans. Some were based upon some earlier French bunker systems, like the coastal battery at the Rospects which included 4 main gun bunkers (4*150 mm, or 2*150 mm & 2*105 mm), an observation bunker on the Western side close to sea, and several smaller structures. There was also the large Kéringar Blockhaus system, near Lochrist, located about 1 km inland and designed for 4 guns of 280 mm. Its command bunker remains a landmark along the main road. All this area was very-heavily bombed between 1943 and 1944, and particularly during the battle of Brest in August-September 1944 ("L'Enfer de Brest").

Relevância:

20.00% 20.00%

Publicador:

Resumo:

These notes follow on from the material that you studied in CSSE1000 Introduction to Computer Systems. There you studied details of logic gates, binary numbers and instruction set architectures using the Atmel AVR microcontroller family as an example. In your present course (METR2800 Team Project I), you need to get on to designing and building an application which will include such a microcontroller. These notes focus on programming an AVR microcontroller in C and provide a number of example programs to illustrate the use of some of the AVR peripheral devices.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

View to entrance.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

View to circulation stair from exterior.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

View to entrance.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Detailed view of venting in brick work. Bricks used were commons, with prevalent dark blue iron staining.