130 resultados para Analytic network process
Resumo:
Rupture of a light cellophane diaphragm in an expansion tube has been studied by an optical method. The influence of the light diaphragm on test flow generation has long been recognised, however the diaphragm rupture mechanism is less well known. It has been previously postulated that the diaphragm ruptures around its periphery due to the dynamic pressure loading of the shock wave, with the diaphragm material at some stage being removed from the flow to allow the shock to accelerate to the measured speeds downstream. The images obtained in this series of experiments are the first to show the mechanism of diaphragm rupture and mass removal in an expansion tube. A light diaphragm was impulsively loaded via a shock wave and a series of images was recorded holographically throughout the rupture process, showing gradual destruction of the diaphragm. Features such as the diaphragm material, the interface between gases, and a reflected shock were clearly visualised. Both qualitative and quantitative aspects of the rupture dynamics were derived from the images and compared with existing one-dimensional theory.
Resumo:
Over the last decade, ambitious claims have been made in the management literature about the contribution of emotional intelligence to success and performance. Writers in this genre have predicted that individuals with high emotional intelligence perform better in all aspects of management. This paper outlines the development of a new emotional intelligence measure, the Workgroup Emotional Intelligence Profile, Version 3 (WEIP-3), which was designed specifically to profile the emotional intelligence of individuals in work teams. We applied the scale in a study of the link between emotional intelligence and two measures of team performance: team process effectiveness and team goal focus. The results suggest that the average level of emotional intelligence of team members, as measured by the WEIP-3, is reflected in the initial performance of teams. In our study, low emotional intelligence teams initially performed at a lower level than the high emotional intelligence teams. Over time, however, teams with low average emotional intelligence raised their performance to match that of teams with high emotional intelligence.
Resumo:
We consider a branching model, which we call the collision branching process (CBP), that accounts for the effect of collisions, or interactions, between particles or individuals. We establish that there is a unique CBP, and derive necessary and sufficient conditions for it to be nonexplosive. We review results on extinction probabilities, and obtain explicit expressions for the probability of explosion and the expected hitting times. The upwardly skip-free case is studied in some detail.
Resumo:
The reconstruction of power industries has brought fundamental changes to both power system operation and planning. This paper presents a new planning method using multi-objective optimization (MOOP) technique, as well as human knowledge, to expand the transmission network in open access schemes. The method starts with a candidate pool of feasible expansion plans. Consequent selection of the best candidates is carried out through a MOOP approach, of which multiple objectives are tackled simultaneously, aiming at integrating the market operation and planning as one unified process in context of deregulated system. Human knowledge has been applied in both stages to ensure the selection with practical engineering and management concerns. The expansion plan from MOOP is assessed by reliability criteria before it is finalized. The proposed method has been tested with the IEEE 14-bus system and relevant analyses and discussions have been presented.
Resumo:
Recent efforts in the characterization of air-water flows properties have included some clustering process analysis. A cluster of bubbles is defined as a group of two or more bubbles, with a distinct separation from other bubbles before and after the cluster. The present paper compares the results of clustering processes two hydraulic structures. That is, a large-size dropshaft and a hydraulic jump in a rectangular horizontal channel. The comparison highlighted some significant differences in clustering production and structures. Both dropshaft and hydraulic jump flows are complex turbulent shear flows, and some clustering index may provide some measure of the bubble-turbulence interactions and associated energy dissipation.
Resumo:
Business process design is primarily driven by process improvement objectives. However, the role of control objectives stemming from regulations and standards is becoming increasingly important for businesses in light of recent events that led to some of the largest scandals in corporate history. As organizations strive to meet compliance agendas, there is an evident need to provide systematic approaches that assist in the understanding of the interplay between (often conflicting) business and control objectives during business process design. In this paper, our objective is twofold. We will firstly present a research agenda in the space of business process compliance, identifying major technical and organizational challenges. We then tackle a part of the overall problem space, which deals with the effective modeling of control objectives and subsequently their propagation onto business process models. Control objective modeling is proposed through a specialized modal logic based on normative systems theory, and the visualization of control objectives on business process models is achieved procedurally. The proposed approach is demonstrated in the context of a purchase-to-pay scenario.
Resumo:
Historically, business process design has been driven by business objectives, specifically process improvement. However this cannot come at the price of control objectives which stem from various legislative, standard and business partnership sources. Ensuring the compliance to regulations and industrial standards is an increasingly important issue in the design of business processes. In this paper, we advocate that control objectives should be addressed at an early stage, i.e., design time, so as to minimize the problems of runtime compliance checking and consequent violations and penalties. To this aim, we propose supporting mechanisms for business process designers. This paper specifically presents a support method which allows the process designer to quantitatively measure the compliance degree of a given process model against a set of control objectives. This will allow process designers to comparatively assess the compliance degree of their design as well as be better informed on the cost of non-compliance.