2 resultados para Textile industry - Waste disposal
em South Carolina State Documents Depository
Resumo:
Waste from a deer-processing facility is required by law to be disposed of in any permitted municipal solid waste (Class 3) landfill or a permitted construction and demolition debris (Class 2) landfill that has specific approval to accept animal carcasses. Disposal of deer-processing waste on the property of the processing facility or at any other unpermitted site IS NOT ALLOWED. Waste from commercial deer processing facilities must be disposed of per the requirements of the S.C. Solid Waste Policy and Management Act of 1991.
Resumo:
Annually, the association publishes a journal, The Proceedings, which consists of papers presented at the annual meeting. The Casablanca Incident of 1908 by John F. Nau The South Carolina Textile Industry before 1845 by E. M. Lander, Jr. The State’s Editorial Policy Relative to South Carolina 1903-1913 by Jean Todd Carlisle