33 resultados para critical factors


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The aim of this paper is to identify and classify the numerous managerial issues encountered in the management of personnel in confined site construction. For the purpose of this research, a confined construction site is defined as a site where permanent works fit the site footprint, extending to levels above and/or below ground level, leaving spatial restrictions for other operations (e.g. plant and material movements, materials storage and temporary accommodation etc.) and require effective resource co-ordination beyond normal on-site management input. A literature review and analysis, case studies incorporating interviews and focus groups along with a questionnaire survey were used in order to gain a comprehensive insight into the issues in the management of personnel in a confined construction site environment. The following are the top five leading issues highlighted in the management of personnel in confined site construction; (1) Accidents due to an untidy site, (2) One contractor holding up another because of the lack of space, (3) A risk to personnel because of vehicular traffic on-site, (4) Difficult to facilitate several contractors at one work location, and (5) Numerous personnel working within the one space. In today’s modern environment, spatial restrictions are quickly becoming the norm in the industry. Therefore, the management of personnel on-site becomes progressively more difficult with the decrease in available space on-site. Where such environments exist, acknowledging the numerous issues highlighted above, aids site management in the supervision and co-ordination of personnel on-site, thus reducing accidents, increasing productivity and increase profit margins, in spatially restricted environments. As on-site management professionals successfully identify, acknowledge and counteract the numerous issues illustrated, the successful management of personnel on a confined construction site is achievable. By identifying the numerous issues, on-site management can proactively mitigate such issues through adopting counteractive measures and through successful identification of the traits identified.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose - To identify the critical factors causing construction disputes in Small to Medium Enterprises (SMEs) in Ireland during the recent recession period of 2007 to 2013.
Design/Methodology/Approach - A mixed method approach incorporating a literature review, case studies and questionnaire survey, with results analysed using exploratory (data reduction) factor analysis.
Findings - The results indicate seven core critical factors which result in construction disputes in SMEs in Ireland during a recession: Payment and extras; Physical work conditions; Poor financial/legal practise; Changes to the agreed scope of works; Time overrun; Defects; and Requests for increase in speed of project and long-term defects.
Research Limitations/Implications - With Ireland emerging from the current economic recession and the prevalence of SMEs to the construction sector, it is essential to document the core critical factors of construction disputes which emerge within this particular segment of the built environment.
Practical Implications - To address the adversarial nature of the construction sector and the prevalence of SMEs, it is essential to identify and document the critical factors of construction disputes within this remit. It is envisaged that the results of this research will be acknowledged, and the recommendations adopted, by construction SMEs, particularly within Ireland, as they emerge from the economic recession.
Originality/Value - This paper fulfils a gap in knowledge with the emergence of the economic recession and the identification of critical factors of construction dispute within SMEs in the Irish construction industry.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Considering the confined and complex nature of urban construction projects, labor productivity is one of the key factors attributing to project success. With the proliferation of sub-contracted labor, there is a necessity to consider the ramifications of this practice to the sector. This research aims to outline how project managers can optimise productivity levels of sub-contracted labor in urban construction projects, by addressing the barriers that most restrict these efficiency levels. A qualitative research approach is employed, incorporating semi-structured interviews based on three case studies from an urban context. The results are scrutinised using mind mapping software and accompanying analytical techniques. The findings from this research indicate that the effective on-site management of sub-contracted labor has a significant impact on the degree of success of an urban development project. The two core barriers to sub-contracted labor productivity are; 1) ineffective supervision of sub-contracted labor, and 2) lack of skilled sub-contracted labor. The implication of this research is that on-site project management play an integral role in the level of productivity achieved by sub-contracted labor in urban development projects. Therefore, on-site management situated in urban, confined construction sites, are encouraged to take heed of the findings herein and address the barriers documented. The value of this research is obtained through consideration of the critical factors; construction management professionals can mitigate such barriers, in order to optimise subcontracted labor productivity on-site.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

PurposeThe selection of suitable outcomes and sample size calculation are critical factors in the design of a randomised controlled trial (RCT). The goal of this study was to identify the range of outcomes and information on sample size calculation in RCTs on geographic atrophy (GA).MethodsWe carried out a systematic review of age-related macular degeneration (AMD) RCTs. We searched MEDLINE, EMBASE, Scopus, Cochrane Library, www.controlled-trials.com, and www.ClinicalTrials.gov. Two independent reviewers screened records. One reviewer collected data and the second reviewer appraised 10% of collected data. We scanned references lists of selected papers to include other relevant RCTs.ResultsLiterature and registry search identified 3816 abstracts of journal articles and 493 records from trial registries. From a total of 177 RCTs on all types of AMD, 23 RCTs on GA were included. Eighty-one clinical outcomes were identified. Visual acuity (VA) was the most frequently used outcome, presented in 18 out of 23 RCTs and followed by the measures of lesion area. For sample size analysis, 8 GA RCTs were included. None of them provided sufficient Information on sample size calculations.ConclusionsThis systematic review illustrates a lack of standardisation in terms of outcome reporting in GA trials and issues regarding sample size calculation. These limitations significantly hamper attempts to compare outcomes across studies and also perform meta-analyses.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Over the years, build-operate-transfer (BOT) has continuously attracted research interests. Many studies on BOT have been carried out. Variations of BOT such as build-own-operate-transfer and build-own-operate have also been reported in some relevant publications. However, few investigations thus far have been conducted for transfer-operate-transfer (TOT). Therefore, there is a knowledge gap in this particular field. TOT is a new model that is suitable for existing infrastructure and public utility projects formerly funded by the governments and currently operated by state-owned enterprises. It refers to the transfer of a running public project to a foreign business or domestic private entity. Based on four case studies carried out in the Chinese water supply industry, this paper examines why there is an increasing need for TOT projects and identifies the distinctive features of TOT practice in China. This is followed by an introduction of a framework of critical success factors (CSFs) for TOT projects. The most important factors include project profitability, asset quality, fair risk allocation, competitive tendering, internal coordination within government, employment of professional advisors, corporate governance, and government supervision. The identification of CSFs provides a useful guidance to project parties planning to participate in TOT practice.


Relevância:

40.00% 40.00%

Publicador:

Resumo:

The Construction Design and Management (CDM) Regulations (2007) is one of the most important set of health and safety regulations in the construction industry today. The aim of this research is to examine critical success factors for CDM compliance in small to medium size contractors in the UK construction industry. The objectives of the research include the identification of critical barriers in doing so along with the identification of success factors where CDM is incorporated. A mixed method approach is adopted in the identification and categorisation of the various factors encompassing a literature review, interviews and questionnaire survey. The key finding which emerge is the lack of knowledge and understanding with regards the CDM regulations with the recommendation to encourage small and medium contractor compliance through illustrating the benefits attainable. The practicality of the research is evident based on the significant uptake in the CDM by larger contractors, yet the research indicates that further insight and guidance is required to educate and inform those working within small to medium sized contractors in the UK. Where such acknowledgement and compliance is adopted, it is envisaged that this sector will benefit from reduced incidents and accidents, increased productivity while ultimately leading to a safer and more productive industry as a whole.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The construction industry notoriously excels at dispute creation – both in Ireland and world wide. This paper exams mediation in the Irish construction industry based around critical success factors in the competencies and processes required by mediators operating in the construction industry. Through conducting the relevant analysis, it was possible to extract and outline the resulting critical success factors in process and competencies of mediators in the Irish construction industry. This was achieved through a review of the literature, followed by detailed interviews from industry experts to elicit and highlight the core competencies required. To aid in the study, qualitative analysis using mind mapping software was adopted, thus assisting the identification of the key factors. Following analysis, facilitative mediation was identified as best suited for the industry in question; recommendations and experience were key for mediator selection and five and six factors were identified for mediator skills and mediation critical success factors respectively. The results returned are similar to those determined by authors in other countries and provide a good reference point for the development the industry. By following the findings of this report mediators and parties in dispute can improve processes and be more successful in outcomes. In this study the author shows that mediation is an effective and appropriate method of resolving disputes within the Irish construction industry.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This research concentrates on the critical success factors driving construction quality and the barriers that must be overcome to achieve quality in Brunei. It hopes to identify methods of quality improvement and clearly justify investment in this area of local industry. Over the past number of years, Brunei has attempted to diversify its industry from the dominant oil and gas sector into secondary sectors,
including construction. To date, very little research has been carried out in many areas of construction management that take into account the specific industry context in Brunei. A comprehensive literature review has been employed to enable a questionnaire to be constructed and distributed among Brunei construction
professionals. The results have been analyzed through mean testing. This analysis reveals that the key barriers to construction quality in Brunei relate to lack of skills, lack of clarity in responsibility and communication and poor commitment among the design team. The critical success factors include issues relating to competency, capability, commitment and effectiveness, primarily among managers and decision-makers. The results of this study will hopefully contribute to fill the knowledge gap related to construction management in the context of Brunei and facilitate movement towards improved techniques and strategies that will foster higher quality in construction. The findings can be generalised across similar
developing economies and it is suggested that in general, the management concepts governing construction quality remain similar across the borders of East and West.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Ethel Smyth’s opera, Der Wald, met with mixed reactions at its premiere in Berlin in 1902. Many factors contributed to this, not least, as Smyth herself observed, anti-British sentiment in Germany following the second Boer War. One might have expected that the reception of the opera at its British premiere on 18 July at Covent Garden might have been more positive, but even here critical opinion was divided. Even positive reviews were not free from gender discrimination, and other reviews condemned the opera for being too German or Wagnerian. What was meant by ‘Wagnerian’? This article answers the question in three ways. Firstly, I argue that ‘Wagnerian’ meant not a leitmotif-filled, through-composed work (as distinct from a number opera), but simply a lyrical drama; for British audiences the model for this was Tannhäuser or Lohengrin, not the Ring or Tristan. Secondly, taking this definition on board, I analyse the musical language of the opera, in particular the key structure. The central duet sung by the doomed lovers, Heinrich and Röschen, is in F major, almost the furthest possible distance from the home key of the opera (E major), which characterizes the forest and ‘nature’ in general; by contrast, the next scene, where the Kundry-like Iolanthe attempts to seduce Heinrich (a crucial reversal of the more conventional power relations of the love duet), sees a return to the home key. Thirdly, I set the hermeneutical implications of this reversal in the context of the decadent movement, with which late nineteenth-century Wagnerism was associated, and which, following the conviction of Oscar Wilde in 1895, was discredited. Der Wald thus failed because of its ‘guilt by association’ with an aesthetic that had fallen into disrepute.