2 resultados para Recent Tectonic Evolution
Resumo:
The Belgian coastal plain occupies a key position as it is located at the transition between the Southern North Sea Basin and the Strait of Dover. It is characterized by thick sequences (> 20 m) of Pleistocene terrestrial and littoral sediments. Yet the wider stratigraphical and palaeo-environmental significance of these sediments received little attention. In this paper we draw on the results of a recent sedimentological study based on > 100 drillings that spans the Pleistocene sequence, and present new biostratigraphical (pollen, foraminifera, ostracods) data, all revealing a complex history of deposition. The record includes evidence of the development of incised-valley systems that were initiated in the late Middle and Late Pleistocene. Five phases of fluvial incision can be identified. The majority of the infills are deposited in an estuarine environment that passes into a fluvial environment land inward, except the Weichselian infill which has a predominant fluvial origin. The greatest part of the most seaward located zone of the western coastal plain was free of valley incisions, there, shallow marine sediments built up the record. Local biostratigraphical investigations provide a timeframe. The result is placed in a regional context.
Resumo:
Ireland is a latecomer to Public Private Partnership (PPP) having only adopted it in 1998. Prior to the credit crisis, Ireland followed the UK model with PPPs being implemented in transport, education, housing/urban regeneration and water/wastewater. Having stalled during the credit crisis, PPP has been reactivated recently with the domestic infrastructure stimulus programme . The focus of this paper is on Ireland as a younger participant in PPP and the nexus between adoption patterns and sustainability characteristics of Irish PPP. Using document analysis and exploratory interviews, the paper examines the reasons for Ireland’s interest in PPP which cannot be attributed to economic rationales alone. We consider three explanations: voluntary adoption – where the UK model was closely followed as part of a domestic modernisation agenda; coercive adoption – where PPP policy was forced upon public sector organisations; and institutional isomorphism – where institutional creation and change around PPP was promoted to help public sector organisations gain institutional legitimacy. We find evidence of all three patterns with coercive adoption becoming more relevant in recent years, which is likely to affect sustainability adversely unless incentives for voluntary adoption are strengthened and institutional capacity building is boosted.