20 resultados para Project performance


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to summarize the accumulated body of knowledge on the performance of new product projects and provide directions for further research. Design/methodology/approach – Using a refined classification of antecedents of new product project performance the research results are meta-analyzed in the literature in order to identify the strength and stability of predictor-performance relationships. Findings – The results reveal that 22 variables have a significant relationship with new product project performance, of which only 12 variables have a sizable relationship. In order of importance these factors are the degree of organizational interaction, R&D and marketing interface, general product development proficiency, product advantage, financial/business analysis, technical proficiency, management skill, marketing proficiency, market orientation, technology synergy, project manager competency and launch activities. Of the 34 variables 16 predictors show potential for moderator effects. Research limitations/implications – The validity of the results is constrained by publication bias and heterogeneity of performance measures, and directions for the presentation of data in future empirical publications are provided. Practical implications – This study helps new product project managers in understanding and managing the performance of new product development projects. Originality/value – This paper provides unique insights into the importance of predictors of new product performance at the project level. Furthermore, it identifies which predictor-performance relations are contingent on other factors.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Few studies to date have paid attention to relationship management when addressing performance problems. To bridge the knowledge gap, a questionnaire survey is conducted to analyze the impact of relationship management on project performance in construction. The analysis reveals that the deterioration of working relationships may increase the likelihood of poor performance. Poor performance can be effectively reduced by improving some aspects of working relationships. Collaborative working contributes to performance improvement, in which long-term collaboration is more effective than short-term collaboration. In addition to the questionnaire survey, a series of expert interviews provide a deeper insight into effective relationship management.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Since the first launch of the new engineering contract (NEC) in 1993, early warning of problems has been widely recognized as an important approach of proactive management during a construction or engineering project. Is early warning really effective for the improvement of problem solving and project performance? This is a research question that still lacks a good answer. For this reason, an empirical investigation was made in the United Kingdom (U.K.) to answer the question. This study adopts a combination of literature review, expert interview, and questionnaire survey. Nearly 100 questionnaire responses were collected from the U.K. construction industry, based on which the use of early warning under different forms of contract is compared in this paper. Problem solving and project performance are further compared between the projects using early warning and the projects not using early warning. The comparison provides clear evidence for the significant effect of early warning on problem solving and project performance in terms of time, cost, and quality. Subsequently, an input-process-output model is developed in this paper to explore the relationship among early warning, problem solving, and project
performance. All these help construction researchers and practitioners to better understand the role of early warning in ensuring project success.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Good performance characterizes project success and value for money. However, performance problems are not uncommon in project management. Incentivization is generally recognized as a strategy of addressing performance problems. This chapter aims to explore incentive mechanisms and their impact on project performance. It is mainly based on the use of incentives in construction and engineering projects. The same principles apply to project management in other industry sectors. Incentivization can be used in such performance areas as time, cost, quality, safety and environment. A client has different ways of incentivizing his contractor’s performance, e.g. (1) a single incentive or multiple incentives; and (2) incentives or disincentives or a combination of both. The establishment of incentive mechanisms proves to have a significant potential for relationship development, process enhancement and performance improvement. In order to ensure the success of incentive mechanisms, both contractors and clients need to make extra efforts. As a result, a link is developed among incentive mechanisms, project management system and project performance.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Early contractor involvement is a topic that has attracted attention from construction practitioners and researchers in the UK since the 1990s. It has been adopted to introduce construction knowledge and experience to the design process, and to integrate design with construction. In contrast with the limited number of previous studies on early contractor involvement, which used case studies, a questionnaire survey was conducted in this study, to investigate the application of early contractor involvement in current practice and its impact on project performance in terms of time, cost and quality. From an analysis of the questionnaire results, early contractor involvement is found to be increasingly used in the construction industry, and to have a significant impact on cost and time performance. This research provides empirical evidence related to the practice of early contractor involvement. It demonstrates the major influence of early contractor involvement on management processes and working relationships during a project, which contribute to performance improvement and project success.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The overall intent of this research is to provide architects with information that can be used to improve their performance so as to optimally satisfy the client's requirements and achieve high-quality overall project performance in Nigerian construction industry. Architect performance criteria were identified based on literature within the domain of architect responsibilities. The assessment of architects’ performance was carried out through a questionnaire survey of clients of recently completed building projects in Nigeria. Analysis of data includes comparison of criteria using importance–performance index analysis. Factor analysis was carried out on criteria where architects are falling below average, to group and explore the latent structure of the criteria in the data. The results showed that the architect needs to focus on management skills and ability, buildability, design quality, project communication, project integration and client focus. These results would encourage architects to perform better within their full responsibilities in the building delivery process and deliver high-quality projects within Nigerian construction industry.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The importance of inter-organizational trust to project success has been increasingly highlighted in the construction industry. This study aims to explore the role of trust between project parties. It adopts a combination of quantitative and qualitative methodologies. Based on the analysis of the responses of a questionnaire survey, trust is demonstrated to have a significant contribution to the development of cooperative or collaborative relationships; fostering trust proves to have a major influence on the improvement of project performance; and some relationship and performance indicators are found to have closer associations with trust than others so that trust is more important to
the development of relationship and the improvement of performance in these aspects. The analysis of questionnaire responses also provides significant evidence for the reduction in monitoring and control following the increase of mutual trust. The questionnaire survey is followed by a series of expert interviews, both of which contribute to the establishment of a model that links trust with relationship and performance and distinguishes the new approach that is based on trust from the traditional mechanism that relies on monitoring and control.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Suppliers are increasingly involved in buyer firms’ interorganizational new product development (NPD) teams. Yet the transfer of knowledge within this context may be subject to varying degrees of causal ambiguity, potentially limiting the effect of supplier involvement on performance. We develop a theoretical model exploring the effect of supplier involvement practices on the level of causal ambiguity within interorganizational NPD teams, and the subsequent impact on competitor imitation, new product advantage, and project performance. Our model also serves as a test of the paradox that causal ambiguity both inhibits imitation by competitors, but also adversely affects organisational outcomes. Results from an empirical study of 119 R&D intensive manufacturing firms in the United Kingdom largely support these hypotheses. Results from structural equation modeling show that supplier involvement orientation and long-term commitment lower causal ambiguity within interorganizational NPD teams. In turn, this lower causal ambiguity generates a new product advantage and increases project performance for the buyer firm, but has no significant effect on competitor imitation. Instead, competitor imitation is delayed by the extent to which the firm develops a new product advantage within the market. These results shed light on the causal ambiguity paradox showing that lower causal ambiguity during interorganizational new product development increases both product and project performance, but without reducing barriers to imitation. Product development managers are encouraged to utilize supplier involvement practices to minimise ambiguity in the NPD project, and to target their supplier involvement efforts on solving causally ambiguous technological problems to sustain a competitive advantage.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Abstract: Purpose – The aim of this paper is to examine and compare the performance of architects with respect to clients' rating of importance over a set of performance criteria in Nigerian public and private sector building projects. Design/methodology/approach – A survey involving clients from both public and private sectors of recently completed building projects in Nigeria was undertaken. Data analysis includes comparing similarities and differences using standardised ratio, Mann Whitney U and Wilcoxon tests. Findings – The results show that private sector clients are likely to be more concerned with cost, while public sector clients are more concerned with buildability of design. A total of 79 per cent of the criteria were similarly selected by both sectors with respect to importance of the criteria. Architects need to improve their performance significantly in about 82 per cent of the whole set of 28 criteria. The architects performed better in the public sector than the private sector and 14 per cent of the criteria were indicated as being statistically different in terms of architects' performance. Originality/value – The results provide feedback which can be incorporated in architects' future projects so as to ensure successful project implementation in the building delivery process.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The development of computer-based devices for music control has created a need to study how spectators understand new performance technologies and practices. As a part of a larger project examining how interactions with technology can be communicated to spectators, we present a model of a spectator's understanding of error by a performer. This model is broadly applicable throughout HCI, as interactions with technology are increasingly public and spectatorship is becoming more common.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A full-scale seven-storey in-situ advanced reinforced concrete building frame was constructed in the Building Research Establishment's Cardington laboratory encompassing a range of different concrete mixes and construction techniques. This provided an opportunity to use in-situ non-destructive test methods, namely Lok and CAPO tests, on a systematic basis during the construction of the building. They were used in conjunction with both standard and temperature-matched cube specimens to assess their practicality and their individual capabilities under field conditions. Results have been analysed and presented to enable comparisons of the performance of the individual test methods employed.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This is a paper about resistance and affordance as they relate to music-making in the most extended sense, and perhaps about empathy if this is understood as a capacity to ‘read’ the resistances and affordances of objects, bodies, people and environments. It proceeds from a set of broad working assumptions which inform one individual’s musical practice, via a description a musical-instrument making project which is a hybrid of physical and virtual elements and is designed to test those assumptions, to a speculative finale in which it is suggested that musicking might, in some circumstances, be regarded in itself as a form of resistance. It moves from the intimate and personal, through what might be regarded as local concerns to more global observation, prefiguring the structure of the performance system it describes: the Virtual-Physical Feedback flute

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Cancer registries must provide complete and reliable incidence information with the shortest possible delay for use in studies such as comparability, clustering, cancer in the elderly and adequacy of cancer surveillance. Methods of varying complexity are available to registries for monitoring completeness and timeliness. We wished to know which methods are currently in use among cancer registries, and to compare the results of our findings to those of a survey carried out in 2006.

Methods
In the framework of the EUROCOURSE project, and to prepare cancer registries for participation in the ERA-net scheme, we launched a survey on the methods used to assess completeness, and also on the timeliness and methods of dissemination of results by registries. We sent the questionnaire to all general registries (GCRs) and specialised registries (SCRs) active in Europe and within the European Network of Cancer Registries (ENCR).

Results
With a response rate of 66% among GCRs and 59% among SCRs, we obtained data for analysis from 116 registries with a population coverage of ∼280 million. The most common methods used were comparison of trends (79%) and mortality/incidence ratios (more than 60%). More complex methods were used less commonly: capture–recapture by 30%, flow method by 18% and death certificate notification (DCN) methods with the Ajiki formula by 9%.

The median latency for completion of ascertainment of incidence was 18 months. Additional time required for dissemination was of the order of 3–6 months, depending on the method: print or electronic. One fifth (21%) did not publish results for their own registry but only as a contribution to larger national or international data repositories and publications; this introduced a further delay in the availability of data.

Conclusions
Cancer registries should improve the practice of measuring their completeness regularly and should move from traditional to more quantitative methods. This could also have implications in the timeliness of data publication.