2 resultados para Managing change


Relevância:

60.00% 60.00%

Publicador:

Resumo:

Aims/Purpose: Protocols are evidenced-based structured guides for directing care to achieve improvements. But translating that evidence into practice is a major challenge. It is not acceptable to simply introduce the protocol and expect it to be adopted and lead to change in practice. Implementation requires effective leadership and management. This presentation describes a strategy for implementation that should promote successful adoption and lead to practice change.
Presentation description: There are many social and behavioural change models to assist and guide practice change. Choosing a model to guide implementation is important for providing a framework for action. The change process requires careful thought, from the protocol itself to the policies and politics within the ICU. In this presentation, I discuss a useful pragmatic guide called the 6SQUID (6 Steps in QUality Intervention Development). This was initially designed for public health interventions, but the model has wider applicability and has similarities with other change process models. Steps requiring consideration include examining the purpose and the need for change; the staff that will be affected and the impact on their workload; and the evidence base supporting the protocol. Subsequent steps in the process that the ICU manager should consider are the change mechanism (widespread multi-disciplinary consultation; adapting the protocol to the local ICU); and identifying how to deliver the change mechanism (educational workshops and preparing staff for the changes are imperative). Recognising the barriers to implementation and change and addressing these locally is also important. Once the protocol has been implemented, there is generally a learning curve before it becomes embedded in practice. Audit and feedback on adherence are useful strategies to monitor and sustain the changes.
Conclusion: Managing change successfully will promote a positive experience for staff. In turn, this will encourage a culture of enthusiasm for translating evidence into practice.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Muddy floods occur when rainfall generates runoff on agricultural land, detaching and transporting sediment into the surrounding natural and built environment. In the Belgian Loess Belt, muddy floods occur regularly and lead to considerable economic costs associated with damage to property and infrastructure. Mitigation measures designed to manage the problem have been tested in a pilot area within Flanders and were found to be cost-effective within three years. This study assesses whether these mitigation measures will remain effective under a changing climate. To test this, the Water Erosion Prediction Project (WEPP) model was used to examine muddy flooding diagnostics (precipitation, runoff, soil loss and sediment yield) for a case study hillslope in Flanders where grass buffer strips are currently used as a mitigation measure. The model was run for present day conditions and then under 33 future site-specific climate scenarios. These future scenarios were generated from three earth system models driven by four representative concentration pathways and downscaled using quantile mapping and the weather generator CLIGEN. Results reveal that under the majority of future scenarios, muddy flooding diagnostics are projected to increase, mostly as a consequence of large scale precipitation events rather than mean changes. The magnitude of muddy flood events for a given return period is also generally projected to increase. These findings indicate that present day mitigation measures may have a reduced capacity to manage muddy flooding given the changes imposed by a warming climate with an enhanced hydrological cycle. Revisions to the design of existing mitigation measures within existing policy frameworks are considered the most effective way to account for the impacts of climate change in future mitigation planning.